Part 21 Report - 1995-107
ACCESSION #: 9504180193
Boeing Computer Services
P.O. Box 24346
Seattle. WA 98124-0346
BOEING
April 11, 1995
G-1151-RSO-95-168
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992;
R.S. Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L.
J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
Inquiry
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers. Because of unknown current addresses, the following
former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
Very truly yours,
R. S. Orr
Nuclear Administrator
G-1151 M/S 7A-33
(206) 865-6248
Attachment(s): GTICES Program Report Form No. 95.07
Georgia Tech Computer Aided Structural Engineering Center
Georgia Institute of Technology,
School of Civil & Environmental Engineering
Atlanta, Georgia 30332-0355
USA
404 o 894 o 2260
404 o 894 o 8013 FAX
March 29, 1995
Attention: Nuclear Administrator
Boeing Computer Services
P.O. Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find a copy of GTICES PROGRAM REPORT FORM No. 95.07 and a
VENDOR ACKNOWLEDGEMENT FORM. Please sign and return the VENDOR
ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTICES Program Report.
Thank you for reviewing the Program Report and for returning the
Acknowledgement Form.
Best regards,
CASE Center
Catherine Lee
Configuration Control Manager
CL/apw
Enclosures
GTSTRUDL Program Report Form
GPRF No.: 95-07
DATE: March 28, 1995
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL:
x URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within
the session or job.
-- SERIOUS Problem results in incorrect answers which are
obvious or problem prevents completion of a
particular user's task.
-- MINOR Problem can be worked around or problem poses high
frustration factor.
-- INFORMATIVE Documentation error, program usage tip, user
inconveniences.
Date Problem Confirmed March 28, 1995
Date Notification Sent March 30, 1995
Computers All but PC
Operating System All
Version All versions prior to and including 9401
Target Release for Correction 95.01
Signature Title
R & D Division
Typed or Printed Name Date of signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.: 95.07
DATE: March 28, 1995
DESCRIPTION:
In the MODEL MERGE function of GTModeler, a model restored with the
NEW MERGE menu selection causes STRUDL to abort when the merge is
performed and section properties have been specified. Typically, NEW
MERGE would be used to restore a model for a second merge. A work-around
is to exit Modeler to the command mode of STRUDL after the, First merge
and then to. reenter Modeler in order to perform the second merge.
Relevant Documentation:
MERGE - GTSTRUDL User's Manual, Volume 6,
Chapter 15.
COMMAND MODE - GTSTRUDL User's Manual, Volume 6,
Section 3. 11.
Rev. 2.2
*** END OF DOCUMENT ***