Part 21 Report - 1999-013

ACCESSION #: 9903180200


The Boeing Company
P.O. Box 3707
Seattle, WA 98124-2207

March 8, 1999

G-1151-SJA-98-131

Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555

Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R. S. Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L. J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21 Inquiry

Dear Sir or Madam:

In accordance with the reference correspondence and 10 CFR 21, Boeing is sending the NRC the attached error notice(s) received from our former software suppliers. Because of unknown current addresses, the following former customers were not notified:

Reactor Controls, Inc.

Echo Energy Consultants, Inc.

Nuclear Applications and Systems Analysis Company (Japan)

Nuclear Power Services

Error notices have been sent to our other former customers.

Very truly yours,

Sandra J. Andrews
Nuclear Administrator
Phone: (425) 865-6248
FAX: (425) 865-4851
Mail Stop: 7A-33, or
e-mail: Sandra.J.Andrews@Boeing.com


Enclosure(s): GTSTRUDL Report Form 99.03, 99.04
Georgia Institute of Technology GTSTRUDL [Registered Trademark]
 
  March 1, 1999
 
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O. Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
 
RE: GT STRUDL

Dear Sir or Madam:

Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 99.03, 99.04, and a GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTSTRUDL Program Report.

Thank you for reviewing the Program Report and for returning the Acknowledgement Form.

Best regards,

CASE Center

David C. Key
Configuration Control Manager


Enclosures
Computer Aided Structural Engineering Center Phone: (404) 894-2260
School of Civil & Environmental Engineering Fax: (404) 894-8014
Atlanta, Georgia 30332-0355 USA casec@ce.gatech.edu


A Unit of the University System of Georgia

GTSTRUDL Program Report Form

  GPRF No.: 0103
  DATE:
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
 
SEVERITY LEVEL:
  X URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job.
  SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task.
  MINOR Problem can be worked around or problem poses high frustration factor.
  INFORMATIVE Documentation error, program usage tip, user inconveniences.
 
Date Problem Confirmed
Date Notification Sent
Computers ALL
Operating System ALL
Version All version between 87.01 and 98.01 including 87.01 and 98.01
Target Release for Correction 9901
  Director ASD
Signature Title
 
R & D Division
Kenneth Will
 
 
Typed or Printed Name Date of Signature
 
Signature Title
 
Professional Services Division
 
 
Typed or Printed Name Date of Signature

Rev. 2.2


GTSTRUDL Program Report Form (Continued)

GPRF No.:
DATE:

DESCRIPTION:

If a user specifies a finite element in the SUPERSTRUCTURE (LOAD PATH) for the Moving Load Generator, an abort may occur. An abort will occur under the following conditions:

a. If the first two nodes of the finite element are contiguous with the first or second node of a member that precedes or follows the finite element in the LOAD PATH.
b. If the model contains only finite elements and the list of elements in the LOAD PATH are elements in which the first two nodes form a contiguous line.

Example:

Moving Load Generator

Load Path Members 100 2 to 10

The second node of finite element 100 is the same as the first node of member 2.

Applicable Section of the Users Manual: Section 2.1.11.3.5.3 of Volume 1 - SUPERSTRUCTURE Command

Rev. 2.2


GTSTRUDL Program Report Form

  GPRF No.:
  DATE:
 
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
    X URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job.
SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task.
MINOR Problem can be worked around or problem poses high frustration factor.
INFORMATIVE Documentation error, program usage tip, user inconveniences.
  
Date Problem Confirmed
Date Notification Sent
Computers ALL
Operating System ALL
Version All versions between 81.05 and 98.01 including 81.05 and 98.01
Target Release for Correction 9901
  Director ASD
 
Signature Title
 
R & D Division
 
Kenneth Will
 
Typed or Printed Name Date of Signature
 
Signature Title
 
Professional Services Division
 
Typed or Printed Name Date of Signature
 

Rev. 2.2


GTSTRUDL Program Report Form(Continued)

GPRF No.:
DATE:

DESCRIPTION:

If the user specifies a FORM LOAD command and does not leave a space between the loading name and a negative loading factor, an error will not be reported and an incorrect loading will not be formed.

Example:

FORM LOAD 100 FROM 11.0 2-4.0

In the above example, there is not a space between the 2 and the -4.0 and no error will be reported. Loading 100 will be formed from only Loading 1.

Applicable Section of the Users Manual: Section 2.1.11.3.2 of Volume 1 - FORM LOAD Command