Event Notification Report for September 6, 2001

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           09/05/2001 - 09/06/2001

                              ** EVENT NUMBERS **

38192  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   38192       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: TURKEY POINT             REGION:  2  |NOTIFICATION DATE: 08/08/2001|
|    UNIT:  [] [4] []                 STATE:  FL |NOTIFICATION TIME: 22:42[EDT]|
|   RXTYPE: [3] W-3-LP,[4] W-3-LP                |EVENT DATE:        08/08/2001|
+------------------------------------------------+EVENT TIME:        19:00[EDT]|
| NRC NOTIFIED BY:  ROBERT GOODIN                |LAST UPDATE DATE:  09/05/2001|
|  HQ OPS OFFICER:  STEVE SANDIN                 +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          NON EMERGENCY         |CAUDLE JULIAN        R2      |
|10 CFR SECTION:                                 |                             |
|NONR                     OTHER UNSPEC REQMNT    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|                                                   |                          |
|4     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| STARTUP TRANSFORMER (SUT) AND 4A EMERGENCY DIESEL GENERATOR (EDG) BOTH       |
| INOPERABLE                                                                   |
|                                                                              |
| Unit 4 Startup Transformer (SUT) and 4A EDG were both inoperable for 3       |
| hours, 40 minutes on 08/08/01.  This was discovered after the fact at 1900   |
| hours on 08/08/01 while investigating a failure of the 4A EDG ventilation    |
| system.  The 4A EDG was restored to operable status at 1920 hours on         |
| 08/08/01.  The Unit 4 SUT was taken out of service at 0800 0n 08/08/01 for   |
| planned maintenance.  The SUT on Unit 4 was returned to operable status at   |
| 1140 hours on 08/08/01.                                                      |
|                                                                              |
|                                                                              |
| The NRC Resident Inspector was notified of this event by the licensee.       |
|                                                                              |
|                                                                              |
| *  *  *  UPDATE ON 9/5/01 @ 1734 BY MORRIS TO GOULD  *  *  *                 |
| RETRACTION                                                                   |
|                                                                              |
| The licensee is retracting the notification made on August 8, 2001, in which |
| it was reported that the Unit 4 Startup Transformer and the 4A Emergency     |
| Diesel Generator (EDG) were both inoperable (NRC Event Report 38192).  The   |
| licensee has determined that the failure of the 4A EDG ventilation system    |
| did not make the 4A EDG inoperable.  Therefore, there was no time during     |
| which the 4A EDG and the Unit 4 Startup Transformer were simultaneously      |
| inoperable.                                                                  |
|                                                                              |
| The NRC Resident Inspector will be notified.  Notified Reg 2 RDO(Monninger)  |
+------------------------------------------------------------------------------+
