Date Title EDO
Response
12/20/2010 Long-Term Cooling for the Westinghouse AP1000 Pressurized Water Reactor 01/26/2011
12/15/2010 ACRS Review of Updates to 10 CFR 50.55a, "Codes and Standards" 01/21/2011
12/15/2010 Safety Culture Statement 01/21/2011
12/13/2010 Report on the Final Safety Evaluation Report Associated with the Amendment to the AP1000 Design Control Document 02/05/2010
12/08/2010 Draft Final Regulatory Guides 3.12, 3.71, 4.16, and 5.80 No Response Required
11/17/2010 Draft Final Revisions to Generic License Renewal Guidance Documents 12/21/2010
11/16/2010 Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance (NUREG-1927) 12/17/2010
11/15/2010 ACRS Assessment of the Quality of Selected NRC Research Projects – FY2010 01/25/2011
11/09/2010 Response to the October 7, 2010, EDO Letter Regarding Closure of Design Acceptance Criteria for New Reactors 12/10/2010
11/09/2010 Withdrawl of Regulatory Guides 1.39, 1.81, and 1.154  
10/26/2010 Report on the Safety Aspects of the License Renewal Application for the Duane Arnold Energy Center 11/26/2010
10/26/2010 Report on the Safety Aspects of the License Renewal Application for the Cooper Nuclear Station 11/23/2010
10/20/2010 Report on the Safety Aspects of the General Electric-Hitachi Nuclear Energy (GEH) Application for Certification of the Economic Simplified Boiling Water Reactor (ESBWR) Design 11/22/2010
10/20/2010 Draft Final Digital Instrumentation and Control Interim Staff Guidance-06: Licensing Process 12/07/2010
10/20/2010 Draft Final Rule for Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements (10 CFR 50.46a) 11/19/2010
10/14/2010 Draft Final Regulatory Guide 8.18 No Response Required
10/14/2010 Proposed Regulatory Guides DG-7007 and DG-1250 No Response Required
09/27/2010 License Application for the Mixed Oxide Fuel Fabrication Facility and the Associated Safety Evaluation Report 10/26/2010
09/22/2010 Long-Term Core Cooling for the Economic and Simplified Boiling Water Reactor (ESBWR) 10/18/2010
09/20/2010 Report on the Safety Aspects of the South Texas Project Nuclear Operating Company Application to Amend the Certified U.S. ABWR Design to Incorporate the Aircraft Impact Assessment Rule  
09/17/2010 Comments on SECY-10-0113, "Closure Options for Generic Safety Issue-191, Assessment of Debris Accumulation in Pressurized Water Reactor Sump Performance" 10/25/2010
09/10/2010 Draft Final Interim Staff Guidance (ISG-23) No Response Required
09/10/2010 Draft Final Revision to 10 CFR 50.55a, "Codes and Standards No Response Required
09/10/2010 Proposed Revisions to Regulatory Guide 7.4 No Response Required
09/10/2010 Proposed Revisions to Regulatory Guides 8.39 and 8.23 No Response Required
08/09/2010 Closure of Design Acceptance Criteria for New Reactors 10/07/2010
08/09/2010 Interim Letter: Safety Evaluation Report with Open Items Related to the South Texas Project Combined License Application Referencing the Certified Advanced Boiling Water Reactor Design 09/10/2010
07/29/2010 Draft Final Regulatory Guide 3.74, "Guidance for Fuel Cycle Facility Change Processes" 08/25/2010
07/27/2010 Risk-Informed Regulatory Guidance for New Reactors 08/25/2010
07/21/2010 Withdrawl of Regulatory Guides 3.44 and 3.49 No Response Required
07/21/2010 Draft Final Regulatory Guides 3.13, 8.35, and 8.4 No Response Required
07/21/2010 Proposed Revisions to Regulatory Guides 1.149, 1.179, and 3.71 No Response Required
06/24/2010 Draft Final Regulatory Guide 1.216, "Containment Structural Integrity Evaluation for Internal Pressure Loadings Above Design-Basis Pressure" 07/23/2010
06/16/2010 Response to the April 16, 2010, EDO Letter Regarding Draft Final NUREG-1520, Revision 1, "Standard Review Plan for Review of a License Application for a Fuel Cycle Facility" 07/23/2010
06/14/2010 Proposed Regulatory Guides 1.93 and 7.7 No Response Required
06/14/2010 Draft Final Regulatory Guide 2.5 No Response Required
05/19/2010 Draft Guidance on Crediting Containment Accident Pressure in Meeting the Net Positive Suction Head Required to Demonstrate that Safety Systems can Mitigate Accidents as Designed 06/10/2010
05/17/2010 Revised Standard Review Plan for Spent Fuel Dry Storage Systems (NUREG-1536) 06/15/2010
05/12/2010 Proposed Standard Review Plan, Branch Technical Position 7-19 No Response Required
05/12/2010 Final Interim Staff Guidance ISG-25 No Response Required
05/12/2010 Proposed Revisions to Regulatory Guides 3.67 and 7.3 No Response Required
05/12/2010 Comments Regarding Licensed Operator Training Standards  
04/27/2010 Licensing Topical Report, NEDC-33173P, Supplement 3, "Applicability of GE Methods to Expanded Operating Domains - Supplement for GNF2 Fuel  
04/21/2010 Chapters 2, 4, 5, 8, 10, 12, and 17 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Reactor Design Certification Application 05/27/2010
04/15/2010 Proposed Regulatory Guides 1.127, 3.13, 8.2, and DG-1240, and DG-1247 No Response Required
04/15/2010 Proposed Interim Staff Guidance DC/COL-014 and DC/COL-ISG-021 No Response Required
04/15/2010 Final Interim Staff Guidance DC/COL-ISG-017 and DC/COL-20 No Response Required
04/15/2010 Draft Final Regulatory Guides 1.147, 1.68.2, 1.84, 1.193, 6.9 and 8.40 No Response Required
04/07/2010 Review and Evaluation of the Nuclear Regulatory Commission Safety Research Program 05/25/2010
03/29/2010 Draft Final Revision 1 of Regulatory Guide 1.62, "Manual Initiation of Protective Actions" 05/14/2010
03/25/2010 Draft Revision 2, Regulatory Guide 4.11 (DG-4016), "Terrestrial Environmental Studies for Nuclear Power Plants" Not Available
03/25/2010 Draft Final Revision 1 to Digital Instrumentation and Control Interim Staff Guidance - 07: "Digital Instrumentation & Control Systems in Safety Applications at Fuel Facilities" 05/18/2010
03/25/2010 Draft Final Revision 1 of Regulatory Guide 1.141, "Containment Isolation Provisions For Fluid Systems" 04/30/2010
03/18/2010 Status of Staff Rulemaking Efforts for Depleted Uranium and Other Unique Waste Streams 04/20/2010
03/11/2010 Draft Final Regulatory Guides 1.11, 1.126, 1.128, 1.65 and 3.39 No Response Required
03/11/2010 Proposed Revision 2 to Regulatory Guide 1.54 No Response Required
03/11/2010 Proposed Revision to Regulatory Guide 1.152, 2.6, 4.20, 8.10, 8.19, 8.4, and DG-1216 No Response Required
03/11/2010 Withdrawal of Regulatory Guide 8.6 No Response Required
03/11/2010 Final Interim Staff Guidance ESP/DC/COL-ISG-015, "Post-Combined License Commitments" No Response Required
02/22/2010 Draft Final NUREG-1520 Revision 1, "Standard Review Plan for Review of a License Application for a Fuel Cycle Facility" 04/16/2010
02/17/2010 ACRS Review of Amendments to Previously Certified Reactor Designs