** EVENT NUMBERS **
38088 38122 38123 38124
!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!!
+------------------------------------------------------------------------------+
|Fuel Cycle Facility |Event Number: 38088 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PADUCAH GASEOUS DIFFUSION PLANT |NOTIFICATION DATE: 06/23/2001|
| RXTYPE: URANIUM ENRICHMENT FACILITY |NOTIFICATION TIME: 06:04[EDT]|
| COMMENTS: 2 DEMOCRACY CENTER |EVENT DATE: 06/23/2001|
| 6903 ROCKLEDGE DRIVE |EVENT TIME: 03:50[CDT]|
| BETHESDA, MD 20817 (301)564-3200 |LAST UPDATE DATE: 07/09/2001|
| CITY: PADUCAH REGION: 3 +-----------------------------+
| COUNTY: McCRACKEN STATE: KY |PERSON ORGANIZATION |
|LICENSE#: GDP-1 AGREEMENT: Y |BRUCE JORGENSEN R3 |
| DOCKET: 0707001 |PATRICIA HOLAHAN NMSS |
+------------------------------------------------+ |
| NRC NOTIFIED BY: J. M. UNDERWOOD | |
| HQ OPS OFFICER: JOHN MacKINNON | |
+------------------------------------------------+ |
|EMERGENCY CLASS: NON EMERGENCY | |
|10 CFR SECTION: | |
|OCBA 76.120(c)(2) SAFETY EQUIPMENT FAILUR| |
| | |
| | |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| POWER LOST TO BUILDING BEACON CRITICALITY ACCIDENT ALARM SYSTEM (CAAS). |
| |
| At 0350 hours on 06/23/01, it was discovered that the CAAS beacons for |
| building C-333 were inoperable due to a loss of power. The system is |
| required to be operable according to TSR 2.4.4.2.b for the prescribed modes |
| of operation. Loss of power to the CAAS beacons occurred during the process |
| of returning auxiliary power transformers to service. Power to the beacons |
| was lost for a total of approximately 3 minutes. Normal power was |
| subsequently restored. The building CAAS detectability and horn audibility |
| were not lost due to the power failure. No operations were taking place in |
| building C-333 while the CAAS beacons were inoperable but fissile material |
| is stored in the building. |
| |
| The NRC Resident Inspector has been notified of this event by the |
| certificate holder. |
| |
| * * * RETRACTED AT 1630 EDT ON 7/9/2001 BY J. M. UNDERWOOD TO FANGIE JONES * |
| * * |
| |
| The following is taken from a faxed report: |
| |
| "The PSS's reporting determination was based on the fact that the CAAS |
| lights are mentioned in the CAAS TSR 2.4.4.2b Basis Statement. The Basis |
| includes a paragraph that describes the quarterly surveillance of the CAAS |
| building horns and, in this paragraph, states that the test signal activates |
| the high radiation light and bell in C-300 and activates the building CAAS |
| horns and lights. This is the only mention of CAAS lights in the CAAS TSR. |
| This statement has been interpreted in the past as requiring the CAAS lights |
| to be available and operable and, when inoperable, requiring completion of |
| the TSR 2.4.4.2b LCO actions and reporting to the NRC per 10CFR76.120 |
| (c)(2). |
| |
| "Since the subject event, NRA has reviewed the TSR, SAR. ANSI/ANS8.3, and |
| 10CFR76 and noted the following: |
| [1] CAAS TSR 2.4.4.2b requires the CAAS to be operable (audible) and |
| prescribes the required actions to be taken when the 'area does not have an |
| audible criticality accident alarm'. Audibility is proven by the building |
| CAAS horns which were not affected by the subject power failure. There are |
| no actions required for loss of the building lights. |
| [2] Surveillance requirements 2.4.4.2b-1 and 2.4.4.2b-2 requires quarterly |
| testing of the CAAS horns and verification that the CAAS air accumulator |
| supply pressure to the building horns is adequate to sound the horns for at |
| least 120 seconds. There are no TSR surveillance requirements for the |
| building lights. |
| [3] ANSI/ANS8.3, 'Criticality Accident Alarm System'. Section 4.3 requires |
| audio alarm signals and Section 6.4 requires periodic tests of the signals. |
| ANSI/ANS8.3 does not require or recommend visual alarm signals except in |
| Section 4.3.8, where visual signals are recommended in areas of very high |
| audio background or mandatory hearing protection, neither of which applies |
| to areas outside the buildings with CAAS coverage. |
| [4] PGDP SAR Section 5.2.2.4 states, 'a CAAS is provided to alert personnel |
| if a criticality accident should occur. The system utilizes a distinctive |
| audible signal to notify personnel in the affected area and initiate |
| evacuation...'. There is no mention of the building lights. |
| [5] 10CFR76.89, Criticality Accident Requirements, requires USEC to |
| maintain and operate a criticality monitoring and audible alarm system. |
| There is no mention of building lights, |
| |
| "From the information provided, NRA has concluded that CAAS audibility is |
| provided solely by the CAAS horns and is not affected by the loss of the |
| CAAS lights. Thus, the CAAS building lights are not required to be available |
| and operable by the TSR and CAAS operability is not affected when the lights |
| are not functional. Since the lights are not required to be available and |
| operable by the TSR, the reporting requirement of 10CFR76.120 (c)(2) is not |
| met and reporting is not required. In addition, the TSR LCD actions |
| prescribed by TSR 2.4.4.2b do not apply to the CAAS lights and are not |
| required to be implemented. Based on this information, the subject NRC event |
| notification (PAD.01-023) is being retracted." |
| |
| The licensee notified the NRC Resident Inspector. The R3DO (David Hills) |
| and the NMSS EO (Eric Leeds) have been notified. |
+------------------------------------------------------------------------------+
!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor |Event Number: 38122 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SUMMER REGION: 2 |NOTIFICATION DATE: 07/09/2001|
| UNIT: [1] [] [] STATE: SC |NOTIFICATION TIME: 07:13[EDT]|
| RXTYPE: [1] W-3-LP |EVENT DATE: 07/09/2001|
+------------------------------------------------+EVENT TIME: 06:30[EDT]|
| NRC NOTIFIED BY: FRED LUCAS |LAST UPDATE DATE: 07/09/2001|
| HQ OPS OFFICER: JOHN MacKINNON +-----------------------------+
+------------------------------------------------+PERSON ORGANIZATION |
|EMERGENCY CLASS: NON EMERGENCY |EDWARD MCALPINE R2 |
|10 CFR SECTION: |DAVIDSON, NMSS IAT |
|DDDD 73.71 UNSPECIFIED PARAGRAPH |SKELTON, NRR IAT |
| | |
| | |
| | |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1 N Y 100 Power Operation |100 Power Operation |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| ATTEMPTED INTRODUCTION OF CONTRABAND INTO THE PROTECTED AREA BY A LICENSED |
| OPERATOR. IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY. |
| |
| LICENSEE NOTIFIED THE NRC RESIDENT INSPECTOR. |
| |
| CONTACT THE HEADQUARTERS OPERATIONS OFFICER FOR FURTHER DETAILS. |
| |
| * * * RETRACTED AT 1517 EDT ON 7/9/2001 BY SUSAN REESE TO FANGIE JONES * * |
| * |
| |
| The licensee is retracting this report following further investigation. |
| |
| The licensee notified the NRC Resident Inspector. The R2DO (Edward |
| McAlpine), NRR IAT (Robert Skelton), and NMSS IAT (Aaron Danis) have been |
| notified. |
| |
| Contact the Headquarters Operations Officer for further details. |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
|Power Reactor |Event Number: 38123 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: CLINTON REGION: 3 |NOTIFICATION DATE: 07/09/2001|
| UNIT: [1] [] [] STATE: IL |NOTIFICATION TIME: 13:07[EDT]|
| RXTYPE: [1] GE-6 |EVENT DATE: 07/09/2001|
+------------------------------------------------+EVENT TIME: 09:00[CDT]|
| NRC NOTIFIED BY: JAMIE BARTSCH |LAST UPDATE DATE: 07/09/2001|
| HQ OPS OFFICER: FANGIE JONES +-----------------------------+
+------------------------------------------------+PERSON ORGANIZATION |
|EMERGENCY CLASS: NON EMERGENCY |DAVID HILLS R3 |
|10 CFR SECTION: | |
|AIND 50.72(b)(3)(v)(D) ACCIDENT MITIGATION | |
| | |
| | |
| | |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1 N Y 100 Power Operation |100 Power Operation |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| CONTROL ROOM VENTILATION SYSTEM DECLARED INOPERABLE |
| |
| The Division 2 Main Control Room Ventilation System was declared inoperable |
| at 0900 CDT on 7/9/2001 because it was not maintaining the required positive |
| pressure while running in the High Radiation Mode of operation. The system |
| was declared operable at 0913 CDT when the required positive pressure was |
| restored. During the 13 minute period Division 2 was inoperable, Division 1 |
| Main Control Room Ventilation System was inoperable due to a scheduled |
| maintenance outage. Therefore, with both systems inoperable, a condition |
| existed which could have prevented the fulfillment of the safety function of |
| the Main Control Room Ventilation System needed to mitigate the consequences |
| of an accident. The cause of the perturbation in control room pressure is |
| being investigated. |
| |
| The licensee notified the NRC Resident Inspector. |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
|Power Reactor |Event Number: 38124 |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: OYSTER CREEK REGION: 1 |NOTIFICATION DATE: 07/09/2001|
| UNIT: [1] [] [] STATE: NJ |NOTIFICATION TIME: 14:12[EDT]|
| RXTYPE: [1] GE-2 |EVENT DATE: 07/08/2001|
+------------------------------------------------+EVENT TIME: 14:30[EDT]|
| NRC NOTIFIED BY: MALCOMB BROWN |LAST UPDATE DATE: 07/09/2001|
| HQ OPS OFFICER: FANGIE JONES +-----------------------------+
+------------------------------------------------+PERSON ORGANIZATION |
|EMERGENCY CLASS: NON EMERGENCY |ANTHONY DIMITRIADIS R1 |
|10 CFR SECTION: | |
|APRE 50.72(b)(2)(xi) OFFSITE NOTIFICATION | |
| | |
| | |
| | |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1 N Y 100 Power Operation |100 Power Operation |
| | |
| | |
+------------------------------------------------------------------------------+
EVENT TEXT
+------------------------------------------------------------------------------+
| OFFSITE NOTIFICATION DUE TO SEA TURTLE CAPTURE |
| |
| The licensee notified the National Marine Fisheries Services of the capture |
| of an endangered non-injured juvenile green sea turtle in the intake |
| structure. The turtle has been released to the Marine Mammal Stranding |
| Center. |
| |
| The licensee intends to notify the NRC Resident Inspector. A written report |
| will be sent to the State with copies to the NRC and National Marine |
| Fisheries Services. |
+------------------------------------------------------------------------------+