Event Notification Report for February 17, 2022
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
02/16/2022 - 02/17/2022
Agreement State
Event Number: 55736
Rep Org: PA Bureau of Radiation Protection
Licensee: Clarion Boards, LLC
Region: 1
City: Shippenville State: PA
County:
License #: PA-G0084
Agreement: Y
Docket:
NRC Notified By: John Chippo
HQ OPS Officer: Kerby Scales
Notification Date: 02/10/2022
Notification Time: 09:02 [ET]
Event Date: 02/09/2022
Event Time: 00:00 [EST]
Last Update Date: 02/10/2022
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
Person (Organization):
Bickett, Brice (R1)
NMSS_Events_Notification, (EMAIL)
Event Text
EN Revision Imported Date: 2/17/2022
EN Revision Text: AGREEMENT STATE REPORT - STUCK / BROKEN SHUTTER
The following report was report was received from the Pennsylvania Department of Bureau Radiation Protection via email:
"On February 9, 2022, the licensee's radiation safety officer (RSO) was completing shutter checks and leak tests on a Ronan, Model Number: SAI-F37 fixed gauge. Its serial Number is AA-485 and it contains 10 milliCuries of Cesium-137. During the checks the shutter's shear pin broke and he was unable to close the shutter. The vessel that this gauge is on is not entered very often and is not readily accessible. The RSO has notified the manufacturer for a repair. No more information is available at this time."
Pennsylvania Event Report Number: PA220005
Non-Power Reactor
Event Number: 55739
Facility: Ohio State University (OHIO)
RX Type: 500 Kw Pool
Comments:
Region: 0
City: Columbus State: OH
County: Madison
License #: R-75
Agreement: Y
Docket: 05000150
NRC Notified By: Andrew Kauffman
HQ OPS Officer: Bethany Cecere
Notification Date: 02/15/2022
Notification Time: 15:22 [ET]
Event Date: 02/15/2022
Event Time: 08:00 [EST]
Last Update Date: 02/15/2022
Emergency Class: Non Emergency
10 CFR Section:
Non-Power Reactor Event
Person (Organization):
Yin, Xiaosong (NRR PM)
Takacs, Mike (NRR ENC)
Event Text
EN Revision Imported Date: 2/17/2022
EN Revision Text: REPORTABLE OCCURANCE RELATED TO BUILDING EXHAUST FAN
The following information was provided by the licensee via fax or email:
"While performing the pre-start checkout on 2022-02-15 [at approximately 0800 EST], the SRO [Senior Reactor Operator] performing the checkout discovered that the building exhaust fan was not operating. This fan is required to be operating during reactor operations, and it is typically left running all the time. Troubleshooting determined that the cause of the fan loss was power loss from a conduit being cut the previous day when a small area of the cement floor in the janitor closet was being removed for replacement of the janitor closet sink. The concrete work was performed between 1200 and 1453 EST, which was when the contractor signed in and out. The reactor was shut down at 1551 EST, so the reactor was operated for at least an hour without the fan operating.
"There were no safety implications for the reactor, the staff, or the public."
Power Reactor
Event Number: 55741
Facility: Watts Bar
Region: 2 State: TN
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Ryan B. Nessell
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/16/2022
Notification Time: 16:42 [ET]
Event Date: 02/16/2022
Event Time: 11:59 [EST]
Last Update Date: 02/16/2022
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Miller, Mark (R2)
Power Reactor Unit Info
Unit |
SCRAM Code |
RX Crit |
Initial PWR |
Initial RX Mode |
Current PWR |
Current RX Mode |
1 |
N |
Y |
100 |
Power Operation |
100 |
Power Operation |
2 |
N |
Y |
95 |
Power Operation |
95 |
Power Operation |
Event Text
EN Revision Imported Date: 2/17/2022
EN Revision Text: LOSS OF OFFSITE COMMUNICATION CAPABILITY
The following information was provided by the licensee via fax or email:
"At 1159 EST, on 2/16/2022, the Watts Bar Nuclear, Shift Manager was notified that Tennessee Valley Authority (TVA) attempted to notify Tennessee Emergency Management Agency (TEMA) regarding routine siren testing at 0750 EST. TVA was unable to reach TEMA via telephone land line or the Emergency Communication and Notification System (ECNS). TEMA Watch Point staff were located at their back-up facility. TVA subsequently notified TEMA via cell phone that there were communication issues with the primary and backup notification methods. It was determined that the TEMA back-up facility was not able to receive incoming calls. At 0820 EST, TEMA positioned personnel at their primary facility in order to respond to notifications. This restored primary and backup means of notifying the state because the primary facility was not affected by the communication issues.
"This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) as a Major Loss of Offsite Communications Capability because it affected TVA's ability to notify the State of TN.
"The licensee has notified the NRC Resident Inspector."
Power Reactor
Event Number: 55742
Facility: Sequoyah
Region: 2 State: TN
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Tony Langford
HQ OPS Officer: Kerby Scales
Notification Date: 02/16/2022
Notification Time: 17:01 [ET]
Event Date: 02/16/2022
Event Time: 11:28 [EST]
Last Update Date: 02/16/2022
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Miller, Mark (R2)
Power Reactor Unit Info
Unit |
SCRAM Code |
RX Crit |
Initial PWR |
Initial RX Mode |
Current PWR |
Current RX Mode |
1 |
N |
Y |
100 |
Power Operation |
100 |
Power Operation |
2 |
N |
Y |
100 |
Power Operation |
100 |
Power Operation |
Event Text
EN Revision Imported Date: 2/17/2022
EN Revision Text: LOSS OF OFFSITE COMMUNICATION CAPABILITY
The following information was provided by the licensee via fax or email:
"At 1128 EST on 2/16/2022, the SQN [Sequoyah Nuclear] Shift Manager was notified that TVA [Tennessee Valley Authority] attempted to notify Tennessee Emergency Management Agency (TEMA) regarding routine siren testing at 0750. TVA was unable to reach TEMA via telephone land line or the Emergency Communication and Notification System (ECNS). TEMA Watch Point staff were located at their back-up facility. TVA subsequently notified TEMA via cell phone that there were communication issues with the primary and backup notification methods. It was determined that the TEMA back-up facility was not able to receive incoming calls. At 0820, TEMA positioned personnel at their primary facility in order to respond to notifications. This restored primary and backup means of notifying the state because the primary facility was not affected by the communication issues.
"This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) as a Major Loss of Offsite Communications Capability because it affected TVA's ability to notify the State of TN.
"The licensee has notified the NRC Resident Inspector."