Date |
Title |
Response |
12/14/2015 |
Report on the Safety Aspects of the Duke Energy Carolinas, LLC, Combined License Application for William States Lee III Nuclear Station, Units 1 And 2 |
01/22/16 |
11/17/2015 |
ACRS Assessment of the Quality of Selected NRC Research Projects |
12/03/15 |
11/17/2015 |
The Revised Fuel Cycle Oversight Process Cornerstones |
12/13/15 |
11/16/2015 |
Plans for Resolving the NRC Near-Term Task Force Open Fukushima Tier 2 and 3 Recommendations |
12/16/15 |
11/13/2015 |
Draft SECY Paper, "Recommendations on Issues Related to Implementation of a Risk Management Regulatory Framework" |
12/28/15 |
11/12/2015 |
Report on the Safety Aspects of the License Renewal Application for Davis-Besse Nuclear Power Station |
12/01/15 |
11/09/2015 |
Draft Regulatory Guide |
No Response Required |
10/20/2015 |
Interim Staff Guidance, "Guidance for the Evaluation of Acute Chemical Exposures and Proposed Quantitative Standards" |
11/24/15 |
10/16/2015 |
Reactor Oversight Process Enhancements |
11/25/15 |
10/15/2015 |
Report On The Safety Aspects Of The Construction Permit Application For Shine Medical Technologies, Inc. Medical Isotope Production Facility |
11/25/15 |
10/13/2015 |
Draft Regulatory Guide |
No Response Required |
10/09/2015 |
Documentation of Receipt of Applicable Official NRC Notices to the Advisory Committee On Reactor Safeguards for October, 2015 |
No Response Required |
09/23/2015 |
Interim Staff Guidance: DC/COL-ISG-028, "Assessing the Technical Adequacy of the Advanced Light-Water Reactor Probabilistic Risk Assessment for the Design Certification Application and Combined License Application" |
11/19/15 |
09/22/2015 |
Draft Regulatory Basis for Containment Protection and Release Reduction for Mark I and Mark II Boiling Water Reactors |
10/29/15 |
09/21/2015 |
Report on the Safety Aspects of the License Renewal Application for Byron Station Units 1 and 2 and Braidwood Station Units 1 and 2 |
10/23/15 |
09/15/2015 |
Draft Regulatory Guide |
No Response Required |
07/21/2015 |
Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request |
09/04/15 |
07/13/2015 |
Draft Regulatory Guide |
No Response Required |
07/13/2015 |
Withdrawal of Regulatory Guide |
No Response Required |
06/25/2015 |
PSEG Early Site Permit |
07/17/15 |
06/24/2015 |
Grand Gulf Nuclear Station Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request |
07/29/15 |
06/15/2015 |
Draft Final Regulatory Guides |
No Response Required |
06/15/2015 |
Draft Regulatory Guide |
No Response Required |
06/15/2015 |
Regulatory Information Summary |
No Response Required |
05/11/2015 |
Draft Final Regulatory Guide |
No Response Required |
05/11/2015 |
Interim Staff Guidance |
No Response Required |
04/30/2015 |
Interim Staff Guidance JLD-ISG-2015-01, "Compliance with Phase 2 of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions" |
05/22/15 |
04/22/2015 |
Draft SECY Paper, "Proposed Rulemaking: Mitigation of Beyond-Design-Basis Events (RIN 3150-AJ49)" |
05/15/15 |
04/21/2015 |
Draft Final Regulatory Guides |
No Response Required |
04/21/2015 |
Interim Staff Guidance |
No Response Required |
04/21/2015 |
Withdrawal of Regulatory Guide 1.1 |
No Response Required |
04/20/2015 |
Topical Report NEDC-33766P, "GEH Simplified Stability Solution (GS3)" |
04/22/15 |
03/13/2015 |
Report on the Safety Aspects of the License Renewal Application of the Sequoyah Nuclear Plant Units 1 and 2 |
04/06/15 |
03/11/2015 |
Review of Draft SECY Paper, "Cumulative Effects of Regulation Process Enhancements and Risk Prioritization Initiative: Response to Commission Direction and Recommendations |
04/09/15 |
03/11/2015 |
Draft Regulatory Guides |
No Response Required |
03/11/2015 |
Interim Staff Guidance |
No Response Required |
02/26/2015 |
Proposed Revision for 10 CFR 50.55a to Incorporate by Reference IEEE Standard 603-2009, "IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations" |
04/14/15 |
02/20/2015 |
Draft Final Generic Letter 20XX-XX, "Treatment of Natural Phenomena Hazards at Fuel Cycle Facilities" |
03/27/15 |
02/19/2015 |
Report On the Safety Aspects of the Nuclear Innovation North America, LLC Combined License Application for South Texas Project Nuclear Station, Units 3 and 4 |
04/02/15 |
02/12/2015 |
Draft Regulatory Guides dated February 12, 2015 |
No Response Required |
02/12/2015 |
Proposed Revision to Branch Technical Position |
No Response Required |
02/12/2015 |
Final ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application |
03/19/15 |