Part 21 Report - 1997-552

ACCESSION #: 9709170210 Information & Support Services P.O. Box 3707 Seattle, WA 98124-2207 September 12, 1997 G-1151-SJA-97-426 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R. S. Orr to the NRC Operations Center b) NRC Letter Docket No. 99901227 dated August 12, 1992; L. J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21 Inquiry Dear Sir or Madam: In accordance with the reference correspondence and 10 CFR 21, Boeing is sending the NRC the attached error notice(s) received from our former software suppliers. Because of unknown current addresses, the following former customers were not notified: Reactor Controls, Inc. Echo Energy Consultants, Inc. Nuclear Applications and Systems Analysis Company (Japan) Nuclear Power Services Error notices have been sent to our other former customers. Very truly yours, Sandra J. Andrews Nuclear Administrator Phone: (206) 865-6248 FAX: (206) 865-4851 Mail Stop: 7A-33, or e-mail: Sandra.Andrews@PSS.Boeing.com Enclosure(s): GTSTRUDL Program Report Forms 97.10., 97.11 and 97.12 Georgia Institute of Technology GT TRUDL [Registered Copy] SEP 10 1997 September 3, 1997 Attention: Nuclear Administrator Boeing Information & Support Services P.O.Box 24346, M/S 7A-33 Seattle, Washington 98124-0346 RE: GT STRUDL Dear Sir or Madam: Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM 97.10, 97.11, 97.12 and a GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM. Please sign and return the GTSTRUDL QA CUSTOMER ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTSTRUDL Program Report. Thank you for reviewing the Program Report and for returning the Acknowledgement Form. Best regards, CASE Center David C. Key Configuration Control Manager Enclosures Computer Aided Structural Engineering Center Phone: (404) 894-2260 School of Civil & Environmental Engineering Fax: (404) 894-8014 Atlanta, Georgia 30332-0355 USA casec@ce.gatech.edu A Unit of the University System of Georgia GTSTRUDL Program Report Form GPRF No.: DATE: FROM: Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 SEVERITY LEVEL: X URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. _ SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. _ MINOR Problem can be worked around or problem poses high frustration factor. _ INFORMATIVE Documentation error, program usage tip, user inconveniences. Date Problem Confirmed August 22, 1997 Date Notification Sent Computers All Operating System All Version 94.01 and later Target Release for Correction 97.01 Mod 1 Mgr. ASD Signature Title R & D Division Michael H. Swanger Typed or Printed Name Date of Signature Signature Title Professional Services Division Typed or Printed Name Date of Signature Rev. 2.2 GTSTRUDL Program Report Form (Continued) GPRF No.: DATE: DESCRIPTION: The PERFORM CABLE PRESTRESS ANALYSIS command aborts if joint coordinates are missing for any node of any IPCABLE element specified in the INCLUDE ELEMENTS options of the DEFINE CABLE NETWORK commands. There is no work around other than to make certain that joint coordinates are specified for all IPCABLE elements in the model. GTSTRUDL User Reference Manual Sections: Nonlinear Static Analysis of Cable Section 2.6.3, Volume Structure 3, Rev. P Rev. 2.2 GTSTRUDL Program Report Form GPRF No.: DATE: FROM: Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 SEVERITY LEVEL: X URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. _ SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. _ MINOR Problem can be worked around or problem poses high frustration factor. _ INFORMATIVE Documentation error, program usage tip, user inconveniences. Date Problem Confirmed September 2, 1997 Date Notification Sent Computers All Operating System All Version 94.01 and later Target Release for Correction 97.01 Mod 1 Mgr. ASD Signature Title R & D Division Michael W Swanger Typed or Printed Name Date of Signature Signature Title Professional Services Division Typed or Printed Name Date of Signature Rev. 2.2 GTSTRUDL Program Report Form (Continued) GPRF No.: DATE: DESCRIPTION: Stress results produced by the LIST CABLE ANALYSIS RESULTS and LIST STRESS commands are incorrect for the IPCABLE element if there are any element loads, including self weight from the ELEMENT PROPERTIES command, defined for the element. This error can be verified by comparing the element stress results at the starting or ending element node produced by these commands to the stress at the starting or ending node computed by the following relationship: Equation "1" omitted where, F sub x = global X nodal force at starting or ending node, F sub y = global Y nodal force at starting or ending node, F sub z = global Z nodal force at starting or ending node, AX = element cross section area. The magnitude of the percent stress error at the starting or ending node of the element can be estimated from the following relationship: Equation "2" omitted. where, Symbol omitted sub err = percent stress error estimate, f sub x = total global X IPCABLE element load, f sub y = total global Y IPCABLE element load, f sub z = total global Z IPCABLE element load, Symbol omitted = element starting or ending nodal stress from Eq. 1. Rev. 2.2 As a work-around, the stress at the starting or ending node of an IPCABLE element can be computed from Eq. 1. GTSTRUDL User Reference Manual Sections: Nonlinear Static Analysis of Cable Section 2.6.3, Volume 3, Structure Rev. P The LIST Command for Finite Element Section 2.3.7.1, Volume 3, Results Rev. D Rev. 2.2 GTSTRUDL Program Report Form GPRF No.: DATE: FROM: Computer-Aided Structural Engineering Center Georgia Institute of Technology Atlanta, Georgia 30332-0355 SEVERITY LEVEL: X URGENT Problem results in incorrect answers which may not be apparent or job aborts and cannot be recovered within the session or job. _ SERIOUS Problem results in incorrect answers which are obvious or problem prevents completion of a particular user's task. _ MINOR Problem can be worked around or problem poses high frustration factor. _ INFORMATIVE Documentation error, program usage tip, user inconveniences. Date Problem Confirmed September 2, 1997 Date Notification Sent Computers PC Operating System DOS, NT, Windows 95 Version 94.01 and later Target Release for Correction 97.01 Mod 1 Mgr. ASD Signature Title R & D Division Michael H. Swanger Typed or Printed Name Date of Signature Signature Title Professional Services Division Typed or Printed Name Date of Signature Rev. 2.2 GTSTRUDL Program Report Form (Continued) GPRF No.: DATE: DESCRIPTION: Nonlinear analysis will abort if variable members are active in the model. A work-around is to use additional joints and members to model variable member properties. GTSTRUDL User Reference Manual Sections: The MEMBER PROPERTIES Command Section 2.1.9.2, Volume 1, Rev. M Rev. 2.2 *** END OF DOCUMENT ***

Page Last Reviewed/Updated Wednesday, March 24, 2021