Event Notification Report for February 5, 1999

                    U.S. Nuclear Regulatory Commission
                              Operations Center

                              Event Reports For
                           02/04/1999 - 02/05/1999

                              ** EVENT NUMBERS **

35287  35343  35344  

!!!!!!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED  !!!!!!!
+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35287       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: FERMI                    REGION:  3  |NOTIFICATION DATE: 01/20/1999|
|    UNIT:  [2] [] []                 STATE:  MI |NOTIFICATION TIME: 18:08[EST]|
|   RXTYPE: [2] GE-4                             |EVENT DATE:        01/20/1999|
+------------------------------------------------+EVENT TIME:        14:13[EST]|
| NRC NOTIFIED BY:  SANJEEV ARAB                 |LAST UPDATE DATE:  02/04/1999|
|  HQ OPS OFFICER:  DOUG WEAVER                  +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |ROGER LANKSBURY      R3      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|NLCO                     TECH SPEC LCO A/S      |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|2     N          Y       96       Power Operation  |96       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| HIGH PRESSURE COOLANT INJECTION (HPCI) INOPERABLE                            |
|                                                                              |
| At 1413 on January 20, 1999, the E4150-F022, "HPCI turbine exhaust drain pot |
| stop/check valve," which drains to the suppression pool, failed to meet      |
| stroke time requirements (28.6 seconds versus <=27 seconds required).        |
|                                                                              |
| The valve was closed and locked per Technical Specifications 3.6.3, Primary  |
| Containment Isolation Valves, at 1600.   With the E4150-F022 valve closed,   |
| it has been determined that the HPCI system is inoperable.  This valve path  |
| provides a drain path for the drain pot during accident conditions.          |
|                                                                              |
| Repair efforts are in progress.                                              |
|                                                                              |
| The licensee informed the NRC resident inspector.                            |
|                                                                              |
| ******************** UPDATE AT 1505 ON 02/04/99 FROM RON SERDA TO TROCINE    |
| ********************                                                         |
|                                                                              |
| The following text is a portion of a facsimile received from the licensee:   |
|                                                                              |
| "On January 20, 1999, the HPCI turbine exhaust two-inch drain containment    |
| isolation valve E4150-F022 stroke tested at 28.6 seconds.  The Inservice     |
| Test (IST) Program acceptance criteria was 27 seconds.  IST requirements for |
| acceptance and possible repairs of the valve were evaluated.                 |
|                                                                              |
| "The valve's stroke acceptance time was evaluated by Engineering Functional  |
| Analysis (EFA) 99-11550.  The EFA concluded that [a] stroke time [of] 30     |
| seconds is acceptable, and therefore, 28.6 seconds is acceptable.  The HPCI  |
| system [limiting condition for operation] was exited on January 21, 1999,    |
| based on the results of the EFA and the subsequent IST Program Evaluation,   |
| 99-003.                                                                      |
|                                                                              |
| "Therefore, [the] event notification of January 20, 1999, is retracted."     |
|                                                                              |
| The licensee notified the NRC resident inspector.  The NRC operations        |
| officer notified the R3DO (Kozak).                                           |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35343       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: WATERFORD                REGION:  4  |NOTIFICATION DATE: 02/04/1999|
|    UNIT:  [3] [] []                 STATE:  LA |NOTIFICATION TIME: 18:00[EST]|
|   RXTYPE: [3] CE                               |EVENT DATE:        02/04/1999|
+------------------------------------------------+EVENT TIME:        16:05[CST]|
| NRC NOTIFIED BY:  GREG SCOTT                   |LAST UPDATE DATE:  02/04/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |THOMAS ANDREWS       R4      |
|10 CFR SECTION:                                 |                             |
|DDDD 73.71               UNSPECIFIED PARAGRAPH  |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|3     N          Y       88       Power Operation  |88       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| PHYSICAL PLANT SECURITY REPORT -                                             |
|                                                                              |
| DISCOVERY OF CONTRABAND INSIDE THE PLANT VITAL AREA.  COMPENSATORY MEASURES  |
| WERE IMMEDIATELY TAKEN UPON DISCOVERY.  THE LICENSEE PLANS TO INFORM THE NRC |
| RESIDENT INSPECTOR.  REFER TO THE HOO LOG FOR ADDITIONAL DETAILS.            |
+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+
|Power Reactor                                    |Event Number:   35344       |
+------------------------------------------------------------------------------+
+------------------------------------------------------------------------------+
| FACILITY: RIVER BEND               REGION:  4  |NOTIFICATION DATE: 02/04/1999|
|    UNIT:  [1] [] []                 STATE:  LA |NOTIFICATION TIME: 18:12[EST]|
|   RXTYPE: [1] GE-6                             |EVENT DATE:        02/04/1999|
+------------------------------------------------+EVENT TIME:        16:32[CST]|
| NRC NOTIFIED BY:  RUSS GODWIN                  |LAST UPDATE DATE:  02/04/1999|
|  HQ OPS OFFICER:  DICK JOLLIFFE                +-----------------------------+
+------------------------------------------------+PERSON          ORGANIZATION |
|EMERGENCY CLASS:          N/A                   |THOMAS ANDREWS       R4      |
|10 CFR SECTION:                                 |                             |
|AIND 50.72(b)(2)(iii)(D) ACCIDENT MITIGATION    |                             |
|                                                |                             |
|                                                |                             |
|                                                |                             |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |
+-----+----------+-------+--------+-----------------+--------+-----------------+
|1     N          Y       94       Power Operation  |94       Power Operation  |
|                                                   |                          |
|                                                   |                          |
+------------------------------------------------------------------------------+
                                   EVENT TEXT                                   
+------------------------------------------------------------------------------+
| - LICENSEE DISCOVERED DUST FILTERS INSTALLED ON CONTAINMENT UNIT COOLERS -   |
|                                                                              |
| DURING A REVIEW OF NRC INFORMATION NOTICE #99-01 WHICH DESCRIBES THE         |
| POTENTIAL FAILURE OF HEPA FILTERS DURING ACCIDENT CONDITIONS, THE LICENSEE   |
| DISCOVERED DUST FILTERS INSTALLED ON CONTAINMENT UNIT COOLERS (#HVR-UCIA &   |
| B) WHICH MAY BE SUBJECT TO DEGRADATION UNDER ACCIDENT CONDITIONS.            |
|                                                                              |
| AT 1632 CST ON 02/04/99, THE LICENSEE CONSERVATIVELY DECLARED THE TWO SAFETY |
| RELATED UNIT COOLERS INOPERABLE SINCE AT THIS TIME REASONABLE ASSURANCE THAT |
| THESE CONTAINMENT UNIT COOLERS WILL PERFORM THEIR SAFETY FUNCTION HAS NOT    |
| BEEN ESTABLISHED.                                                            |
|                                                                              |
| THE LICENSEE IS REPORTING THIS CONDITION AS A CONDITION ALONE THAT COULD     |
| PREVENT THE FULFILLMENT OF A SAFETY FUNCTION.                                |
|                                                                              |
| AT 1714 CST ON 02/04/99, PLANT TECHNICIANS REMOVED THESE DUST FILTERS.  THE  |
| LICENSEE IS COMPLETING AN ENGINEERING ANALYSIS OF THE ABILITY OF THESE       |
| COOLERS TO PERFORM THEIR SAFETY FUNCTION.                                    |
|                                                                              |
| THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.                            |
+------------------------------------------------------------------------------+


Page Last Reviewed/Updated Thursday, March 25, 2021