Part 21 Report - 1997-405
ACCESSION #: 9707150333
Interim Report (97-004)
Subject:
Interim report of evaluation of a deviation pursuant to 10 CFR
21.21(a)(2)
Title:
Critical Power Methodology for ATRIUM-10
Identification of Basic Activity:
BWR ANFB Dryout Correlation for ATRIUM-10 Fuel Design
Basic Activity Supplied By:
Siemens Power Corporation - Nuclear Division
Nature of Deviation:
This is in response to the NRC identified nonconformance associated with
development of the dryout correlation used for the ATRIUM-10 fuel design
observed during NRC Inspection 99900081/97-01. Additional testing and
correlation development is required.
Discovery Date:
May 13, 1997
Corrective Actions to Date:
Nonconformance report (NCR-6113) was prepared and processed by management
review team as required by SPC-ND's Quality Assurance Manual, EMF-1. To
date, additional dryout testing is proceeding on schedule. The NRC was
apprised of the status on July 8, 1997.
Evaluation Completion Schedule Date:
Submittal of a revised correlation is expected by November 1, 1997
*** END OF DOCUMENT ***