U.S. Nuclear Regulatory Commission Operations Center Event Reports For 01/04/2008 - 01/07/2008 ** EVENT NUMBERS ** | Power Reactor | Event Number: 43880 | Facility: DAVIS BESSE Region: 3 State: OH Unit: [1] [ ] [ ] RX Type: [1] B&W-R-LP NRC Notified By: ANTHONY STALLARD HQ OPS Officer: JASON KOZAL | Notification Date: 01/04/2008 Notification Time: 08:05 [ET] Event Date: 01/04/2008 Event Time: 02:50 [EST] Last Update Date: 01/04/2008 | Emergency Class: NON EMERGENCY 10 CFR Section: 50.72(b)(3)(ii)(A) - DEGRADED CONDITION | Person (Organization): PATRICK LOUDEN (R3) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 1 | N | N | 0 | Refueling | 0 | Refueling | Event Text PRESSURE BOUNDARY LEAKAGE DISCOVERED DURING REFUELING "While in Mode 6 with the Reactor Head in place and fuel in the Reactor Vessel, weld overlay was in progress on the common Decay Heat Suction line from the Reactor Coolant System. The Reactor Coolant System is in a drained condition with RCS level approximately 24 inches above the Hot Leg Centerline. During the first weld pass on the suction line weld located in Containment, the welding operator noticed water seeping from the weld. Visual inspection revealed a small leak. The leakage is too small to quantify the leakrate. Surface examinations prior to welding revealed no abnormal conditions or leakage. Welding operations on this weld have been suspended. Planned Refueling activities continue to defuel the reactor vessel. "One train of Decay Heat Removal remains in service providing core cooling. The second train is aligned in standby for Decay Heat Removal. Both Trains of Decay Heat Removal have been declared inoperable due to this leak, however both trains of Decay Heat Removal remain functional." The licensee notified the NRC Resident Inspector. | Power Reactor | Event Number: 43884 | Facility: HATCH Region: 2 State: GA Unit: [ ] [2] [ ] RX Type: [1] GE-4,[2] GE-4 NRC Notified By: TONY SPRING HQ OPS Officer: JEFF ROTTON | Notification Date: 01/06/2008 Notification Time: 15:22 [ET] Event Date: 01/06/2008 Event Time: 11:00 [EST] Last Update Date: 01/06/2008 | Emergency Class: NON EMERGENCY 10 CFR Section: 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION | Person (Organization): STEVEN VIAS (R2) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 2 | N | Y | 100 | Power Operation | 100 | Power Operation | Event Text HPCI DECLARED INOPERABLE DUE TO FAILED SURVEILLANCE TEST "During HPCI pump operability surveillance in preparation for a system outage, the system failed to achieve rated flow and pressure in the time required by procedure and Tech Specs. The procedural requirement is <49 seconds and the Tech Spec requirement is < 50 seconds. The system achieved rated flow and pressure in 54 seconds. The system outage has been delayed until troubleshooting plans can be developed and implemented." The licensee notified the NRC Resident Inspector. | |