FAILURE OF HARRIS FEEDWATER ISOLATION VALVE DURING REFUELING OUTAGE STARTUP
Licensee/Facility:
CAROLINA POWER & LIGHT CO. Harris 1 RALEIGH, North Carolina Dockets: 05000400 [1] W-3-LP License No: | Notification:
MR Number: 2-2004-0016 Date: 11/07/2004 |
Discussion:
On November 7, 2004, at 4:35 p.m, with the plant at approximately 7% power, preparing for startup from a refueling outage, Shearon Harris manually started the A motor driven auxiliary feedwater (MDAFW) pump in response to unplanned lowering of steam generator (S/G) level in the C S/G. The licensee made event notification #41179 for this valid actuation of a safety system.
The licensee's initial investigation focused on the C main feedwater (MFW) regulating bypass valve and identified a leaking air connection. The bypass valve is designed to fail closed on loss of air. Following repair, power was again increased. The C S/G level failed to control and the power ascension was aborted. Additional trouble shooting was unsuccessful and the reactor was brought to hot shutdown on November 8.
Subsequent investigation determined that the lowering of S/G level resulted from the C MFW isolation valve, a double wedge gate valve, being closed instead of open. Although the valve's position indicated closed in the control room, the valve actually failed to open indicating a possible valve stem separation. The AFW flow path, however, is separate from MFW and was not impacted by the failed valve.
On November 10, the licensee verified that the MFW isolation valve stem had separated from the disc, and brought the plant to cold shutdown. Disassembly and examination of the valve identified internal damage to the valve disc and seat. The licensee plans to investigate the cause of the valve failure, assess past operability, and inspect the two remaining feedwater isolation valves.
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
FREDRICKSON, PAUL E | R2 | (404) 562-4530 | PEF@nrc.gov |
REGION III
Prairie Island Management Change
Licensee/Facility:
NUCLEAR MANAGEMENT CO. Prairie Island 2 WELCH, Minnesota Dockets: 05000306 [2] W-2-LP License No: | Notification:
MR Number: 3-2004-0039 Date: 11/10/2004 Licensee Infrmd. Res. Insp |
Discussion:
Richard Graham, Prairie Island Director of Site Operations, announced today that Mr. Leonard Clewett has accepted the position of Prairie Island Plant Manager. Mr. Clewett most recently held the position of Operations Director at the Three Mile Island Plant. Mr. Clewett will begin his transition the week of November22, 2004, and will assume the Plant Manager's position in January of 2005.
Regional Action: The Resident Inspectors were informed of the change.
Accession Numbers:
Accession No | Accession Date |
ML043150408 | 11/10/2004 |
Contacts:
Name | Office Abbrev | Phone No | E-Mail |
SKOKOWSKI, RICHARD A | R3 | (630) 829-9620 | RAS@nrc.gov |
Page Last Reviewed/Updated Thursday, March 25, 2021