Event Notification Report for September 6, 2001
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
09/05/2001 - 09/06/2001
** EVENT NUMBERS **
38192
!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor |Event Number: 38192 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: TURKEY POINT REGION: 2 |NOTIFICATION DATE: 08/08/2001|
| UNIT: [] [4] [] STATE: FL |NOTIFICATION TIME: 22:42[EDT]|
| RXTYPE: [3] W-3-LP,[4] W-3-LP |EVENT DATE: 08/08/2001|
+------------------------------------------------+EVENT TIME: 19:00[EDT]|
| NRC NOTIFIED BY: ROBERT GOODIN |LAST UPDATE DATE: 09/05/2001|
| HQ OPS OFFICER: STEVE SANDIN +-----------------------------+
+------------------------------------------------+PERSON ORGANIZATION |
|EMERGENCY CLASS: NON EMERGENCY |CAUDLE JULIAN R2 |
|10 CFR SECTION: | |
|NONR OTHER UNSPEC REQMNT | |
| | |
| | |
| | |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE |
+-----+----------+-------+--------+-----------------+--------+-----------------+
| | |
|4 N Y 100 Power Operation |100 Power Operation |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| STARTUP TRANSFORMER (SUT) AND 4A EMERGENCY DIESEL GENERATOR (EDG) BOTH |
| INOPERABLE |
| |
| Unit 4 Startup Transformer (SUT) and 4A EDG were both inoperable for 3 |
| hours, 40 minutes on 08/08/01. This was discovered after the fact at 1900 |
| hours on 08/08/01 while investigating a failure of the 4A EDG ventilation |
| system. The 4A EDG was restored to operable status at 1920 hours on |
| 08/08/01. The Unit 4 SUT was taken out of service at 0800 0n 08/08/01 for |
| planned maintenance. The SUT on Unit 4 was returned to operable status at |
| 1140 hours on 08/08/01. |
| |
| |
| The NRC Resident Inspector was notified of this event by the licensee. |
| |
| |
| * * * UPDATE ON 9/5/01 @ 1734 BY MORRIS TO GOULD * * * |
| RETRACTION |
| |
| The licensee is retracting the notification made on August 8, 2001, in which |
| it was reported that the Unit 4 Startup Transformer and the 4A Emergency |
| Diesel Generator (EDG) were both inoperable (NRC Event Report 38192). The |
| licensee has determined that the failure of the 4A EDG ventilation system |
| did not make the 4A EDG inoperable. Therefore, there was no time during |
| which the 4A EDG and the Unit 4 Startup Transformer were simultaneously |
| inoperable. |
| |
| The NRC Resident Inspector will be notified. Notified Reg 2 RDO(Monninger) |
+------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021