Part 21 Report - 1998-134

ACCESSION #: 9804150252 The Boeing Company P.O. Box 3707 Seattle, WA 98124-2207 BOEING April 9, 1998 G-1151-SJA-98-186 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R. S. Orr to the NRC Operations Center b) NRC Letter Docket No. 99901227 dated August 12, 1992; L. J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21 Inquiry Dear Sir or Madam: In accordance with the reference correspondence and 10 CFR 21, Boeing is sending the NRC the attached error notice(s) received from our former software suppliers. Because of unknown current addresses, the following former customers were not notified: Reactor Controls, Inc. Echo Energy Consultants, Inc. Nuclear Applications and Systems Analysis Company (Japan) Nuclear Power Services Error notices have been sent to our other former customers. Very truly yours, Sandra J. Andrews Nuclear Administrator Phone: (425) 865-6248 FAX: (425) 865-4851 Mail Stop: 7A-33, or e-mail: sandra.j.andrews@boeing.com Enclosure(s): GTSTRUDL Program Report Form 98.07 Georgia Institute of Technology GT STRUDL [Registered Trademark] March 24, 1998 Attention: Nuclear Administrator Boeing Information & Support Services P.O. Box 24346, M/S 7A-33 Seattle, Washington 98124-0346 RE: GT STRUDL Dear Sir or Madam: Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 98.07, and a GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTSTRUDL Program Report. Thank you for reviewing the Program Report and for returning the Acknowledgement Form. Best regards, CASE Center David C. Key Configuration Control Manager Enclosures Computer Aided Structural Engineering Center Phone: (404) 894-2260 School of Civil & Environmental Engineering Fax: (404) 894-8014 Atlanta, Georgia 30332-0355 USA casec@ce.gatech.edu A Unit of the University System of Georgia GTSTRUDL Program Report Form GPRF No.: 98.07 DATE: FROM: Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 SEVERITY LEVEL: _ URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. _ SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. _ MINOR Problem can be worked around or problem poses high frustration factor. X INFORMATIVE Documentation error, program usage tip, user inconveniences. Date Problem Confirmed March 23, 1998 Date Notification Sent Computers PC Operating System Windows NT and 95.DOS Versions: 97.01 Target Release for Correction: Revision Q Signature Title R & D Division Typed or Printed Name Date of Signature Signature Title Professional Services Division Typed or Printed Name Date of Signature Rev. 2.2 GTSTRUDL Program Report Form (Continued) GPRF No.: DATE: DESCRIPTION: There were a number of discrepancies discovered in the Revision P Update Documentation that was sent out with the 9701 update. These changes do not influence any previous versions or corrections of program. The following corrections have been made: Abstract of Commands: Corrections were made to pages 174 and 174.1, but page 174 is still Revision M, not Revision P. Page 211.2 was missing in the Revision P packet; it has been added and the front/back formatting of pages 209 to 212 has been corrected. The revision number has been added to pages 254 and 255. The front/back formatting of pages 253.7 to 256 has been corrected. Volume 1 Pages 2.1.8-28, 2.1.11-80.8, 2.1.11-122 and 2.1.14-8.1 were blank pages in the Revision P update, but did not explicitly say so. "This page intentionally left blank" has been added. Revision numbers have been added to pages 2.1.14-6, 2.1.14-7, and 2.1.14- 7.1. The replacement instructions for Appendix A will be added to the upcoming Revision Q packet. Volume 3 The collating instructions for the Table of Contents, R-1 to R-8, etc. will be corrected in Revision Q. The collating instructions for pages 2.5.6-1/2.5.6-2 will be corrected in Revision Q. Pages 2.6.3-9 and 2.6.3-46 have been added, and the front/back formatting of pages 2.6.3-9 to 2.6.3- Rev. 2.2 (CONTINUED) 46 has been corrected. The page number has been added to page 3.5.2-10. Volumes 5 and 6 The collating instructions for these updates will be corrected in Revision Q. Rev. 2.2 *** END OF DOCUMENT ***

Page Last Reviewed/Updated Wednesday, March 24, 2021