Event Notification Report for March 12, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           03/11/1999 - 03/12/1999

                              ** EVENT NUMBERS **

35458  35459  35460  35461  

+------------------------------------------------------------------------------+
|Fuel Cycle Facility                              |Event Number:   35458       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: PORTSMOUTH GASEOUS DIFFUSION PLANT   |NOTIFICATION DATE: 03/11/1999|
|   RXTYPE: URANIUM ENRICHMENT FACILITY          |NOTIFICATION TIME: 14:31[EST]|
| COMMENTS: 2 DEMOCRACY CENTER                   |EVENT DATE:        03/11/1999|
|           6903 ROCKLEDGE DRIVE                 |EVENT TIME:        10:30[EST]|
|           BETHESDA, MD 20817    (301)564-3200  |LAST UPDATE DATE:  03/11/1999|
|    CITY:  PIKETON                  REGION:  3  +-----------------------------+
|  COUNTY:  PIKE                      STATE:  OH |PERSON          ORGANIZATION |
|LICENSE#:  GDP-2                 AGREEMENT:  N  |RONALD GARDNER       R3      |
|  DOCKET:  0707002                              |DON COOL, EO         NMSS    |
+------------------------------------------------+                             |
| NRC NOTIFIED BY:  ERIC SPAETH                  |                             |
|  HQ OPS OFFICER:  JOHN MacKINNON               |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|NBNL                     RESPONSE-BULLETIN      |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - NRC BULLETIN 91-01, 4 HOUR  REPORT -                                       |
|                                                                              |
| THE FOLLOWING IS A PORTION OF A FACSIMILE FROM PORTSMOUTH GASEOUS DIFFUSION  |
| PLANT:                                                                       |
|                                                                              |
| ON MARCH 11,1999 AT l030 HOURS, THE NUCLEAR CRITICALITY SAFETY (NCS) STAFF   |
| DETERMINED THAT A NUCLEAR CRITICALITY SAFETY APPROVAL (NCSA) FOR X-705, THAT |
| DEALT WITH DISASSEMBLY OF EQUIPMENT, WAS DEFICIENT.  NCSA-0705_038 WAS       |
| DEFICIENT IN THAT IT FAILED TO IDENTIFY THE CONTROLS NECESSARY TO ENSURE     |
| THAT THE DISASSEMBLY OF EQUIPMENT, PREVIOUSLY CLASSIFIED "UH (UNCOMPLICATED  |
| HANDLING) BASED ON GEOMETRY", DID NOT LEAD TO AN UNSAFE CONFIGURATION FOR    |
| NCS.  BUILDING AND NCS PERSONNEL HAVE ASSESSED THE AREA AND NO UNSAFE        |
| CONDITIONS OR DISASSEMBLY ACTIVITIES WERE FOUND.                             |
|                                                                              |
| THE NCSA DID NOT ADEQUATELY CONSIDER THE EFFECT OF DISASSEMBLY ON EQUIPMENT  |
| CLASSIFIED AS "UH BASED ON GEOMETRY" THAT COULD LEAD TO AN UNSAFE            |
| CONFIGURATION.                                                               |
|                                                                              |
| X-705 BUILDING MANAGEMENT PERSONNEL HAVE DISCONTINUED DISASSEMBLY OPERATIONS |
| OF EQUIPMENT INVOLVING COMPONENTS PREVIOUSLY CLASSIFIED AS "UH BASED ON      |
| GEOMETRY". APPLICABLE NCSAs WILL BE CORRECTED AND IMPLEMENTED.               |
|                                                                              |
| THERE WAS NO LOSS OF HAZARDOUS/RADIOACTIVE MATERIAL OR                       |
| RADIOACTIVE/RADIOLOGICAL CONTAMINATION EXPOSURE AS A RESULT OF THIS EVENT.   |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Other Nuclear Material                           |Event Number:   35459       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| REP ORG:  GAI CONSULTANTS, INC                 |NOTIFICATION DATE: 03/11/1999|
|LICENSEE:  GAI CONSULTANTS, INC                 |NOTIFICATION TIME: 13:43[EST]|
|    CITY:  MONROEVILLE              REGION:  1  |EVENT DATE:        03/11/1999|
|  COUNTY:  ALLEGHENY                 STATE:  PA |EVENT TIME:        07:10[EST]|
|LICENSE#:  37-09180-01           AGREEMENT:  N  |LAST UPDATE DATE:  03/11/1999|
|  DOCKET:                                       |+----------------------------+
|                                                |PERSON          ORGANIZATION |
|                                                |TOM MOSLAK           R1      |
|                                                |DON COOL, EO         NMSS    |
+------------------------------------------------+EDWARD MCALPINE      R2      |
| NRC NOTIFIED BY:  CHUCK FORD, RSO              |                             |
|  HQ OPS OFFICER:  DICK JOLLIFFE                |                             |
+------------------------------------------------+                             |
|EMERGENCY CLASS:          N/A                   |                             |
|10 CFR SECTION:                                 |                             |
|BAB1 20.2201(a)(1)(i)    LOST/STOLEN LNM>1000X  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - TROXLER MOISTURE DENSITY GAUGE STOLEN FROM A LOCKED COMPANY PICKUP TRUCK   |
| -                                                                            |
|                                                                              |
| AT 0710 ON 03/11/99, CHUCK FORD, RADIATION SAFETY OFFICER, GAI CONSULTANTS,  |
| INC, MONROEVILLE, PA, (LICENSE #37-09180-01) WAS NOTIFIED THAT A TROXLER     |
| MOISTURE DENSITY GAUGE HAD BEEN STOLEN FROM THE BACK OF A COMPANY PICKUP     |
| TRUCK WITH A LOCKED CAMPER TOP.  THE TRUCK WAS PARKED IN THE PARKING LOT OF  |
| THE COMFORT INN IN MARTINSBURG, WV.  THE CAMPER TOP LOCK WAS DAMAGED AND THE |
| GAUGE HAD BEEN STOLEN BETWEEN 1900 ON 03/10/99 TO 0630 ON 03/11/99.  THE     |
| UNDAMAGED LOCKED GAUGE (MODEL #3440, SERIAL #29575) CONTAINED SEALED 8       |
| MILLICURIES OF Cs-137 AND 40 MILLICURIES OF Am-241-Be SOURCES.               |
|                                                                              |
| MR. FORD REPORTED THE THEFT TO THE WV STATE POLICE AND NRC REGION 1 (JUDY    |
| JOUSTRA) AND PLANS TO SUBMIT A WRITTEN REPORT TO THE NRC WITHIN 30 DAYS.     |
| THE WV STATE POLICE ISSUED A PRESS RELEASE REGARDING THIS THEFT.             |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35460       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SEABROOK                 REGION:  1  |NOTIFICATION DATE: 03/11/1999|
|    UNIT:  [1] [] []                 STATE:  NH |NOTIFICATION TIME: 16:08[EST]|
|   RXTYPE: [1] W-4-LP                           |EVENT DATE:        03/11/1999|
+------------------------------------------------+EVENT TIME:        14:30[EST]|
| NRC NOTIFIED BY:  DENNIS BEMIS                 |LAST UPDATE DATE:  03/11/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |TOM MOSLAK           R1      |
|10 CFR SECTION:                                 |                             |
|APRE 50.72(b)(2)(vi)     OFFSITE NOTIFICATION   |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - LICENSEE NOTIFIED EPA & NH OF SANITARY WASTE WATER DISCHARGE INTO ATLANTIC |
| OCEAN -                                                                      |
|                                                                              |
| AT 1430 ON 03/11/99, THE LICENSEE NOTIFIED THE ENVIRONMENTAL PROTECTION      |
| AGENCY AND THE NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES THAT       |
| APPROXIMATELY 60 GALLONS OF SANITARY WASTE WATER HAD INADVERTENTLY BEEN      |
| DISCHARGED INTO A PLANT STORM DRAIN WHICH DISCHARGES INTO THE ATLANTIC OCEAN |
| IN VIOLATION OF THEIR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM        |
| PERMIT.                                                                      |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35461       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: SOUTH TEXAS              REGION:  4  |NOTIFICATION DATE: 03/12/1999|
|    UNIT:  [1] [2] []                STATE:  TX |NOTIFICATION TIME: 00:07[EST]|
|   RXTYPE: [1] W-4-LP,[2] W-4-LP                |EVENT DATE:        03/11/1999|
+------------------------------------------------+EVENT TIME:        11:30[CST]|
| NRC NOTIFIED BY:  KLIMPLE                      |LAST UPDATE DATE:  03/12/1999|
|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |GARY SANBORN         R4      |
|10 CFR SECTION:                                 |                             |
|NINF                     INFORMATION ONLY       |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       100      Power Operation  |100      Power Operation  |
|2     N          Y       100      Power Operation  |100      Power Operation  |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| THE PLANT DOES NOT MEET THE DESIGN BASIS REQUIREMENT FOR RHR HEAT EXCHANGER  |
| CONTROL VALVES TO BE SECURED IN A SAFE POSITION.                             |
|                                                                              |
| DURING A REVIEW OF THE OPERATING PROCEDURES FOR THE RESIDUAL HEAT            |
| REMOVAL(RHR) HEAT EXCHANGER SYSTEM, NO STEPS OR LINEUPS WERE FOUND TO        |
| IMPLEMENT THE DESIGN BASIS REQUIREMENT FOR THE RHR HEAT EXCHANGER FLOW AND   |
| BYPASS CONTROL VALVES TO BE SECURED IN THEIR SAFE POSITION.                  |
|                                                                              |
| THE RHR HEAT EXCHANGER FLOW AND BYPASS CONTROL VALVES WERE FOUND TO BE       |
| CONFIGURED WITH THE SOLENOID VENT VALVES IN AN ENERGIZED CONDITION,          |
| THEREFORE POTENTIALLY ALLOWING THE NON-SAFETY RELATED POSITIONER TO CONTROL  |
| THE VALVE.                                                                   |
| FAILURE OF ONE OF THE NON-SAFETY POSITIONERS (DUE TO ADVERSE CONDITIONS)     |
| COULD HAVE DRIVEN THE VALVES TO THEIR NON-SAFETY  POSITION  AT THE ONSET OF  |
| A POSTULATED ACCIDENT, THEREBY PREVENTING THE IMMEDIATE AVAILABILITY OF THE  |
| LOW HEAD SAFETY INJECTION FLOW.                                              |
|                                                                              |
| THIS CONDITION WAS RESOLVED AS SOON AS IT WAS IDENTIFIED BY DE-ENERGIZING    |
| AND REMOVING THE FUSES FOR THE VALVES.                                       |
|                                                                              |
| THE RESIDENT INSPECTOR WAS NOTIFIED.                                         |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021