Advisory Committee on Reactor Safeguards (ACRS) 1999 Letter Reports

Date Title
12/18/1999 NUREG-1624, Revision 1, "Technical Basis and Implementation Guidelines for a Technique for Human Event Analysis (Atheana)", 12/15/99
12/10/1999 Proposed Resolution of Generic Safety Issue-190, 12/10/99
12/10/1999 Report on the Safety Aspects of the License Renewal Application for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, 12/10/99
12/08/1999 Draft Commission Paper Regarding the 120-month Update Requirement for Inservice Inspection and Inservice Testing Programs, 12/8/99
12/07/1999 Proposed Final Amendment to 10 CFR 50.47, 12/7/99
11/12/1999 Implementing a Framework for Risk-informed Regulation in the Office of Nuclear Material Sagety and Safeguards
11/12/1999 Draft Regulatory Guide DG-1093, "Guidance and Examples for Identifying 10 Cfr 50.2 Design Bases
11/12/1999 Proposed Resoution of Generic Safety Issue (GSI)-148, "Smoke Control and Manual Fire-fighting Effectiveness
11/12/1999 Spent Fuel Fires Associated with Decommissioning
11/12/1999 Proposed Revision 3 to Regulatory Guide .160 (DG-1082), "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants"
11/12/1999 Proposed Final Design Cerification Rule and Changes to the Design Control Document Associated with AP600 Design
10/12/1999 Proposed Plans for Developing Risk-Informed Revisions to 10 CFR Part 50, "Domestic Lisensing of Production and Utilization Facilities"
10/08/1999 Proposed Resoultion of Generic Safety Issue B-55, "Imporved Reliability of Target Rock Safety Relief Valves"
10/08/1999 Proposed Resolution of Generic Safety Issue 23 (GSI-23), "Reactor Coolant Pump Seal Failure"
10/08/1999 Combustion Engineering Owners Goups (CEOG) Application to Eliminate the Post-accident Sampling System from the Plant Design Bases for Ceog Utilities
10/08/1999 Draft Commission Paper Regarding Proposed Guidelines for Applying Rick-informed Desicionmaking in License Amendment Reviews
10/05/1999 Proposed Final Revision 3 to Regulatory Guide 1.8, "Qualification and Training of Personnel for Nuclear Power Plants"
09/17/1999 Proposed Final Rule on Use of Alternative Source Term at Operating Reactors, Draft Regulatory Guide, and Standard Review Plan
09/17/1999 Modifications Proposed by the Westinghouse Owners Group to the Core Damage Assessment Guidelines and Post Accident Sampling System (Pass) Requirements
09/17/1999 Proposed Resolution of Generic Safety Issue-145, "Actions to Reduce Commons Cause Failures"
09/16/1999 Proposed Revision 1 to Regulatory Guide 1.78 (DG-1087), Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release
09/15/1999 Safety Evaluation Report Related to Electric Power Research Institute Risk-informed Methods to Inservice Inspection of Piping (Epri TR-112657, Revision B, July 1999)
09/14/1999 Proposed Final Revision 1 to Regulatory Guide 8.15, "Acceptable Programs for Respiratory Protection"
09/13/1999 Proposed Final NRC Generic Letter 88-18, Supplement 1, "Guidance on Managing Quality Assurance Records in Electronic Media"
09/13/1999 Proposed Final Revision 3 to Regulatory Guide 1.105, "Setpoints for Safety-related Instrumentation"
09/13/1999 Interim Letter Related to the License Renewal of Oconee Nuclear Station
09/10/1999 Proposed Final Revision 4 to Regulatory Guide 1.101 (DG - 1075), "Emergency Planning and Preparedness for Nuclear Power Reactors"
07/23/1999 Proposed Final Amendment to 10 CFR 50.55a, "Codes and Standards"
07/22/1999 Latest Draft of the Differing Professional Opinion Consideration Document
07/22/1999 Revision of Appendix K, "ECCS Evaluation Models," to 10 CFR Part 50
07/21/1999 Draft Regulatory Guide DG-1086, "Criterion for Triggering a Review under 50.80 for Non-owner Operator Service Companies"
07/21/1999 Proposed Revision of Nureg-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants - - LWR Edition," Chapter 13, "Conduct of Operations"
07/21/1999 Roposed Revision 3 to Regulatory Guide 1.160 (Dg-1082), "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants"
07/21/1999 Proposed Revision 3 to Regulatory Guide 1.160 (DG-1082), "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants"
07/19/1999 SECY-99-148, "Credit for Existing Programs for License Renewal"
06/11/1999 Proposed Options for Using Averted Onsite Costs and Voluntary Initiatives in Regulatory Analyses
06/11/1999 Development of a Low-power and Shutdown Risk Assessment Program
06/9/1999 Exemption Request to the Hydrogen Control Requirements for the San Onofre Nuclear Generating Station, Units 2 and 3
06/09/1999 Proposed Resolution of Generic Safety Issue-165, Spring-actuated Safety and Relief Valve Reliability
06/09/1999 Proposed Final Rule Amending the Fitness-for-Duty Rule
06/03/1999 Draft Guide DG-1075, "Emergency Planning and Preparedness for Nuclear Power Reactors"
05/19/1999 Modifications Proposed by the Westinghouse Owners Group to the Core Damage Assessment Guidelines and Post Accident Sampling System Requirements
05/19/1999 Interim Letter on the Safety Aspects of the Baltimore Gas and Electric Company's License Renewal Application for Calvert Cliffs Nuclear Power Plant, Units 1 and 2
05/19/1999 The Role of Defense in Depth in a Risk-Informed Regulatory System
05/17/1999 Proposed Final Rule - Revisions to 10 CFR Parts 50 and 72 Concerning Changes, Tests, and Experiments
05/17/1999 Use of Mixed Oxide Fuel in Commercial Nuclear Power Plants
05/14/1999 Proposed Resolution of Generic Safety Issue-158, "Performance of Safety-related Power-operated Valves Under Design Basis Conditions"
05/11/1999 Modified Proposed Final Revision to 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants"
04/23/1999 Proposed Revisions to the NRC Generic Communications Process
04/22/1999 Status of Resolution of Steam Generator Tube Integrity Issues
04/20/1999 Status of Efforts on Revising the Commission's Safety Goal Policy Statement
04/19/1999 Reevaluation of Generic Safety Issue Process
04/19/1999 SECY-99-017, "Proposed Amendment to 10 CFR 50.55a"
04/15/1999 Proposed Rule on AP600 Design Certification
04/14/1999 Final Rule: "Respiratory Protection and Controls to Restrict Internal Exposures, 10 CFR Part 20"
04/14/1999 Proposed Final Revision to 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants"
03/25/1999 Proposed ASME Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications (Phase 1)
03/24/1999 High Burnup Fuel Phenomena Identification and Ranking
03/24/1999 Application of Westinghouse Best-Estimate Loss-of-Coolant Accident Analysis Methodology to Upper Plenum Injection Plants
03/24/1999 Guidance Memorandum for Implementation of the Revised Enforcement Policy
03/23/1999 Safety Evaluation Regarding Combustible Gas Control in Containment at Indian Point Unit 2
03/23/1999 Proposed Amendment to 10 CFR 50.72, Immediate Notification and 50.73, Licensee Event Reporting System
03/22/1999 Degraded Switchyard Voltage Issues at Palo Verde Nuclear Generating Station Units 1, 2, and 3
03/22/1999 Lessons Learned from the ACRS Review of the AP600 Design
03/22/1999 Core Research Capabilities
03/22/1999 SECY-99-054, "Plans for Final Rule - Revisions to 10 CFR Parts 50, 52, and 72: Requirements Concerning Changes, Tests, and Experiments"
02/23/1999 Proposed Improvements to the NRC Inspection and Assessment Programs
02/19/1999 SECY-98-244, "NRC Human Performance Plan"
02/19/1999 Resolution of Generic Safety Issue B-61, "Allowable ECCS Equipment Outage Periods"
02/18/1999 NFPA 805, "Performance-based Standard for Fire Protection for Light Water Reactor Electric Generating Plants"
02/18/1999 List of Questions to Be Addressed for Possible Resolution of Key Issues Associated with the Proposed Revision to 10 CFR 50.59 (Changes, Tests and Experiments)
02/11/1999 Draft Regulatory Guide DG-1080, "Nuclear Power Plant Simulation Facilities for Use in Operator Training and License Examinations"
02/11/1999 Draft Regulatory Guide DG-1076, "Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants"

Page Last Reviewed/Updated Friday, March 13, 2020