Advisory Committee on Reactor Safeguards Fire Protection Subcommittee Meeting, September 11, 2002

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
FIRE PROTECTION SUBCOMMITTEE MEETING
SEPTEMBER 11, 2002
ROCKVILLE, MARYLAND

-PROPOSED SCHEDULE-

Topics Presenters Time
I. Opening Remarks S. Rosen, ACRS 8:30-8:35 a.m.
II. RES Staff Introduction Mark Cunningham 8:35-8:45 a.m.
III. Fire Risk Research Plan, FY 2001-2002 Nathan Siu/J.S. Hyslop 8:45-9:45 a.m.
BREAK 9:45-10:00 a.m.
IV. a. Fire Risk Re-quantification and Fire PRA Guide Upgrade Report
b. Risk Methods Insights Gained from Fire Incidents (NUREG-6738)
J.S. Hyslop/Steve Nowlen (SNL) 10:00-11:00 a.m.
V. Fire Detection and Suppression Analysis: An Assessment and Update of PRA Methods and Data Steve Nowlen (SNL) 11:00-12:00 noon
LUNCH 12:00-1:00 p.m.
VII. Circuit Analysis - Failure Mode and Likelihood Analysis Steve Nowlen (SNL) 1:00-2:30 p.m.
BREAK 2:30-2:45 p.m.
VIII. Improvements in the Significance Determination Process for Fire Protection Mark Reinhart/See-Meng Wong, NRR 2:45-3:45 p.m.
IX. Plant Fire Protection Inspections Doug Coe, NRR 3:45-4:45 p.m.

NOTE:

  • Presentation time should not exceed 50 percent of the total time allocated for specific item. The remaining 50 percent of the time is reserved for discussion.
  • ยท 25 copies of the presentation materials to be provided to the Subcommittee

Page Last Reviewed/Updated Tuesday, October 03, 2017