12/23/2005 |
Early Site Permit Application for the Grand Gulf Site and the Associated Final Safety Evaluation Report |
12/21/2005 |
Draft Final Generic Letter 2005-XX, "Impact of Potentially Degraded HEMYC/MT Fire Barrier Materials on Compliance with Approved Fire Protection Programs" |
12/16/2005 |
Draft Regulatory Guide DG-1120, "Transient and Accident Analysis Methods," and Standard Review Plan Chapter 15 Section 15.0.2, "Review of Transient and Accident Methods" |
12/16/2005 |
Proposed Revision to Regulatory Guide 1.76, "Design Basis Tornado and Tornado Missiles for Nuclear Power Plants," and Standard Review Plan, Sections 2.3.1, "Regional Climatology," and 3.5.1.4, "Missiles Generated by Tornado and Extreme Winds" |
12/16/2005 |
Proposed Revision to Standard Review Plan Section 17.5, "Quality Assurance Program Description Design Certification, Early Site Permit and New License Applicants" |
11/21/2005 |
Draft NRC Digital System Research Plan for FY 2005 - FY 2009 |
11/18/2005 |
Draft Final Generic Letter 2005-XX, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power" |
11/18/2005 |
Staff Recommendation to Withdraw the Proposed Rule on Post-Fire Operator Manual Actions |
11/18/2005 |
Report on the Safety Aspects of the License Renewal Application for the Point Beach Nuclear Plant Units 1 and 2 |
11/15/2005 |
Final Rule - AP1000 Design Certification |
11/09/2005 |
Draft Final Generic Letter 2005-XX, "Steam Generator Tube Integrity and Associated Technical Specifications" |
11/09/2005 |
Standard Review Plan Section 14.2.1, "Generic Guidelines for Extended Power Uprate Testing Programs" |
11/08/2005 |
Proposed Revision to Standard Review Plan Section 12.5, "Operational Radiation Protection Program" |
11/04/2005 |
ACRS Assessment o f the Quality of Selected NRC Research Projects - FY 2005 |
10/19/2005 |
Interim Report on the Safety Aspects of the License Renewal Application for the Browns Ferry Nuclear Plant Units 1, 2, and 3 |
10/18/2005 |
Proposed Recommendation for Resolving Generic Safety Issue 80, "Pipe Break Effects on Control Rod Drive Hydraulic Lines in the Drywells of BWR Mark I and II Containments" |
10/13/2005 |
Draft Regulatory Guide Dg-1120 (DG-1120), "Transient and Accident Analysis Methods," and Standard Review Plan Chapter 15 Section 15.0.2 (SRP 15.0.2), "Review of Transient and Accident Methods" |
10/11/2005 |
Proposed Rule on Safety/Security Interface |
09/23/2005 |
Proposed Draft Regulatory Guide DG-8028, "Control of Access to High and Very High Radiation Areas in Nuclear Power Plants" |
09/23/2005 |
Report on a Proposed Technical Basis for Revision of the Embrittlement Criteria in 10 CFR 50.46 |
09/22/2005 |
Proposed Revision to Standard Review Plan Section 6.2.1.3 "Mass and Energy Release Analysis for Postulated Loss-of-Coolant Accidents" |
09/22/2005 |
Interim Letter: Exelon Generation Company, LLC, Application for Early Site Permit and the Associated NRC Staff's Draft Safety Evaluation Report |
09/22/2005 |
Draft Final Revisions to Generic License Renewal Guidance Documents |
09/22/2005 |
Report on the Safety Aspects of the License Renewal Applications for the Millstone Power Station, Units 2 and 3 |
09/21/2005 |
Report on Two Policy Issues Related to New Plant Licensing |
09/20/2005 |
ACRS Review of the North Anna Early Site Permit Application - Final Safety Evaluation Report Changed Pages Prior to Publishing as a NUREG |
09/20/2005 |
Proposed Rule: Licenses, Certifications, and Approvals For Nuclear Power Plants, 10 CFR Part 52 and Conforming Amendments to Parts 1, 2, 10, 19, 20, 21, 25, 26, 50, 51, 54, 55, 72, 73, 95, 140, 170, and 171 |
09/20/2005 |
Proposed Revision 4 to Regulatory Guide 1.82, "Water Sources for Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident" |
09/14/2005 |
Draft Final Regulatory Guide 3.71, "Nuclear Criticality Safety Standards for Fuels and Materials Facilities" |
07/25/2005 |
Draft Final Amendment to 10 CFR 50.55a "Codes and Standards" |
07/25/2005 |
Proposed Generic Letter 2005-XX, "Post-Fire Safeshutdown Circuit Analysis Spurious Actuations" |
07/18/2005 |
Draft Final Regulatory Guide DG-1137, "Guidelines for Lightning Protection of Nuclear Power Plants" |
07/18/2005 |
Dominion Nuclear North Anna, LLC, Early Site Permit Application and the Associated NRC Final Safety Evaluation Report |
07/18/2005 |
Report on the Safety Aspects of the License Renewal Application for the Donald C. Cook Nuclear Plant, Units 1 and 2 |
07/15/2005 |
Proposed Revision 2 to Regulatory Guide 1.152, "Criteria for Use of Computers in Safety Systems of Nuclear Power Plants" |
07/15/2005 |
Assessment of the Quality of the NRC Research Projects |
07/08/2005 |
Proposed Regulatory Guide (DG)-1128, "Criteria for Accident Monitoring Instrumentation for Nuclear Power Plants" (Revision 4 of Regulatory Guide 1.97) |
07/07/2005 |
Proposed Generic Letter 2005-XX, "Impact of Potentially Degraded Hemyc/MT Fire Barrier Materials on Compliance with Approved Fire Protection Programs" |
07/07/2005 |
Proposed Generic Letter 2005-XX, "Inaccessible or Underground Cable Failures That Disable Accident Mitigation Systems" |
07/07/2005 |
Proposed Revision to Standard Review Plan Section 6.5.2, "Containment SPRAy as a Fission Product Cleanup System" |
07/07/2005 |
Proposed Rulemaking to Amend 10 CFR Parts 19 and 20: Collection, Reporting, and Labeling Requirements, and Clarification of Dose Determination Methodology |
06/14/2005 |
Draft Final Regulatory Guide, "Risk-Informed, Performancebased Fire Protection for Existing Light-Water Nuclear Power Plants" |
06/14/2005 |
Interim Letter: Draft Safety Evaluation Report on Grand Gulf Early Site Permit Application |
06/10/2005 |
Draft Final NUREG/CR-6850, "EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities" |
06/10/2005 |
Draft Commission Paper on "Risk-Informed Alternatives to the Single Failure Criterion" |
06/09/2005 |
Interim Report on the Safety Aspects of the License Renewal Application for the Point Beach Nuclear Plant, Units 1 and 2 |
06/07/2005 |
Draft Final Regulatory Guides on ASME Code Cases |
06/03/2005 |
Proposed Bulletin Entitled "Emergency Preparedness and Response Actions for Security-Based Events" |
05/13/2005 |
Guidance for Assessing Exemption Requests from Nuclear Power Plant Licensed Operator Staffing Requirements |
05/13/2005 |
Report on the Safety Aspects of the License Renewal Application for Arkansas Nuclear One, Unit 2 |
05/06/2005 |
Draft Regulatory Guide DG-8029 (Proposed Revision 2 of Regulatory Guide 8.7), "Instructions for Recording and Reporting Occupational Radiation Dose Data" |
04/14/2005 |
Report on the Safety Aspects of the License Renewal Application for the Joseph M. Farley Nuclear Plant, Units 1 and 2 |
04/08/2005 |
Draft NUREG, "Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications" |
04/08/2005 |
Proposed Revision to Regulatory Guide 3.71, "Nuclear Criticality Safety Standards for Fuels and Materials Facilities" |
04/08/2005 |
Proposed Revision to Management Directive 6.4, "Generic Issues Program" |
03/14/2005 |
Proposed Rulemaking to Modify 10 CFR 50.46, "Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements" |
03/11/2005 |
Pressurized Thermal Shock (PTS) Reevaluation Project: Technical Basis for Revision of the PTS Screening Criterion in the PTS Rule |
03/11/2005 |
Interim Letter: Draft Safety Evaluation Report on North Anna Early Site Permit Application |
03/11/2005 |
Revised Draft NUREG Report "Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process" |
03/08/2005 |
Proposed Generic Letter 2005-XX, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power" |
02/24/2005 |
Waterford Steam Electric Station, Unit 3 - Extended Power Uprate |
02/24/2005 |
Review of the Final Safety Evaluation Report for the Mixed Oxide Fuel Fabrication Facility Construction Authorization Request |
02/11/2005 |
Draft Regulatory Guide, DG-1137, "Guidelines for Lightning Protection for Nuclear Power Plants" |