Part 21 Report - 1996-503
ACCESSION #: 9612180383
10 CFR PART 21
NOTIFICATION
GE Nuclear Energy November 5, 1996
SC96-06
TO: Carolina Power & Light Co. PECO Energy Co.
DTE Energy Southern Nuclear Operating Co.
Entergy Operations, Inc. Tennessee Valley Authority
Florida Power & Light Co. Vermont Yankee Nuclear Power
Nebraska Public Power District Corp.
SUBJECT: HGA Relay Armature Binding
Reportable Condition [21.2] (c)] 80 Day Interim Report
[21.2] (a) (2)]
X Transfer of Information [21.2](b)] Safety Information Commu-
nication
Reference: GE Relay Service Advice Letter (SAL) 516.1, "HGA Armature
Binding," October 17, 1996.
SUMMARY:
This Notification provides information concerning the potential for
incorrect operation, due to armature binding, of safety related GE HGA
relays manufactured between January 1989 and June 1991. The relays were
manufactured by GE Electrical Distribution and Control (GE-ED&C), Power
Management, Malvern, PA, and supplied by GE Nuclear Energy (GE-NE) as
safety related components.
For relays supplied for balance-of-plant (BOP) or unspecified (UNS)
applications, as well as most relays supplied for nonspecific
applications (i.e., to a panel Master Parts List number), it is not
possible for GE-NE to evaluate the safety significance of potential
failures to determine if a defect exists on the context of 10 CFR Part
21. We are therefore transferring the available information to the
affected utilities for evaluation.
Issued by:
M. A. Smith, Manager
Safety Evaluation Project
GE Nuclear Energy, M/C 187
175 Curtner Avenue, San Jose, CA 95195
Illegible print.
FARWELL & HENDRICKS, INC.
4600 EAST TECH DRIVE
CINCINNATI, OHIO 45245
TELEPHONE: (513) 528-7900
TELECOPY: (513) 528-9292
URGENT TELECOPIER INFORMATION
TIME AM/PM DATE:
TO: FROM
COMPANY
NAME DEPT.:
TELEPHONE: TELEPHONE: (513) 528-7900
TELECOPY: TELECOPY: (513) 528-9292
Total Number of Pages: (Including Cover Page)
Comments:
If problems occur in the transmission of this telecopy, please call (513)
528-7900.
[Illegible print]
GENERAL INFORMATION or OTHER EVENT NUMBER: 31450
LICENSEE: FAREWELL & HENDRICKS NOTIFICATION DATE: 12/13/96
CITY: CINCINNATI REGION: 3 NOTIFICATION TIME: 15:08 [ET]
COUNTY: STATE: OH EVENT DATE: 12/13/96
LICENSE#: AGREEMENT: N EVENT TIME: 00:00 [EST]
DOCKET: LAST UPDATE DATE: 12/13/96
NOTIFICATIONs
NRC NOTIFIED BY: MARK D. McCLUNG VERN HODGE, RVIB NRR
HQ OPS OFFICER: LEIGH TROCINE
EMERGENCY CLASS: NOT APPLICABLE
10 CFR SECTION:
CCCC 21.21 UNSPECIFIED PARAGRAPH
EVENT TEXT
POTENTIAL FOR INCORRECT OPERATION (ARMATURE BINDING) OF
SAFETY-RELATED
GE-TYPE HGA RELAYS MANUFACTURED BETWEEN JANUARY 1989 AND JUNE 1991
BY GE
ELECTRICAL DISTRIBUTION AND SUPPLIED BY GE NUCLEAR ENERGY
FAREWELL & HENDRICKS, INC., PROVIDED NOTIFICATION VIA FACSIMILE
REGARDING
INFORMATION RECEIVED FROM FLORIDA POWER & LIGHT CO. APPLICABLE TO
SAFETY-
RELATED GE-TYPE HGA RELAYS. BASED UPON THIS INFORMATION, FAREWELL
&
HENDRICKS DETERMINED THAT TWO UTILITIES HAVE BEEN PROVIDED WITH
DEDICATED
RELAYS THAT ARE AFFECTED. RELAYS PROVIDED TO NORTHEAST NUCLEAR
ENERGY
CO. UNDER NORTHEAST UTILITIES PURCHASE ORDER # C92J1798 WERE
MANUFACTURED DURING THE TIME FRAME INDICATED. FAREWELL &
HENDRICKS PLANS
TO NOTIFY THOSE UTILITIES IN ACCORDANCE WITH THE RESPECTIVE
PROCUREMENT
DOCUMENTS.
INFORMATION REGARDING THE POTENTIAL FOR INCORRECT OPERATION OF
THESE
RELAYS WAS SENT BY GE NUCLEAR ENERGY LOCATED IN SAN JOSE,
CALIFORNIA TO
THE FOLLOWING COMPANIES ON NOVEMBER 5, 1996: CAROLINA POWER & LIGHT
CO.;
DTE ENERGY; ENTERGY OPERATIONS, INC.; FLORIDA POWER & LIGHT CO.;
NEBRASKA
PUBLIC POWER DISTRICT; PECO ENERGY CO.; SOUTHERN NUCLEAR OPERATING
CO.;
TENNESSEE VALLEY AUTHORITY; AND VERMONT YANKEE NUCLEAR POWER
CORP.
Inter-Office Correspondence
FPL
To: D. E. Jernigan Date: November 22, 1996
J. Scarola c/o J. T. Voorhees
From: R. A. Symes Department: JNA/JB
Subject: POTENTIAL 10 CFR 21
Reference: Letter from M. A. Smith, GE Nuclear Energy, to Carolina Power
& Light, et al, dated November 5, 1996
The above references is a potential Part 21 notification associated with
the potential for incorrect operation, due to armature binding, of safety
related GE HGA relays manufactured between January 1989 and June 1991 by
GE Electrical Distribution and supplied by GE Nuclear Energy.
This notification was received by the Supervisor Performance Assessment
on November 22, 1996 at 1:25 PM.
According to the above reference, GE Nuclear Energy is unable to
evaluated the safety significance of potential failures to determine if a
defect exist in the context of 10CFR21.
The plant should perform an operability assessment and take appropriate
action to assure that the evaluation, notification, corrective action,
reporting, and record keeping are performed in accordance with
10CFR50.72, 10CFR50.73, 10CFR50.73, 10CFR73.71 or 10CFR21 as appropriate.
In accordance with IP 801, addressees are required to return this cover
letter to the supervisor Performance Assessment with receipt
acknowledgement and specific plant tracking system identification.
R. A. Symes
Supervisor Performance Assessment Acknowledged By Date
RAS/MRM/crr
JQA-96-1002
Condition Report Number
cc:
T. V. Abbatiello JNA/PTN G. E. Hollinger LIC/PTN
R. J. Acosta JPN (JNA)/JB T. G. Kreinberg NMM/PSL
J. A. Baysinger JNA//JB J. T. Luke JPN/JB
L. W. Bladow JNA/PSL H. N. Paduano JPN/JB
G. J. Boissy NMM/PSL R. E. Rose NMM/PTN
K. R. Craig JPN/JB E. J. Weikan LIC/PSL
D. J. Denver JPN/PSL Part 21 File JNA/JB
C. F. Ferriday JNI/JB
*** END OF DOCUMENT ***