Home > NRC Library > ADAMS Public Documents
Diablo Canyon Power Plant, Units 1 and 2 - Submittal of Revision 27 to Updated Final Safety Analysis Report
Accession Number: ML23241A052
Date Released: Friday, October 20, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23241A776 - Diablo Canyon Power Plant, Units 1 and 2 - Submittal of Revision 27 to Updated Final Safety Analysis Report (5/25/2023)
- ML23241A681 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (5/25/2023)
- ML23241A599 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (489 page(s), 5/25/2023)
- ML23241A586 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (5/25/2023)
- ML23241A271 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 4, Reactor (264 page(s), 5/25/2023)
- ML23241A546 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System (5/25/2023)
- ML23241A149 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (5/25/2023)
- ML23241A496 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (265 page(s), 5/25/2023)
- ML23241A089 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (5/25/2023)
- ML23241A400 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (5/25/2023)
- ML23241A340 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (101 page(s), 5/25/2023)
- ML23241A659 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (5/25/2023)
- ML23241A107 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (5/25/2023)
- ML23241A633 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (5/25/2023)
- ML23241A124 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation (41 page(s), 5/25/2023)
- ML23241A338 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (5/25/2023)
- ML23241A486 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications And Equipment Control Guidelines (5/25/2023)
- ML23241A697 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (5/25/2023)
- ML23241A758 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, Drawing 500001, Rev. 1, Piping and Mechanical Area Locaiton Plan (5/25/2023)
- ML23241A730 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-7, Drawing 468999-1, Layout, Details, Notes (5/25/2023)
- ML23241A779 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-8, Drawing 469001, Rev. 3, Restored Cross Sections & Embedment Plan Breakwaters - Restoration & Improvements (5/25/2023)
- ML23241A729 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102001, Rev. 19, Sheet 3, Piping Schematic Legend (5/25/2023)
- ML23241A746 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102023, Rev. 57, Sheet 2 (5/25/2023)
- ML23241A733 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108001-3, Sheet 3 of 3 (5/25/2023)
- ML23241A767 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108023, Rev 36, Sheet 2 (5/25/2023)
- ML23241A374 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-10, Drawing 102010, 52, Sheet 3, Residual Heat Removal System (5/25/2023)
- ML23241A664 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-10, Drawing 102010, Rev. 32, Sheet 4 (5/25/2023)
- ML23241A217 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-10, Drawing 102010-5, Rev. 29, Sheet 5, Residual Heat Removal Pump (5/25/2023)
- ML23241A123 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-10, Drawing # 108010-3, Revision 31, Residual Heat Removal System, Sheet 3 (5/25/2023)
- ML23241A385 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-10, Drawing 108010-4, Rev. 16 (5/25/2023)
- ML23241A092 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-10, Drawing 108010-5, Rev. 18, Residual Heat Removal System (5/25/2023)
- ML23241A631 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 102011, Rev. 65, Sheet 2, Nuclear Seam Supply Sampling System (5/25/2023)
- ML23241A533 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 102011, Rev. 2, Sheet -2A, Nuclear Steam Supply Sampling System (5/25/2023)
- ML23241A286 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 102011, Rev. 57, Sheet 3 (5/25/2023)
- ML23241A554 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 102011, Rev. 28, Sheet 4 (5/25/2023)
- ML23241A064 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 102011, Revision 59, Nuclear Steam Supply Sampling System, Sheet 5 (5/25/2023)
- ML23241A066 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 102011, Rev. 58, Sheet 6 (5/25/2023)
- ML23241A589 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 108011, Rev. 49, Sheet 2, Nuclear Steam Supply Sampling System (5/25/2023)
- ML23241A137 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-11, Drawing 108011, Revision 41, Spent Fuel System (SFS) Pool Recirculation Samples, Sheet 3 (5/25/2023)
- ML23241A344 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-11, Drawing 108011, Revision 1, This Sheet is left Blank Intentionally, Sheet 4 (5/25/2023)
- ML23241A259 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 108011, Revision 45, Nuclear Steam Supply Sampling System, Sheet 5 (5/25/2023)
- ML23241A274 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-11, Drawing 108011, Rev. 43, Sheet 6 (5/25/2023)
- ML23241A561 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-12, Drawing 102012, Rev. 38, Sheet 3, Containment Spray System (5/25/2023)
- ML23241A241 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-12, Drawing 108012, Rev. 28, Sheet 3, Containment Spray System (5/25/2023)
- ML23241A193 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 102013, Rev. 45, Sheet 2, Spent Fuel Pit Cooling System (5/25/2023)
- ML23241A412 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 102013, Sheet 2A, Rev. 2, Spent Fuel Pit Pump 1-2 Oil Levelizer (5/25/2023)
- ML23241A254 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 108013, Sheet 2, Rev. 37, Spent Fuel Pit Cooling System (5/25/2023)
- ML23241A310 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-14, Drawing 102014, Rev. 63, Sheet 10, Component Cooling Water System (5/25/2023)
- ML23241A368 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-14, Drawing 102014, Revision 59, Sheet 5, Component Cooling Water System (5/25/2023)
- ML23241A522 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-14, Drawing 102014, Revision 45, Sheet 5A, Component Cooling Water Pumps Cooling Requirements (5/25/2023)
- ML23241A380 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-14, Drawing 102014, Rev. 6, Sheet 5B, Component Cooling Water System (5/25/2023)
- ML23241A117 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-14, Drawing 102014, Rev. 56, Sheet 6, Component Cooling Water System (5/25/2023)
- ML23241A178 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 102014-6A, Revision 37, Sheet 6A, Component Cooling Water System (5/25/2023)
- ML23241A447 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 102014-7, Component Cooling Water System (5/25/2023)
- ML23241A295 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 102014-8, Rev. 55, Sheet 8, Component Cooling Water System (5/25/2023)
- ML23241A356 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-14, Drawing 102014, Sheet 9, Rev. 61, Component Cooling water System (5/25/2023)
- ML23241A245 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-10, Rev. 42, Sheet 10, Component Cooling Water System (5/25/2023)
- ML23241A367 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-5, Rev. 49, Sheet 5, Component Cooling Water System (5/25/2023)
- ML23241A350 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-5A, Revision 35, Sheet 5A, Component Cooling Water Pumps Cooling Requirements (5/25/2023)
- ML23241A167 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-6, Revision 44, Sheet 6, Component Cooling Water System (5/25/2023)
- ML23241A569 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-6A, Rev. 30, Sheet 6A, Component Cooling Water System (5/25/2023)
- ML23241A343 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-7, Rev. 36, Sheet 7, Cooling Component Water System (5/25/2023)
- ML23241A326 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-8, Rev. 41, Sheet 8, Component Cooling Water System (5/25/2023)
- ML23241A097 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-14, Drawing 108014-9, Revision 46, Sheet 9 (5/25/2023)
- ML23241A294 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-1, Revision 100, Sheet 1, Piping Schematic Make-up Water System (5/25/2023)
- ML23241A300 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-10, Sheet 10, Make-Up Water System (5/25/2023)
- ML23241A672 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-11, Rev. 99, Sheet 11, Make-Up Water System (5/25/2023)
- ML23241A104 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-13, Rev. 84, Sheet 13, Make-Up Water System (5/25/2023)
- ML23241A551 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-14, Rev. 81, Sheet 14, Make-Up Water System (5/25/2023)
- ML23241A669 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-16, Revision 97, Sheet 16, Make-Up Water System (5/25/2023)
- ML23241A411 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-18, Rev. 87, Sheet 18, Make-Up Water System (5/25/2023)
- ML23241A081 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-20, Rev. 81, Sheet 20, Make-Up Water System (5/25/2023)
- ML23241A091 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-21, Rev. 111, Sheet 21, Make-Up Water System (5/25/2023)
- ML23241A207 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-21a, Rev. 13, 21A, Make-Up Water System (5/25/2023)
- ML23241A389 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-4, Rev. 96, Sheet 4, Make-Up Water System (5/25/2023)
- ML23241A514 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-6, Revision 100, Sheet 6, Make-Up Water System (5/25/2023)
- ML23241A450 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-7, Revision 110, Sheet 7, Make-Up Water System (5/25/2023)
- ML23241A235 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-8, Revision 110, Sheet 8, Make-Up Water System (5/25/2023)
- ML23241A070 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-16, Drawing 102016-9, Rev. 99, Sheet 9, Make-Up Water System (5/25/2023)
- ML23241A524 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-16, Drawing 102016, Rev. 77, Sheet 9A, Makeup Water System (5/25/2023)
- ML23241A384 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-16, Drawing 108016, Rev. 49, Sheet 1, Piping Schematic Makeup Water System (5/25/2023)
- ML23241A369 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-16, Drawing 108016, Rev. 51, Sheet 17, Makeup Water System (5/25/2023)
- ML23241A661 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-16, Drawing 108016, Rev. 10, Sheet 19, Makeup Water System (5/25/2023)
- ML23241A553 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-16, Drawing 108016, Rev. 51, Sheet 3 (5/25/2023)
- ML23241A248 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-16, Drawing 108016, Rev. 37, Sheet 5 (5/25/2023)
- ML23241A145 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Sheet 3 (5/25/2023)
- ML23241A323 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Rev. 103, Sheet 3A, Saltwater Systems (5/25/2023)
- ML23241A416 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Rev. 96, Sheet 3B, Saltwater System (5/25/2023)
- ML23241A179 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Rev. 96, Sheet 4, Saltwater Systems (5/25/2023)
- ML23241A386 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Rev. 101, Sheet 5, Saltwater Systems (5/25/2023)
- ML23241A176 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Rev. 3, Sheet 5A, Saltwater System (5/25/2023)
- ML23241A138 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Rev. 107, Sheet 6, Saltwater System (5/25/2023)
- ML23241A656 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-17, Drawing 102017-6A, Revision 96, Sheet 6A, Saltwater Systems (5/25/2023)
- ML23241A702 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 102017, Revision 1, Sheet 6B, Saltwater Systems (5/25/2023)
- ML23241A229 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017-3, Rev. 80, Sheet 3, Saltwater Systems (5/25/2023)
- ML23241A063 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 84, Sheet 3A (5/25/2023)
- ML23241A279 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 84, Sheet 3B, Saltwater System (5/25/2023)
- ML23241A457 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 70, Sheet 4, Saltwater Systems (5/25/2023)
- ML23241A199 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 53, Sheet 5 (5/25/2023)
- ML23241A511 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 99, Sheet 6, Saltwater System (5/25/2023)
- ML23241A240 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 68, Sheet 6A, Saltwater System (5/25/2023)
- ML23241A223 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-17, Drawing 108017, Rev. 9, Sheet 6B, Saltwater System (5/25/2023)
- ML23241A560 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-17, Drawing 108017-6c, Revision 1, Sheet 6C, Saltwater Systems (5/25/2023)
- ML23241A290 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 82, Sheet 1 of 23, Piping Schematic Fire Protection Systems (5/25/2023)
- ML23241A228 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-19, Rev. 3, Sheet 19, Fire Protection Systems (5/25/2023)
- ML23241A130 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-20, Rev. 2, Sheet 20, Fire Protection Systems (5/25/2023)
- ML23241A687 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Revision 91, Sheet 2A, Fire Protection Systems (5/25/2023)
- ML23241A275 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 85, Sheet 2B, Fire Protection Systems (5/25/2023)
- ML23241A660 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-3, Rev. 89, Sheet 3, Fire Protection Systems (5/25/2023)
- ML23241A186 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-4, Rev. 78, Sheet 4, Fire Protection Systems (5/25/2023)
- ML23241A079 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-4a, Rev. 50, Sheet 4A, Fire Protection Systems (5/25/2023)
- ML23241A634 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 83, Sheet 5, Fire Protection Systems (5/25/2023)
- ML23241A232 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 79, Sheet 5A (5/25/2023)
- ML23241A196 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-6, Rev. 74, Sheet 6, Fire Protection Systems (5/25/2023)
- ML23241A103 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 72, Sheet 6A (5/25/2023)
- ML23241A278 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 64, Sheet 7, Fire Protection Systems (5/25/2023)
- ML23241A504 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018, Rev. 38, Sheet 8 (5/25/2023)
- ML23241A327 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 102018-9, Rev. 80, Sheet 9 (5/25/2023)
- ML23241A409 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Sheet 2, Rev. 45, Yard Loop (5/25/2023)
- ML23241A361 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Sheet 3, Rev. 20, Fuel Handling BLDG. (5/25/2023)
- ML23241A214 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Sheet 3A, Firewater Pumps (5/25/2023)
- ML23241A566 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Rev. 40, Sheet 4 (5/25/2023)
- ML23241A108 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Rev. 32, Sheet 4A, Fire Protection Systems (5/25/2023)
- ML23241A354 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018-5, Rev. 29, Sheet 5, Fire Protection Systems (5/25/2023)
- ML23241A382 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Rev. 30, Sheet 5A, Fire Protection Systems (5/25/2023)
- ML23241A516 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Revision 37, Sheet 6, Carbon Dioxide Fire Protection System Hazard Spray Heads (5/25/2023)
- ML23241A113 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-18, Drawing 108018-6a, Revision 35, Sheet 6A, Carbon Dioxide Fire Protection System Hose Reels (5/25/2023)
- ML23241A559 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Sheet 7, Rev. 40, Containment Structure (5/25/2023)
- ML23241A383 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Revision 20, Sheet 8 (5/25/2023)
- ML23241A188 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-18, Drawing 108018, Revision 20, Sheet 9, Intake Structure Firewater Protection System (5/25/2023)
- ML23241A057 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 90, Sheet 3, Liquid Radwaste System (5/25/2023)
- ML23241A613 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 72, Sheet 3A (5/25/2023)
- ML23241A122 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 37, Sheet 3B (5/25/2023)
- ML23241A109 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019-4, Rev. 83, Sheet 4, Liquid Radwaste System (5/25/2023)
- ML23241A162 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019-5, Rev. 83, Sheet 5, Liquid Radwaste System (5/25/2023)
- ML23241A426 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 77, Sheet 5A, Liquid Radwaste System (5/25/2023)
- ML23241A293 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 81, Sheet 5B, Liquid Radwaste System (5/25/2023)
- ML23241A125 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019-5c, Rev. 83, Sheet 5C, Liquid Radwaste System (5/25/2023)
- ML23241A690 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 85, Sheet 6, Liquid Radwaste System (5/25/2023)
- ML23241A351 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. Rev. 82, Sheet 6A, Liquid Radwaste System (5/25/2023)
- ML23241A069 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019-6b, Rev. 85, Sheet 6B, Liquid Radwaste System (5/25/2023)
- ML23241A557 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Rev. 81, Sheet 7, Liquid Radwaste System (5/25/2023)
- ML23241A280 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019-8, Rev. 82 (5/25/2023)
- ML23241A692 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 102019, Sheet 8A, Rev. 83, Liquid Radwaste System (5/25/2023)
- ML23241A219 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-19, Drawing 108019, Sheet 3, Rev. 48, Liquid Radwaste System (5/25/2023)
- ML23241A121 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 3A, Rev. 31, Liquid Radwaste System (5/25/2023)
- ML23241A704 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 3B, Residual Heat Removal Sumps & Pumps (5/25/2023)
- ML23241A161 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019-4, Rev. 27, Sheet 4, Liquid Radwaste System (5/25/2023)
- ML23241A417 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-19, Drawing 108019-5, Rev. 23 (5/25/2023)
- ML23241A449 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019-5a, Rev. 18, Sheet 5A (5/25/2023)
- ML23241A543 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019-5b, Rev. 18 (5/25/2023)
- ML23241A332 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6, Rev. 18 (5/25/2023)
- ML23241A494 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019-6a, Rev. 18, Sheet 6A (5/25/2023)
- ML23241A518 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6B, Rev. 18, Liquid Radwaste Media Filters And Radwaste ION Exchangers (5/25/2023)
- ML23241A198 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019-7, Rev. 18, Sheet 7 (5/25/2023)
- ML23241A654 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019-8, Rev. 30 (5/25/2023)
- ML23241A667 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002-10, Rev. 103, Sheet 10 (5/25/2023)
- ML23241A438 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-2, Drawing 102002-11, Rev. 105, Sheet 11 (5/25/2023)
- ML23241A766 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Revision 111, Sheet 4, Condensate System (5/25/2023)
- ML23241A775 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 5, Rev. 112, Condensate System (5/25/2023)
- ML23241A074 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002-5A, Rev. 111, Sheet 5A (5/25/2023)
- ML23241A206 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 6, Rev. 105 (5/25/2023)
- ML23241A153 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, 6A, Rev. 113, Condensate System (5/25/2023)
- ML23241A265 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 7, Rev. 111, Condensate System (5/25/2023)
- ML23241A258 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 8, Revision 105, Feedwater Heaters (5/25/2023)
- ML23241A542 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-2, Drawing 102002-8A, Revision 105, Sheet 8A, Condensate System (5/25/2023)
- ML23241A372 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 9, Rev. 132, Condensate System (5/25/2023)
- ML23241A651 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Revision 103, ETA Transfer Pumps, Sheet 9-A (5/25/2023)
- ML23241A157 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-2, Drawing 102002-9B, Rev. 4, Sheet 9B (5/25/2023)
- ML23241A603 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-2, Drawing 108002-10, Rev. 48, Sheet 10 (5/25/2023)
- ML23241A366 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 66, Condensate System, Sheet 11 (5/25/2023)
- ML23241A387 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 90, Condensate System, Sheet 5 (5/25/2023)
- ML23241A415 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 89, Condensate System, Sheet 6 (5/25/2023)
- ML23241A297 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 74, Condensate System, Sheet 7 (5/25/2023)
- ML23241A238 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-2, Drawing 108002-8, Rev. 81, Sheet 8, Condensate System (5/25/2023)
- ML23241A528 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 69, Boric Acid Injection Sub-System, Sheet 8A (5/25/2023)
- ML23241A204 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Sheet 9, Rev. 94, Condensate System (5/25/2023)
- ML23241A270 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 4, Sheet 9A, Condensate System (5/25/2023)
- ML23241A399 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 108002, Revision 77, Condensate System, Sheet 4 (5/25/2023)
- ML23241A111 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 54, Lube Oil Distributio and Purification Systems, Sheet 10 (5/25/2023)
- ML23241A491 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Sheet 11, Rev. 1 (5/25/2023)
- ML23241A601 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 66, Lube Oil Distribution and Purification Systems, Sheet 3 (5/25/2023)
- ML23241A304 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 58, Lube Oil Distribution and Purification Systems, Sheet 3a (5/25/2023)
- ML23241A615 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Sheet 3b, Rev. 32, High Velocity Lube Oil Flushing System (5/25/2023)
- ML23241A658 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 47, Lube Oil Distribution and Purification Systems, Sheet 4 (5/25/2023)
- ML23241A622 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 58, Lube Oil Distribution and Purifiation Systems, Sheet 5 (5/25/2023)
- ML23241A666 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Sheet 6, Rev. 56 (5/25/2023)
- ML23241A391 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 47, MFWPT Supervisory Instrumentaion, Sheet 6a (5/25/2023)
- ML23241A289 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Sheet 6B, Rev. 2, Lube Oil Distribution And Purification Systems (5/25/2023)
- ML23241A703 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 54, Sheet 7, Lube Oil Distribution and Purification Systems (5/25/2023)
- ML23241A576 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020, Revision 55, Lube Oil Distribution and Purification Systems, Sheet 8 (5/25/2023)
- ML23241A414 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 102020-9, Rev. 57, Sheet 9, Lube Oil Distribution and Purification (5/25/2023)
- ML23241A156 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Revision 42, Lube Oil Distribution and Purification Systems, Sheet 10 (5/25/2023)
- ML23241A570 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 11, Rev. 10 (5/25/2023)
- ML23241A684 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 3, Rev. 58, Lube Oil Distribution And Purification Systems (5/25/2023)
- ML23241A062 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Revision 43, High Pressure & Low Pressure Turbines, Sheet 3a (5/25/2023)
- ML23241A325 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 3B, Rev. 28, High Velocity Lube Oil Flushing System (5/25/2023)
- ML23241A072 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 4, Rev. 41, Lube Oil Distribution And Purification Systems (5/25/2023)
- ML23241A529 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Revision 47, Lube Oil Distribution and Purification Systems, Sheet 5 (5/25/2023)
- ML23241A357 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 6, Rev. 52, F.W. Pump Turbine Control Oil System (5/25/2023)
- ML23241A525 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 6A, Rev. 38, FWPT Supervisory Instrumentation (5/25/2023)
- ML23241A307 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 6B, Rev. 2, Lube Oil Distribution And Purification Systems (5/25/2023)
- ML23241A185 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 7, Rev. 47, Lube Oil Distribution And Purification Systems (5/25/2023)
- ML23241A549 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 8, Rev. 44, Lube Oil Distribution And Purification Systems (5/25/2023)
- ML23241A508 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-20, Drawing 108020, Sheet 9, Rev. 38, Lube Oil Distribution And Purification (5/25/2023)
- ML23241A312 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Sheet 2, Rev. 67, Diesel Engine-Generator Associated Systems (5/25/2023)
- ML23241A652 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Sheet 3, Rev. 62, Diesel Engine-Generator Associated Systems (5/25/2023)
- ML23241A365 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 59, Sheet 3A, Diesel Engine - Generator Associated System (5/25/2023)
- ML23241A396 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-21, Drawing 102021-4, Revision 62, Sheet 4, Diesel-Engine Generator Associated System (5/25/2023)
- ML23241A376 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 58, Sheet 4A (5/25/2023)
- ML23241A139 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 58, Sheet 5 (5/25/2023)
- ML23241A707 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 62, Sheet 6, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A595 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 43, Sheet 6A, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A694 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 73, Sheet 7, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A501 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 73, Sheet 7A, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A617 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Revision 70, Sheet 7B, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A439 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 65, Sheet 8, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A346 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 102021, Rev. 57, Sheet 9 (5/25/2023)
- ML23241A498 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-21, Drawing 108021-2, Rev. 40, Sheet 2, Diesel Oil Fuel System (5/25/2023)
- ML23241A096 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-21, Drawing 108021-3, Rev. 42, Sheet 3, Diesel Engine Generator Associated Systems (5/25/2023)
- ML23241A614 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 3A, Rev. 44, Diesel Engine Generator associated Systems (5/25/2023)
- ML23241A662 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 42, Sheet 3B, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A435 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 45, Sheet 4, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A639 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021-4A, Rev. 43, Sheet 4A, Diesel Engine Generator Associated System (5/25/2023)
- ML23241A160 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 42, Sheet 4B, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A596 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-21, Drawing 108021-5, Rev. 44, Sheet 5, Combustion Air and Exhaust System 2-1 (5/25/2023)
- ML23241A336 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5A, Rev. 44, Combustion Air And Exhaust System 2-2 (5/25/2023)
- ML23241A552 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5B, Rev. 39, Combustion Air And Exhaust System 2-3 (5/25/2023)
- ML23241A222 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 6, Rev. 49, Engine Fuel Oil System 2-1 (5/25/2023)
- ML23241A236 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 6A, Rev. 48, Engine Fuel Oil System 2-2 (5/25/2023)
- ML23241A335 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 6B, Rev. 43, Diesel Engine-Generator Associated Systems (5/25/2023)
- ML23241A315 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 51, Sheet 7, Diesel Engine Generator System (5/25/2023)
- ML23241A539 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 51, Sheet 7A, Diesel Engine - Generatorr Associated System (5/25/2023)
- ML23241A535 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 7B, Rev. 52, Diesel Engine Generator Lube Oil System (5/25/2023)
- ML23241A068 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-21, Drawing 108021-8, Rev. 45, Sheet 8, Diesel Engine Generator Associated System (5/25/2023)
- ML23241A249 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 8A, Rev. 45, Diesel Engine-Generator Associated Systems (5/25/2023)
- ML23241A394 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 45, Sheet 8B, Diesel Engine - Generator Associated Systems (5/25/2023)
- ML23241A334 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 9, Rev. 39, Misc. Instruments For Engine Generator 2-1 (5/25/2023)
- ML23241A686 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Rev. 39, Sheet 9A (5/25/2023)
- ML23241A237 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-21, Drawing 108021-9b, Revision 39, Sheet 9B, Miscellaneous Instruments for Engine Operator 2-3 (5/25/2023)
- ML23241A497 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-22, Drawing 102022, Revision 51, Sheet 2 (5/25/2023)
- ML23241A620 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-22, Drawing 102022, Revision 45, Sheet 3 (5/25/2023)
- ML23241A556 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-22, Drawing 102022, Sheet 4, Rev. 56, Turbine And Generator Associated Systems (5/25/2023)
- ML23241A523 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 102022-5, Revision 62, Sheet 5, Turbine and Generator Associated Systems (5/25/2023)
- ML23241A230 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 102022-5a, Revision 3, Sheet 5A, Turbine and Generator Associated Systems (5/25/2023)
- ML23241A623 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-22, Drawing 102022, Revision 52, Sheet 6, Turbine And Generator Associated Systems (5/25/2023)
- ML23241A309 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 102022, Revision 38, Sheet 6A, Hydrogen Gas Dryer (5/25/2023)
- ML23241A459 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 102022-7, Revision 10, Sheet 7, Exciter Coolers Air Temperature Detectors (5/25/2023)
- ML23241A224 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 108022-2, Revision 38, Sheet 2 (5/25/2023)
- ML23241A252 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-22, Drawing 108022, Revision 36, Sheet 3, Turbine And Generator Associated Systems (5/25/2023)
- ML23241A273 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-22, Drawing 108022, Revision 40, Sheet 4, Turbine And Generator Associated Systems (5/25/2023)
- ML23241A298 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 108022-5, Revision 46, Sheet 5, Turbine and Generator Associated Systems (5/25/2023)
- ML23241A600 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 108025a, Revision 1, Sheet 5A, Turbine and Generator Associated Systems (5/25/2023)
- ML23241A475 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 108022-6, Revision 37, Sheet 6, Turbine And Generator Associated Systems (5/25/2023)
- ML23241A418 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 108022-6a, Rev. 26, 6A (5/25/2023)
- ML23241A255 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-22, Drawing 108022-7, Revision 1, Sheet 7 (5/25/2023)
- ML23241A401 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-23, Drawing 102023-10, Rev. 102, Sheet 10, Ventilation and Air Conditioning Systems (5/25/2023)
- ML23241A642 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-23, Drawing 102023-13, Revision 108, Sheet 13, Ventilation and Air Conditioning Systems (5/25/2023)
- ML23241A330 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Sheet 13A, Rev. 1 (5/25/2023)
- ML23241A172 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-23, Drawing 102023-14, Revision 91, Sheet 4, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A359 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Sheet 15, Auxiliary Building Access control area (5/25/2023)
- ML23241A625 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 48, Sheet 17A, (5/25/2023)
- ML23241A663 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 50, Sheet 17B, Common (Unit 1 & 2) (5/25/2023)
- ML23241A056 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 68, Sheet 18A (5/25/2023)
- ML23241A264 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 70, Sheet 18B (5/25/2023)
- ML23241A146 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 100, Sheet 18C, Ventilation & Conditioning Systems (5/25/2023)
- ML23241A180 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 100, Sheet 18D, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A671 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 70, Sheet 18E (5/25/2023)
- ML23241A612 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 70, Sheet 18F, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A629 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 110, Sheet 19, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A379 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 100, Sheet 20 (5/25/2023)
- ML23241A065 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 112, Sheet 3, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A133 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 99, Sheet 4, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A061 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 84, Sheet 5, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A227 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 53, Sheet 6A, Outage Access Control Facility Heating & Ventilation (Elevation Looking East (Area GW) (5/25/2023)
- ML23241A598 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 1, Sheet 6B (5/25/2023)
- ML23241A269 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 91, Sheet 7, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A584 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 102023, Rev. 110, Sheet 9A, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A303 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-10, Rev. 67, Sheet 10, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A650 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-23, Drawing 108023, Revision 75, Sheet 13, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A506 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-14, Rev. 59, Sheet 4, Component Cooling Water System (5/25/2023)
- ML23241A105 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Sheet 15, Rev. 21, Auxiliary Building Access Control Area (5/25/2023)
- ML23241A436 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Rev. 19, Sheet 16 (5/25/2023)
- ML23241A174 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-17, Rev. 19, Sheet 17 (5/25/2023)
- ML23241A183 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Rev. 48, Sheet 18A, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A579 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Rev. 47, Sheet 18B, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A646 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Rev. 45, Sheet 18C (5/25/2023)
- ML23241A544 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-19, Rev. 17, Sheet 19 (5/25/2023)
- ML23241A455 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-20, Rev. 69, Sheet 20 (5/25/2023)
- ML23241A419 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-3, Rev. 83, Sheet 3, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A313 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023-4, Rev. 88, Sheet 4, Ventilation & Air Conditioning Systems (5/25/2023)
- ML23241A205 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Rev. 89, Sheet 5, Ventilation & Air Conditioning System (5/25/2023)
- ML23241A373 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Rev. 42, Sheet 6A, Outage Access Control Facility Heating & Ventilation (Elevation Looking East) (5/25/2023)
- ML23241A461 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-23, Drawing 108023, Sheet 7, Rev. 59, Post LOCA Sampling System HVAC (5/25/2023)
- ML23241A333 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-24, Drawing 102024, Sheet 3, Rev. 32, Gaseous Radwaste System (5/25/2023)
- ML23241A080 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-24, Drawing 108024, Revision 25, Sheet 3, Gaseous Radwaste System (5/25/2023)
- ML23241A143 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 102025, Sheet 3, Rev. 72, Compressed Air Systems (5/25/2023)
- ML23241A134 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-25, Drawing 102025-3a, Rev.. 61, Sheet 3A, Compressed Air Systems (5/25/2023)
- ML23241A410 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-25, Drawing 102025-3b, Rev. 52, Sheet 3B (5/25/2023)
- ML23241A339 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 102025, Sheet 4, Rev. 71, Compressed Air Systems (5/25/2023)
- ML23241A215 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 102025, Revision 31, Sheet 4A (5/25/2023)
- ML23241A169 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-25, Drawing 102025-5, Rev. 59, Sheet 5, Compressed Air Systems (5/25/2023)
- ML23241A608 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 102025, Sheet 6, Rev. 47, Service Air Unit 1 (5/25/2023)
- ML23241A170 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 102025, Revision 59, Sheet 8, Condensate Polishing Equip Service & Inst. Air Supply (5/25/2023)
- ML23241A618 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-25, Drawing 108025, Rev. 14, Sheet 3 (5/25/2023)
- ML23241A201 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 108025, Sheet 4, Rev. 37, Compressed Air Systems (5/25/2023)
- ML23241A395 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-25, Drawing 108025-5, Rev. 35, Sheet 5, Compressed Air Systems (5/25/2023)
- ML23241A572 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-25, Drawing 108025, Rev. 25, Sheet 6 (5/25/2023)
- ML23241A624 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-25, Drawing 108025, Sheet 8, Rev. 34, Condensate Polishing Equip Service & Instr. Air Supply (5/25/2023)
- ML23241A171 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-26, Drawing 102026-3, Rev. 54, Sheet 3, Nitrogen and Hydrogen Systems (5/25/2023)
- ML23241A141 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-26, Drawing 102026, Sheet 3A, Rev. 39, Nitrogen And Hydrogen Systems (5/25/2023)
- ML23241A256 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-26, Drawing 102026-4, Rev. 49, Sheet 4, Nitrogen and Hydrogen System (5/25/2023)
- ML23241A318 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-26, Drawing 108026-3, Rev. 28, Sheet 3, Nitrogen and Hydrogen Systems (5/25/2023)
- ML23241A442 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-26, Drawing 108026, Sheet 4, Rev. 25, Nitrogen And Hydrogen Systems (5/25/2023)
- ML23241A488 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-27, Drawing 102027, Sheet 3, Rev. 56, Oily Water Separotor And Turbine BLDG. Sump System (5/25/2023)
- ML23241A155 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-27, Drawing 108027, Sheet 3, Rev. 13, Oily Water Separator And Turbine BLDG. Sump System (5/25/2023)
- ML23241A564 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3, Drawing 102003, Rev. 87, Sheet 3, Feedwater System (5/25/2023)
- ML23241A471 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3, Drawing 102003, Rev. 70, Sheet 3A, Feedwater System (5/25/2023)
- ML23241A110 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-3, Drawing 102003, Sheet 4, Rev. 86, Feedwater System (5/25/2023)
- ML23241A377 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-3, Drawing 102003, Sheet 4A, Rev. 61, Feedwater System (5/25/2023)
- ML23241A348 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-3, Drawing 102003, Sheet 5, Rev. 64, Feedwater Pumps Shaft Seal System (5/25/2023)
- ML23241A210 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3, Drawing 102003-6, Rev. 28, Sheet 6 (5/25/2023)
- ML23241A685 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-3, Drawing 108003, Sheet 3, Rev. 84, Feedwater System (5/25/2023)
- ML23241A587 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3 Figure 3.2-3, Drawing 108003, Sheet 4, Rev. 70, Feedwater System (5/25/2023)
- ML23241A456 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3, Drawing 108003, Revision 46, Sheet 4A, Feedwater System (5/25/2023)
- ML23241A641 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3, Drawing 108003, Sheet 5, Rev. 50 (5/25/2023)
- ML23241A166 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-3, Drawing 108003-6, Rev. 10, Sheet 6 (5/25/2023)
- ML23241A212 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 102004, Revision 87, Sheet 10, Turbine Steam Supply System (5/25/2023)
- ML23241A591 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 102004-3, Rev. 110, Rev. 3, Turbine Steam Supply System (5/25/2023)
- ML23241A421 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 102004-4, Revision 107, Sheet 4, Turbine Steam Supply System (5/25/2023)
- ML23241A605 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 102004-5, Rev. 121, Sheet 5, Turbine Steam Supply System (5/25/2023)
- ML23241A173 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 102004, Revision 102, Sheet 6, Turbine Steam Supply System (5/25/2023)
- ML23241A190 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 102004-7, Rev. 98, Sheet 7, Turbine Steam Supply System (5/25/2023)
- ML23241A058 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 102004-8, Rev. 79, Sheet 8 (5/25/2023)
- ML23241A476 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 102004-9, Rev. 19, Sheet 9 (5/25/2023)
- ML23241A550 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 108004, Revision 23, Sheet 10, Turbine Steam Supply System (5/25/2023)
- ML23241A462 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 108004, Revision 86, Sheet 3, Turbine Steam Supply System (5/25/2023)
- ML23241A244 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-4, Drawing 108004, Revision 94, Sheet 4, Turbine Steam Supply System (5/25/2023)
- ML23241A299 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 108004-5, Rev. 102, Sheet 5, Turbine Steam Supply System (5/25/2023)
- ML23241A644 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 108004-6, Rev. 84, Sheet 6, Turbine Steam Supply System (5/25/2023)
- ML23241A381 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 108004-7, Rev. 93, Sheet 7, Turbine Steam Supply System (5/25/2023)
- ML23241A682 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 108004-8, Rev. 59, Sheet 8 (5/25/2023)
- ML23241A221 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-4, Drawing 108004-9, Rev. 1, Sheet 9 (5/25/2023)
- ML23241A468 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-5, Drawing 102005, Revision 49, Sheet 2, Extraction Steam and Heater Drip Systems (5/25/2023)
- ML23241A099 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 102005-3, Rev. 46, Sheet 3, Extraction Steam and Heater Drip Systems (5/25/2023)
- ML23241A645 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 102005-4, Rev. 45, Sheet 4, Extraction Steam and Heater Drip Systems (5/25/2023)
- ML23241A053 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 102005-5, Rev. 29, Sheet 5, Extraction Steam and Heater Drip Systems (5/25/2023)
- ML23241A406 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 102005-6, Rev. 26. Sheet 6 (5/25/2023)
- ML23241A565 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 102005-7, Sheet 7 (5/25/2023)
- ML23241A296 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-5, Drawing 108005-2, Rev. 50, Sheet 2 (5/25/2023)
- ML23241A317 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-5, Drawing 108005-3, Rev. 48, Sheet 3, Extraction Steam and Heater Drip System (5/25/2023)
- ML23241A503 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 108005-4, Rev. 56, Sheet 4, Extraction Steam and Heater Drip System (5/25/2023)
- ML23241A602 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 108005-5, Rev. 53, Sheet 5, Extraction Steam and Heater Drip System (5/25/2023)
- ML23241A349 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 108005, Rev. 22, Sheet 6 (5/25/2023)
- ML23241A184 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 108005-7, Rev. 43, Sheet 7 (5/25/2023)
- ML23241A470 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-6, Drawing 102006-3, Rev. 57, Sheet 3, Auxiliary Steam System (5/25/2023)
- ML23241A291 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-6, Drawing 102006, Revision 50, Sheet 3A (5/25/2023)
- ML23241A499 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-6, Drawing 102006, Rev. 33, Sheet 3B (5/25/2023)
- ML23241A088 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-6, Drawing 102006-4, Rev. 55, Sheet 4, Auxiliary Steam System (5/25/2023)
- ML23241A609 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-6, Drawing 102006, Rev. 55, Sheet 4A, Auxiliary Steam System (5/25/2023)
- ML23241A168 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-6, Drawing 102006, Rev. 33, Sheet 5, Auxiliary Steam System (5/25/2023)
- ML23241A578 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-6, Drawing 108006, Rev. 10, Sheet 3 (5/25/2023)
- ML23241A078 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-6, Drawing 108006, Rev. 25, Sheet 4, Auxiliary Steam System (5/25/2023)
- ML23241A364 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-6, Drawing 108006, Rev. 10, Sheet 4A (5/25/2023)
- ML23241A563 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-6, Drawing 108006, Revision 13, Building Heating Drain Receiver Pumps DC-663039-6, Sheet 5 (5/25/2023)
- ML23241A469 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 102007, Revision 67, Sheet 3, Reactor Coolant System (5/25/2023)
- ML23241A619 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 102007, Rev. 71, Sheet 4, Reactor Coolant System (5/25/2023)
- ML23241A500 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 102007, Rev. 46, Sheet 5 (5/25/2023)
- ML23241A463 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 102007, Revision 57, Reactor Coolant Pumps Instrumentation, Sheet 5A (5/25/2023)
- ML23241A098 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 102007, Rev. 50, Sheet 5B (5/25/2023)
- ML23241A239 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 108007, Sheet 3, Rev. 51, Reactor Coolant System (5/25/2023)
- ML23241A119 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-7, Drawing 108007, Rev. Rev. 59, Sheet 4, Reactor Coolant System (5/25/2023)
- ML23241A453 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 108007, Rev. 37, Sheet 5 (5/25/2023)
- ML23241A191 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 108007, Rev. 51, Sheet 5A, Reactor Coolant System (5/25/2023)
- ML23241A159 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 3, Rev. 117, Chemical & Volume Control System (5/25/2023)
- ML23241A678 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Rev. 115, Sheet 3A, Chemical & Volume Control System (5/25/2023)
- ML23241A478 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 3B, Rev. 115, Chemical & Volume Control System (5/25/2023)
- ML23241A422 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Revision 115, Sheet 3C, Chemical & Volume Control System (5/25/2023)
- ML23241A630 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Revision 115, Reaactor Coolant Drain Tank, Sheet 4 (5/25/2023)
- ML23241A362 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Revision 102, Chemical & Volume Control System, Sheet 4A (5/25/2023)
- ML23241A695 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Revision 115, Sheet 4B, Chemical & Volume Control System (5/25/2023)
- ML23241A277 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Revision 117, Sheet 7C, Chemical & Volume Control System (5/25/2023)
- ML23241A360 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Revision 131, Sheet 4D, Chemical & Volume Control System (5/25/2023)
- ML23241A083 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Revision 10, Sheet 4E, Chemical & Volume Control System (5/25/2023)
- ML23241A405 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 5, Rev. 115, Chemical & Volume Control System (5/25/2023)
- ML23241A101 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Rev. 75, Sheet 7A, Chemical & Volume Control System (5/25/2023)
- ML23241A680 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Rev. 116, Sheet 5B, Chemical & Volume Control System (5/25/2023)
- ML23241A353 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Rev. 109, Rev. 5C, Chemical & Volume Control System (5/25/2023)
- ML23241A242 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Rev. 109D, Sheet 5D, Chemical & Volume Control System (5/25/2023)
- ML23241A545 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Rev. 65, Sheet 6, Chemical & Volume Control System (5/25/2023)
- ML23241A301 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 6A, Rev. 89, Chemical & Volume Control System (5/25/2023)
- ML23241A448 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Rev. 80, Sheet 7, Chemical & Volume Control System (5/25/2023)
- ML23241A251 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 102008, Rev. 104, Sheet 8 (5/25/2023)
- ML23241A509 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 8A, Rev. 98, Oil Reservoir (5/25/2023)
- ML23241A355 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 102008, Sheet 9, Rev. 102, Chemical & Volume Control System (5/25/2023)
- ML23241A648 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 108008, Revision 105, Sheet 3, Chemical & Volume Control System (5/25/2023)
- ML23241A492 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 4, Rev. 86, Chemical & Volume Control System (5/25/2023)
- ML23241A676 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 4A, Rev. 79, Chemical & Volume Control System (5/25/2023)
- ML23241A477 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 4B, Rev. 112, Chemical (5/25/2023)
- ML23241A231 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 108008, Rev. 1, Sheet 4C (5/25/2023)
- ML23241A432 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 5, Chemical & Volume Control System (5/25/2023)
- ML23241A281 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 5A, Rev. 58, Chemical & Volume Control System (5/25/2023)
- ML23241A226 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 5B, Rev. 91, Chemical & Volume Control System (5/25/2023)
- ML23241A213 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 5C, Rev. 75, Chemical & Volume Control System (5/25/2023)
- ML23241A677 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 6, Rev. 46, Chemical & Volume System (5/25/2023)
- ML23241A233 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 7, Rev. 88, Chemical & Volume Control System (5/25/2023)
- ML23241A536 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 8, Rev. 84, Chemical & Volume Control System (5/25/2023)
- ML23241A505 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 9, Rev. 79, Chemical & Volume Control System (5/25/2023)
- ML23241A582 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 102009, Sheet 3, Rev. 68, Safety Injection System (5/25/2023)
- ML23241A243 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 102009, Sheet 4, Rev. 83, Safety Injection System (5/25/2023)
- ML23241A371 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 102009, Sheet 5, Rev. 77, Safety Injection System (5/25/2023)
- ML23241A562 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 102009, Sheet 5A, Rev. 1, Safety Injection System (5/25/2023)
- ML23241A390 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 102009, Revision 19, Sheet 6, SIS Pump (5/25/2023)
- ML23241A397 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 102009, Revision 14, Sheet 7, SIS Pump Instr. (5/25/2023)
- ML23241A195 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Sheet 3, Rev. 55, Safety Injection System (5/25/2023)
- ML23241A192 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Sheet 4, Rev. 77, Safety Injection System (5/25/2023)
- ML23241A225 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Sheet 5, Rev. 65, Safety Injection System (5/25/2023)
- ML23241A114 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Rev. 2, Sheet 5A, Safety Injection System (5/25/2023)
- ML23241A341 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Sheet 6, Rev. 17, SIS Pump 2-1 (5/25/2023)
- ML23241A670 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Sheet 7, Rev. 5, SIS Pump Instr. (5/25/2023)
- ML23241A407 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5-6, Drawing 505481, Sheet 1, Rev. 3, Piping & Mechanical Auxiliary Feedwater Pump Turbine Missile Shield (5/25/2023)
- ML23241A404 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.6-2, Drawing 438288, Sheet 1, Rev. 4, Pipe Rupture Restraints Plan Below EL. 120 Containment Structure - Area "F" 7 "G" (5/25/2023)
- ML23241A393 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.6-2, Drawing 443359 Sheet 1, Rev. 3, Pipe Rupture Restrains Plan Below EL. 120 Containment Structure Are F & G (5/25/2023)
- ML23241A316 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-16, Drawing 438233, Sheet 1, Rev. 20, Interior Concrete Outline Plans At Elevation 124'-0" & 140'-0" Containment Structure (5/25/2023)
- ML23241A571 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-16, Drawing 443252, Rev. 15, Sheet 1, Civil Interior Concrete Outline Plan at El. 119-0" & 140'-0" Containment Structure Area "G" & "F" (5/25/2023)
- ML23241A708 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-17, Drawing 438234, Rev. 19, Sheet 1, Civil Interior Concrete Outline Main Sections Containment Structure (5/25/2023)
- ML23241A358 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-17, Drawing 443254, Rev. 12, Sheet 1, Civil Interior Concrete Outline Main Sections Containment Structure (5/25/2023)
- ML23241A495 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-18, Drawing 438231, Sheet 1, Rev. 7, Interior Concrete General Notes And Typical Details (5/25/2023)
- ML23241A136 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-18, Drawing 443276, Rev. 4, Sheet 1, Interior Concrete Reinforcing Typical Details and Drawing List Containment Structure (5/25/2023)
- ML23241A430 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.8-19, Drawing 438239, Revision 5, Sheet 1, Interior Concrete Reinforcing Slab at El. 91'-0" North Containment Structure Area "F" (5/25/2023)
- ML23241A689 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-19, Drawing 438240, Rev. 7, Sheet 1, Civil Interior Concrete Reinforcing Slab at El 91'-0" - South Containment Structure - Area "G" (5/25/2023)
- ML23241A320 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-19, Drawing 438242, Sheet 1. Rev. 6, Interior Concrete Reinforcing Reactor Cavity Plan Containment Structure Area F & G (5/25/2023)
- ML23241A527 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-19, Drawing 443277, Sheet 1, Rev. 3, Interior Concrete Reinforcing Sections & Details Containment Structure (5/25/2023)
- ML23241A209 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-20, Drawing 443370, Sheet 1, Rev. 4, Concrete Outline And Reinforcing Annulus Platform At Elev. 140' Containment Structure-Areas F & G (5/25/2023)
- ML23241A520 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-20, Drawing 447254, Rev. 5, Sheet 1, Civil Concrete Outline & Reinforcing Annulus Platform @ El. 140' Containment Structure F & G (5/25/2023)
- ML23241A378 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-23, Drawing 438267, Sheet 1, Rev. 2, Requirements For 200 Ton Polar Crane Containment Structure (5/25/2023)
- ML23241A075 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-47, Drawing 443204, Sheet 1, Rev. 12. Civil Concrete Outline Plans At Elev. 85'-0" & 100'-9" Auxiliary Building Area "L" (5/25/2023)
- ML23241A283 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-47, Drawing 443205, Sheet 1, Concrete Outline Floor Plans EL. 115'-0" & 140'-0" Auxiliary Building - Area L (5/25/2023)
- ML23241A512 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-49, Drawing 438441, Sheet 1, Rev. 13, Concrete Outline Section K-K Auxiliary Building - Areas H & K (5/25/2023)
- ML23241A683 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-50, Drawing 438457, Sheet 1, Rev. 10, Civil Concrete reinforcing Plan At Elev. 115'-0" Auxiliary BLDG Areas J, GE & GW (5/25/2023)
- ML23241A071 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-50, Drawing 443227, Sheet 1, Section 1, Concrete Reinforcing Plan Auxiliary Building El. 115'-0"South Areas J, GE & GW (5/25/2023)
- ML23241A537 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-51, Drawing 438458, Sheet 1, Rev. 7, Concrete Reinforcing Plan At Elev. 115'-0" Auxiliary Building Area H & K (5/25/2023)
- ML23241A428 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-52, Drawing 443216, Sheet 1, Rev. 3, Concrete reinforcing Plans At Elev. 115'-0" & 140'-0" Auxiliary Building - Area L (5/25/2023)
- ML23241A292 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-53, Drawing 443460, Sheet 1, Rev. 3, Concrete Reinforcing Miscellaneous Sections - Auxiliary BLDG Area K (5/25/2023)
- ML23241A467 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-54, Drawing 438471, Sheet 1, Rev. 11, Concrete Reinforcing - Sections Auxiliary Building Area H, K & GE (5/25/2023)
- ML23241A150 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.8-55, Drawing 438465, Rev. 3, Concrete Outline Sections at Elev. 163'-4" & 154'-6" Areas H' & K" (5/25/2023)
- ML23241A616 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-56, Drawing 438474, Revision 6, Sheet 1, Spent Fuel Pool Reinforcing Auxiliary Building - Areas J & GE (5/25/2023)
- ML23241A306 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.8-57, Drawing 439506, Rev. 8, Sheet 1, Civil Elevations and Details Crane Support Structure Auxiliary Building Areas J & K (5/25/2023)
- ML23241A590 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-58, Drawing 439507, Sheet 1, Rev. 7, Civil Typical Sections and Details Crane Support Structure Auxiliary Building Areas J & K (5/25/2023)
- ML23241A611 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-59, Drawing 439509, Sheet 1, Rev. 4, Mechanical Requirements For 125 Ton Crane Auxiliary Building Fuel Handling Area (5/25/2023)
- ML23241A328 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.8-65, Drawing 438034, Revision 7, Foundation for Water Tanks (5/25/2023)
- ML23241A632 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-65, Drawing 463987, Rev. 27, Sheet 1, Exterior Concrete Tank Protection (5/25/2023)
- ML23241A163 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-72, Drawing 59459, Sheet 1, Revision 45, Civil Concrete Outline Plan At Top Deck Area I Intake Structure (5/25/2023)
- ML23241A466 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-72, Drawing 59460, Revision 39, Sheet 1, Civil Concrete Outline Plan at Top Deck Area Intake Structure (5/25/2023)
- ML23241A128 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-73, Drawing 59461, Revision 40, Sheet 1, Civil Concrete Outline Plan @ Pump Deck Area Intake Structure (5/25/2023)
- ML23241A583 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-73, Drawing 59462, Revision 36, Sheet 1, Civil Concrete Outline Plan At Pump Deck Area 2 Intake Structure (5/25/2023)
- ML23241A626 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-74, Drawing 59463, Revision 11, Sheet 1, Civil Concrete Outline Plant at Invert Area I Intake Structure (5/25/2023)
- ML23241A440 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 3.8-74, Drawing 59464, Rev. 12, Sheet 1, Concrete Outline Plan at Invert Area 2 Intake Structure (5/25/2023)
- ML23241A182 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-83, Drawing 515213, Revision 6, Sheet 1, Architectural Safety Related Masonry Walls Turbine Building (5/25/2023)
- ML23241A311 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-84, Drawing 515214, Revision 6, Sheet 1, Architectural Safety related masonry Walls Turbine Building Elev. 85'-0", 104'-0", 107'-0", 119 (5/25/2023)
- ML23241A558 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-85, Drawing 515215, Rev. 8, Sheet 1, Architectural Safety Related Masonry Walls Auxiliary Building... (5/25/2023)
- ML23241A548 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.5-13, Drawing 500825, Sheet 1, Rev. 27, I & C Function Diagram Rector - Turbine - Generator Protection (5/25/2023)
- ML23241A272 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.5-17, Drawing 500800, Sheet 1, Rev. 20, I & C Functional Diagram Reactor - Turbine - Generator Protection (5/25/2023)
- ML23241A187 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 6.5-1, Drawing 107031, Rev. 3, Sheet 4 (5/25/2023)
- ML23241A640 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.5-2, Drawing 107031, Sheet 1A, Rev. 6, Long Term Cooling Water Systems (5/25/2023)
- ML23241A427 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495841, Sheet 1, Functional Logic Diagram Index & Symbols (5/25/2023)
- ML23241A055 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495842, Revision 3, Sheet 1, Functional Logic Diagram Reactor Trip Signals (5/25/2023)
- ML23241A606 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495843, Revision 3, Sheet 1, I & C Functional Logic Diagram Nuclear Instrumentation & Manual Trips (5/25/2023)
- ML23241A388 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495844, Rev. 3, Sheet 1, I&C Functional Logic Diagram Nuclear Instrumentation Permissives & Blocks (5/25/2023)
- ML23241A347 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495845, Sheet 1, I & C Functional Diagram Primary Coolant System Trip Signals (5/25/2023)
- ML23241A067 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495846, Sheet 1, Rev. 3, I & C Functional Logic Diagram Pressurizer Trip Signals (5/25/2023)
- ML23241A610 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495847, Sheet 1, Rev. 8, I & C Functional Logic Diagram Steam Generator Trip Signals (5/25/2023)
- ML23241A370 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 7.2-1, Drawing 495848, Rev. 10, Sheet 1, I & C Functional Logic Diagram Safeguards Actuation Signals (5/25/2023)
- ML23241A568 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495849, Revision 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks (5/25/2023)
- ML23241A250 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495850, Revision 3, Sheet 1, Electrical Functional Diagram Steam Dump Control (5/25/2023)
- ML23241A262 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495851, Sheet 1, Rev. 3, I & C Functional Logic Diagram Pressurizer Pressure & Level Control (5/25/2023)
- ML23241A100 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495852, Revision 2, Sheet 1, Functional Logic Diagram Pressurizer Heater Control (5/25/2023)
- ML23241A574 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495853, Sheet 1, Rev. 5, I & C Functional Logic Diagram Feedwater Control & Isolation (5/25/2023)
- ML23241A465 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495854, Revision 2, Sheet 1, Functional Logic Diagram Feedwater Control & Isolation (5/25/2023)
- ML23241A247 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495855, Sheet 1, Rev. 5, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup (5/25/2023)
- ML23241A129 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495856, Sheet 1, Rev. 11, I & C Turbine Trips, Runbacks & Other Signals Functional Logic (5/25/2023)
- ML23241A510 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 7.2-1, Drawing 495857, Rev. 2, Sheet 1, I & C Functional Logic Diagram AMSAC Signals (5/25/2023)
- ML23241A513 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495858, Sheet 1, Rev. 2, Functional Logic Diagram Seismic Trip (5/25/2023)
- ML23241A194 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495871, Revision 1, Sheet 1, Functional Logic Diagram Index and Symbols (5/25/2023)
- ML23241A441 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 7.2-1, Drawing 495872, Sheet 2, Sheet 1, Functional Logic Diagram Reactor Trip Signals (5/25/2023)
- ML23241A288 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 7.2-1, Drawing 495873, Rev. 4, Sheet 1, I & C Foundation Logic Diagram Nuclear Instr. & Manual Trip Signals (5/25/2023)
- ML23241A403 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Figure 7.2-1, Drawing 495874, Rev. 3, Sheet 1, I & C Functional Diagram Nuclear Instr. Permissives & Blocks (5/25/2023)
- ML23241A314 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495875, Sheet 1, Rev. 5, I & C Functional Logic Diagram Primary Coolant System Trip Signals (5/25/2023)
- ML23241A132 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495876, Sheet 1, Rev. 3, I & C Functional Logic Diagram Pressurizer Tip Signals (5/25/2023)
- ML23241A688 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495877, Revision 6, Sheet 1, I & C Functional Logic Diagram Steam Generator Trip Signals (5/25/2023)
- ML23241A148 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495878, Sheet 1, Rev. 5, I & C Functional Logic Diagram Safeguards Actuation Signals (5/25/2023)
- ML23241A324 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495879, Sheet 1, Rev. 7, I & C Functional Logic Diagram Rod Controls & Rod Blocks (5/25/2023)
- ML23241A573 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495880, Sheet 1, Revision 4, Electrical Functional Diagram Steam Dump Control (5/25/2023)
- ML23241A260 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495881, Revision 3, Sheet 1, I & C Functional Logic Diagram Pressurizer Pressure & Level Control (5/25/2023)
- ML23241A657 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495882, Rev. 2, Sheet 1, Functional Logic Diagram Pressurizer Heater Control (5/25/2023)
- ML23241A607 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495883, Revision 5, Sheet 1, I & C Functional Logic Diagram Feedwater Control & Isolation (5/25/2023)
- ML23241A588 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495884, Sheet 1, Functional Logic Diagram Feedwater Control & Isolation (5/25/2023)
- ML23241A203 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495885, Revision 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup (5/25/2023)
- ML23241A437 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495886, Revision 11, Sheet 1, I & C Functional Loop Diagram Turbine Trips, Runbacks, & Other Signals (5/25/2023)
- ML23241A636 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495887, Rev. 2, Sheet 1, I & C Functional Logic Diagram AMSAC Signals (5/25/2023)
- ML23241A202 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495888, Revision 2, Sheet 1, Functional Diagram Seismic Trip (5/25/2023)
- ML23241A211 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-1, Drawing 19425, Revision 3, Sheet 1, Logic Diagram Symbols (5/25/2023)
- ML23241A693 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-10, Drawing 102794, Rev. 3, Sheet 1, Logic Diagram Safety Injection Pumps (5/25/2023)
- ML23241A115 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-10, Drawing 19411, Rev. 4, Sheet 1, Logic Diagram Safety Injection Pumps (5/25/2023)
- ML23241A490 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-11, Drawing 102795, Sheet 1, Revision 3, Logic Diagram Containment Spray Pumps (5/25/2023)
- ML23241A547 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-11, Drawing 19412, Revision 4, Sheet 1, Logic Diagram Containment Spray Pumps (5/25/2023)
- ML23241A487 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-12, Drawing 102796, Rev. 3, Sheet 1, Electrical Logic Diagram Make-Up Water Pumps (5/25/2023)
- ML23241A575 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-12, Drawing 19413, Rev. 3, Sheet 1, Electrical Logic Diagram Primary Make-Up Water Pumps (5/25/2023)
- ML23241A177 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-13, Drawing 102797, Rev. 3, Sheet 1, Electrical Logic Diagram Boric Acid Transfer Pump (5/25/2023)
- ML23241A655 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-13, Drawing 19414, Revision 3, Sheet 1, Electrical Logic Diagram Boric Acid Transfer Pumps (5/25/2023)
- ML23241A431 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-14, Drawing 437507, Revision 26, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Motor Operated Valves (5/25/2023)
- ML23241A305 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-14, Drawing 441301, Rev. 23, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Motor Operated Valves (5/25/2023)
- ML23241A423 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-15, Drawing 437551, Revision 23, Sheet 1, Electrical Schematic Diagram Turbine Control (5/25/2023)
- ML23241A094 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-15, Drawing 441253, Revision 24, Sheet 1, Electrical Schematic Diagram Turbine Control (5/25/2023)
- ML23241A593 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-16, Drawing 437567, Rev. 38, Sheet 1, Electrical Schematic Diagram Feedwater Pump Turbine Control (5/25/2023)
- ML23241A502 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-16, Drawing 441270, Rev. 42, Sheet 1, Electrical Schematic Diagram Feedwater Pump Turbines 21 & 22 Control (5/25/2023)
- ML23241A147 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-17, Drawing 437583, Rev. 25, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps (5/25/2023)
- ML23241A665 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-17, Drawing 441302, Rev. 2, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump (5/25/2023)
- ML23241A054 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 437584, Rev. 19, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump Turbine Control (5/25/2023)
- ML23241A402 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 437584, Rev. 19, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump Turbine Control (5/25/2023)
- ML23241A164 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 441303, Rev. 14, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps Turbine Control (5/25/2023)
- ML23241A458 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 441303, Rev. 14, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps Turbine Control (2) (5/25/2023)
- ML23241A643 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 455060, Rev. 14, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps Turbine Control (5/25/2023)
- ML23241A085 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 455060, Rev. 14, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pumps Turbine Control (5/25/2023)
- ML23241A287 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 455097, Rev. 16, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump Turbine Control (5/25/2023)
- ML23241A429 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-18, Drawing 455097, Rev. 16, Sheet 1, Electrical Schematic Diagram Auxiliary Feedwater Pump Turbine Control (5/25/2023)
- ML23241A197 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-19, Drawing 437585, Rev. 23, Sheet 1, Electrical Schematic Diagram Feedwater Motor Operated Isolation Valves (5/25/2023)
- ML23241A638 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-19, Drawing 441304, Rev. 17, Sheet 1, Electrical Schematic Diagram Feedwater Motor Operated Valves (5/25/2023)
- ML23241A135 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-2, Drawing 102787, Rev. 4, Sheet 1, Logic Diagram Reactor Coolant Pumps (5/25/2023)
- ML23241A342 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-2, Drawing 338070, Rev. 3, Sheet 1, Logic Diagram Reactor Coolant Pump (5/25/2023)
- ML23241A189 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-20, Drawing 441305, Rev. 19, Sheet 1, Electrical Schematic Diagram Reactor Coolant Pumps (5/25/2023)
- ML23241A261 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-20, Drawing 477846, Rev. 18, Sheet 1, Electrical Schematic Diagram Reactor Coolant Pump (5/25/2023)
- ML23241A464 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-21, Drawing 437587, Rev. 23, Sheet 1, Electrical Schematic Diagram Reactor Coolant Motor Operated Valves (5/25/2023)
- ML23241A060 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-21, Drawing 437609, Rev. 17, Sheet 1, Electrical Schematic Diagram Reactor Coolant System Solenoid Valves (5/25/2023)
- ML23241A082 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-21, Drawing 441306, Rev. 20, Sheet 1, Electrical Schematic Diagram Reactor Coolant Motor Operated Valves (5/25/2023)
- ML23241A647 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-21, Drawing 441328, Rev. 10, Sheet 1, Electrical Schematic Diagram Reactor Coolant System Solenoid Valves (5/25/2023)
- ML23241A263 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-22, Drawing 437588, Electrical Schematic Diagram Reactor Coolant System Solenoid Valves (5/25/2023)
- ML23241A540 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-22, Drawing 441316, Rev. 6, Sheet 1, Electrical Schematic Diagram Safety Injection System Solenoid Valves (5/25/2023)
- ML23241A322 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-23, Drawing 437589, Rev. 17, Sheet 1, Electrical Schematic Diagram Safety Injection Pumps (5/25/2023)
- ML23241A521 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-23, Drawing 441315, Sheet 1, Rev. 16, Electrical Schematic Diagram Safety Injection Pump (5/25/2023)
- ML23241A700 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-24, Drawing 437590, Rev. 20, Sheet 1, Electrical Schematic Diagram Containment Spray Pumps (5/25/2023)
- ML23241A673 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-24, Drawing 441307, Rev. 16, Sheet 1, Electrical Schematic Diagram Containment Spray Pumps (5/25/2023)
- ML23241A675 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-25, Drawing 437591, Rev. 26, Sheet 1, Electrical Schematic Diagram Residual Heat Removal Pumps (5/25/2023)
- ML23241A218 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-25, Drawing 441309, Rev. 24, Sheet 1, Electrical Schematic Diagram Residual Heat Removal Pumps (5/25/2023)
- ML23241A577 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-26, Drawing 437592, Rev. 39, Sheet 1, Electrical Schematic Diagram Residual Heat Removal Flow Control Valves (5/25/2023)
- ML23241A473 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-26, Drawing 441310, Rev. 32, Sheet 1, Electrical Schematic Diagram Residual Heat Removal Motor Operated Valves (5/25/2023)
- ML23241A526 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-27, Drawing 437593, Rev. 33, Sheet 1, Electrical Schematic Diagram Component Cooling Water Pumps (5/25/2023)
- ML23241A433 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-27, Drawing 441311, Rev. 28, Sheet 1, Electrical Schematic Diagram Component Cooling Water Pumps (5/25/2023)
- ML23241A460 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-28, Drawing 437594, Rev. 33, Sheet 1, Electrical Schematic Diagram Auxiliary Salt Water Pump (5/25/2023)
- ML23241A594 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-28, Drawing 441287, Rev. 28, Sheet 1, Electrical Schematic Diagram Auxiliary Saltwater Pumps (5/25/2023)
- ML23241A220 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-29, Drawing 437595, Rev. 33, Sheet 1, Electrical Schematic Diagram Charging Pumps No. 11 & 12 (5/25/2023)
- ML23241A073 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-29, Drawing 441312, Rev. 28, Sheet 1, Electrical Schematic Diagram Charging Pumps No. 21 & 22 (5/25/2023)
- ML23241A472 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-3, Drawing 102788, Revision 5, Sheet 1, I & C Logic Diagram Centrifugal Charging Pump 2-3 (5/25/2023)
- ML23241A705 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-3, Drawing 19404, Sheet 1, Rev. 6, Electrical Logic Diagram Centrifugal Charging Pump 1-3 (5/25/2023)
- ML23241A152 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 437596, Rev. 15, Sheet 1, Electrical Schematic Reactor Coolant Make-Up Control (5/25/2023)
- ML23241A585 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 437597, Rev. 15, Sheet 1, Electrical Schematic Reactor Coolant Makeup Control (5/25/2023)
- ML23241A392 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 437598, Rev. 23, Sheet 1, Electrical Schematic Diagram C.V.C.S. and Makeup Water Pumps (5/25/2023)
- ML23241A127 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 437599, Sheet 1, Rev. 23, Electrical Schematic Diagram Chemical And Volume Control System Boric Acid Evaporator Control Valve (5/25/2023)
- ML23241A144 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 441320, Sheet 1, Rev. 11, , Electrical Schematic Diagram reactor Coolant Make-Up Control (5/25/2023)
- ML23241A451 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 441321, Revision 16, Sheet 1, Electrical Schematic Diagram Chemical and Volume Control System (5/25/2023)
- ML23241A653 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 441322, Rev. 12, Sheet 1, (5/25/2023)
- ML23241A454 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-30, Drawing 477316, Sheet 1, Rev. 6, Electrical Schematic Diagram Chemical Volume & Control System Boric Acid Evap Control Valves (5/25/2023)
- ML23241A434 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-31, Drawing 437600, Sheet 2, Rev. 4, , Electrical Schematic Diagram Containment Fan Coolers (5/25/2023)
- ML23241A285 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-31, Drawing 437600, Sheet 1, Rev. 46, , Electrical Schematic Diagram Containment Fan Coolers (5/25/2023)
- ML23241A059 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-31, Drawing 441313, Revision 38, Sheet 1, Electrical Schematic Diagram Containment Fan Coolers (5/25/2023)
- ML23241A597 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-31, Drawing 441313, Rev. 7, Sheet 2, Electrical Schematic Diagram Containment Fan Coolers No. 21, 23, 24 & 25 (5/25/2023)
- ML23241A142 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-32, Drawing 437604, Sheet 1, Rev. 23, , Electrical Schematic Diagram Containment Spray System Motor Operated Valves (5/25/2023)
- ML23241A352 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-32, Drawing 441308, Sheet 1, Rev. 18, Electrical Schematic Diagram Containment Spray System Motor Operated Valves (5/25/2023)
- ML23241A363 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-33, Drawing 437605, Rev. 22, Sheet 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (5/25/2023)
- ML23241A375 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-33, Drawing 437606, Rev. 30, Sheet 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (5/25/2023)
- ML23241A445 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-33, Drawing 437606, Sheet 2, Rev. 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (5/25/2023)
- ML23241A268 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-33, Drawing 441317, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (5/25/2023)
- ML23241A331 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-33, Drawing 441318, Sheet 1, Rev. 26, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (5/25/2023)
- ML23241A413 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-33, Drawing 441318, Sheet 2, Rev. 1, Electrical Schematic Diagram Safety Injection System Motor Operated Valves (5/25/2023)
- ML23241A531 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-34, Drawing 437607, Sheet 1, Rev. 24, Electrical Schematic Diagram Chemical And Volume Control System Motor Operated Valves (5/25/2023)
- ML23241A284 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-34, Drawing 437607, Sheet 2, Rev. 1, Electrical Schematic Diagram Chemical And Volume Control System Motor Operated Valves (5/25/2023)
- ML23241A649 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-34, Drawing 441324, Sheet 1, Rev. 19, Electrical Schematic Diagram CVCS Motor Operated Valves (5/25/2023)
- ML23241A266 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-34, Drawing 441324, Sheet 2, Rev. 1, Electrical Schematic Diagram CVCS Motor Operated Valves (5/25/2023)
- ML23241A480 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-35, Drawing 437608, Sheet 1, Rev. 20, Electrical Schematic Diagram Component Cooling System Motor Operated Valves (5/25/2023)
- ML23241A474 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-35, Drawing 441325, Sheet 1, Rev. 19, Electrical Schematic Diagram Component Cooling System Motor Operated Valves (5/25/2023)
- ML23241A420 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-36, Drawing 437610, Sheet 1, Rev. 23, Electrical Schematic Diagram Reactor Trip Breakers (5/25/2023)
- ML23241A253 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-36, Drawing 441489, Sheet 1, Rev. 17, Electrical Schematic Diagram Reactor Trip Breaker (5/25/2023)
- ML23241A120 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-37, Drawing 437630, Revision 10, Sheet 1, Schematic Diagram Fire Pumps (5/25/2023)
- ML23241A158 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-38, Drawing 437631, Revision 29, Sheet 1, Electrical Schematic Diagram Containment Purge System (5/25/2023)
- ML23241A507 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-38, Drawing 441490, Rev. 19, Sheet 1, Electrical Schematic Diagram Containment Purge System (5/25/2023)
- ML23241A165 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-39, Drawing 437632, Sheet 1, Rev. 24, Electrical Schematic Diagram Plant Air Compressors (5/25/2023)
- ML23241A627 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-4, Drawing 102789, Rev. 5, Sheet 1, Logic Diagram Centrifugal Charging Pumps (5/25/2023)
- ML23241A701 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-4, Drawing 19405, Revision 1, Logic Diagram Centrifugal Charging Pumps (5/25/2023)
- ML23241A698 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-40, Drawing 437603, Sheet 1, Rev. 7, Electrical Schematic Diagram Control Rod Drive Motor Generator Set (5/25/2023)
- ML23241A479 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-40, Drawing 437634, Sheet 1, Rev. 14, Electrical Schematic Diagram Control Rod Drive Motor Generator Set (5/25/2023)
- ML23241A093 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-40, Drawing 441487, Sheet 1, Rev. 5, Electrical Schematic Diagram Control Rod Drive Motor Generator Set (5/25/2023)
- ML23241A319 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-40, Drawing 441488, Revision 12, Electric Schematic Diagram Control Rod Drive Motor Generator Set, Sheet 1 (5/25/2023)
- ML23241A131 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7 Figure 7.3-41, Drawing 437657, Revision 23, Electrical Schematic Diagram Diesel Fuel Transfer Pumps, Sheet 1 (5/25/2023)
- ML23241A216 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-42, Drawing 437679, Revision 16, Electrical Schematic Diagram Main Steam Isolation Valves, Sheet 1 (5/25/2023)
- ML23241A706 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-42, Drawing 441296, Revision 11, Electrical Schematic Diagram Main Steam Isolation Valves, Sheet 1 (5/25/2023)
- ML23241A282 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-43, Drawing 437680, Revision 14, Electrical Schematic Diagram Sampling System Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A175 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-43, Drawing 441329, Revision 8, Electrical Schematic Diagram Sampling System Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A181 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-44, Drawing 437681, Revision 19, Electrical Schematic Diagram Component Cooling Water Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A485 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-44, Drawing 441330, Revision 15, Sheet 1, Electrical Schematic Diagram Component Cooling Water Solenoid Valves (5/25/2023)
- ML23241A699 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-45, Drawing 437682, Revision 25, Electrical Schematic Diagram Chemical & Volume Control System Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A484 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-45, Drawing 437683, Revision 24, Electrical Schematic Diagram Chemical & Volume Control System Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A246 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-45, Drawing 441326, Revision 24, Sheet 1, Electrical Schematic Diagram C.V.C.S. Soleniod Valves (5/25/2023)
- ML23241A493 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-45, Drawing 441327, Revision 14, Electrical Schematic Diagram Solenoid Valves Chemical & Volume Control System, Sheet 1 (5/25/2023)
- ML23241A154 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-46, Drawing 437684, Revision 16, Electrical Schematic Diagram Liquid Radwaste Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A452 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-46, Drawing 441319, Revision 10, Electrical Schematic Diagram Liquid Radwaste Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A257 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-47, Drawing 437685, Revision 20, Sheet 1, Electrical Schematic Diagram Steam Generator Blow Down Soleniod Valves (5/25/2023)
- ML23241A519 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-47, Drawing 441461, Revision 14, Electrical Schematic Diagram Steam Generator Blowdown Solenoid Valves, Sheet 1 (5/25/2023)
- ML23241A126 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-48, Drawing 437557, Revision 41, Sheet 1, Electrical Schematic Diagram Generator Control (5/25/2023)
- ML23241A200 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-48, Drawing 437558, Revision 38, Electrical Schematic Diagram Generator Control, Sheet 1 (5/25/2023)
- ML23241A106 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-48, Drawing 441245, Revision 30, Sheet 1, Electrical Schematic Diagram Generator Control (5/25/2023)
- ML23241A446 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-48, Drawing 441246, Revision 23, Electrical Schematic Diagram Generator Control, Sheet 1 (5/25/2023)
- ML23241A087 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-49, Drawing 437701, Revision 11, Electrical Schematic Diagram Permissive & Bypass Lights, Sheet 1 (5/25/2023)
- ML23241A076 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-49, Drawing 441369, Revision 7, Electrical Schematic Diagram Permissive & Bypass Lights, Sheet 1 (5/25/2023)
- ML23241A538 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-5, Drawing 102790, Revision 4, Logic Diagram Auxiliary Salt Water Pumps, Sheet 1 (5/25/2023)
- ML23241A398 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-5, Drawing 19406, Revision 4, Logic Diagram Auxiliary Salt Water Pumps, Sheet 1 (5/25/2023)
- ML23241A691 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-50, Drawing 442561, Revision 7, Sheet 1, Electrical Separation and Color Code Instrumentation and Control Engineered Safety Features (5/25/2023)
- ML23241A530 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-50, Drawing 445650, Revision 7, Separation & Color Code Instrumentation & Control Engineered Safety Features, Sheet 1 of 2 (5/25/2023)
- ML23241A541 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-50, Drawing 445651, Revision 10, Sheet 1, Electrical Separation and Color Code Instrumentation and Control Engineered Safety Features (5/25/2023)
- ML23241A321 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-52, Drawing 500603, Revision 6, Arrangement and Details Containment Electrical Penetration Pipe Sleeves, Sheet 1 (5/25/2023)
- ML23241A337 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-52, Drawing 500793, Revision 14, Cable Tray and Conduit Supports Containment Structure Liner, Sheet 1 (5/25/2023)
- ML23241A515 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-52, Drawing 501445, Revision 18, Electrical Cable Tray and Conduit Supports Containment Structure Liner, Sheet 1 (5/25/2023)
- ML23241A095 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-52, Drawing 57673, Revision 15, Electrical Arrangement and Details Containment Electrical Penetration Pipe Sleeves, Sheet 1 (5/25/2023)
- ML23241A555 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-6, Drawing 102791, Sheet 1, Rev. 16, Electrical Logic Diagram Containment Fan Coolers (5/25/2023)
- ML23241A077 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-6, Drawing 19407, Revision 16, Electrical Logic Diagram Containment Fan Coolers, Sheet 1 (5/25/2023)
- ML23241A628 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-7, Drawing 102792, Revision 5, Sheet 1, Electrical Logic Diagram Component Cooling Water Pumps (5/25/2023)
- ML23241A345 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-7, Drawing 19408, Rev. 8, Sheet 1, Electrical Logic Diagram Component Cooling Water Pumps (5/25/2023)
- ML23241A592 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-8, Drawing 102800, Revision 8, Logic Diagram Auxiliary Feedwater Pumps, Sheet 1 (5/25/2023)
- ML23241A581 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-8, Drawing 19409, Revision 9, Logic Diagram Auxiliary Feedwater Pumps, Sheet 1 (5/25/2023)
- ML23241A481 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-9, Drawing 102793, Revision 5, Logic Diagram Residual Heat Removal Pumps, Sheet 1 (5/25/2023)
- ML23241A140 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-9, Drawing 19410, Revision 8, Logic Diagram Residual Heat Removal Pumps, Sheet 1 (5/25/2023)
- ML23241A090 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-1, Drawing 437547, Revision 49, Electrical Single Line Meter and Relay Diagram 120V Instrument AC System, Sheet 1 (5/25/2023)
- ML23241A267 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-1, Drawing 441241, Revision 45, Electrical Single Line Meter and Relay Diagram 120V Instrument AC Ststem, Sheet 1 (5/25/2023)
- ML23241A674 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-1, Drawing 445290, Rev. 19, Sheet 1, Electrical Single Line Meter and Relay Diagram 120V Instrument AC System (5/25/2023)
- ML23241A482 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-1, Drawing 445291, Revision 28, Electrical Single Line Meter and Relay Diagram 120V Instrument AC System, Sheet 1 (5/25/2023)
- ML23241A580 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-1, Drawing 445390, Revision 25, Sheet 1, Electrical Single Line Meter And Relay Diagram 120V Instrument AC System (5/25/2023)
- ML23241A679 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6-1, Drawing 445391, Sheet 1, Rev. 31, Electrical Single Line Meter And Relay Diagram 120V Instrument AC System (5/25/2023)
- ML23241A151 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-17, Drawing 504479, Sheet 1, Rev. 6, Main Control Room Control Console & Vertical Board CC-I, C&C VB Location & Miscellaneous Structural (5/25/2023)
- ML23241A112 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-30, Drawing 480216, Rev. 1, Sheet 1, Electrical Hot Shutdown Panel Extension Board Indicators Arrangement (With Nameplate Engraving H03 (5/25/2023)
- ML23241A489 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-30, Drawing 480217, Revision 1, Electrical Hot Shutdown Panel Extension Board Switches (with Nameplate Engraving) H04, Sheet 1 (5/25/2023)
- ML23241A329 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-30, Drawing 480237, Rev. 1, Sheet 1, I & C Arrangement Hot Shutdown Panel Extension Board Indicators (HO3) and Switches (H04) with..... (5/25/2023)
- ML23241A604 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-30, Drawing 491716, Sheet 1, Rev. 5, I & C Hot Shutdown Panel Arrangements Drawing with Nameplate Engravings (5/25/2023)
- ML23241A517 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-30, Drawing 494122, Sheet 1, Rev. 1, I & C Hot Shutdown Panel Arrangement Drawing (With Nameplate Engravings) (5/25/2023)
- ML23241A425 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter Figure 7.7-31, Drawing 330557, Rev. 31, Sheet 1, I&C Auxiliary Building Control Panel Arrangement (5/25/2023)
- ML23241A443 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-6, Drawing 495860, Sheet 1, Rev. 2, I & C Functional Logic Diagram Digital Feedwater Control System FW Flow Controller & CV Demand (5/25/2023)
- ML23241A621 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-6, Drawing 495890, Rev. 2, Sheet 1, Electrical Functional Logic Diagram Digital Feedwater Control System FW Flow Controller & CV Demand (5/25/2023)
- ML23241A302 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-7, Drawing 495853, Revision 5, Sheet 1, I & C Functional Logic Diagram Feedwater Control an Isolation (5/25/2023)
- ML23241A084 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7-7, Drawing 495883, Revision 5, I & C Functional Logic Diagram Feedwater Control & Isolation, Sheet 1 (5/25/2023)
- ML23241A086 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.1-1, Drawing 502110, Rev. 22, Sheet 1, Electrical Single Line Diagram 500/230/25/12/4.16kv Systems (5/25/2023)
- ML23241A751 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.14, Drawing 496282, Rev. 13, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator No. 23 Auxiliary Motors (5/25/2023)
- ML23241A726 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.19, Drawing 441218, Revision 11, Sheet 1, Electrical Single Line Meter & Relay Diagram Pressurizer Heaters (5/25/2023)
- ML23241A234 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.2-3, Drawing 57483, Rev. 7, Sheet 1, General Arrangement Outdoors 230kv and 500Kv Switchyards (5/25/2023)
- ML23241A276 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.2-6, Drawing 500804, Revision 30, Sheet 1, Electrical Arrangement Standby Start-Up Transformers (5/25/2023)
- ML23241A635 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Drawing 437529, Rev. 50, Sheet 1, Electrical Single Line Meter & Relay Diagram Generation Excitation Main & Auxiliary Transformers (5/25/2023)
- ML23241A116 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Drawing 441226, Rev. 34, Sheet 1, Electrical Single Line Meter and Relay Diagram Generator Excitation Main and Auxiliary Transformers (5/25/2023)
- ML23241A777 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.3-10, Drawing 437626, Rev. 34, Sheet 1, Electrical Schematic Diagram 4160V Bus "G" Automatic Transfer (5/25/2023)
- ML23241A781 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-10, Drawing 441353, sheet 1, Rev. 30, Electrical Schematic Diagram 1460V Bus Section "G" Automatic Transfer (5/25/2023)
- ML23241A774 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 437627, Revision 38, Electrical Schematic Diagram 4160V Bus Section H Automatic Transfer, Sheet 1 (5/25/2023)
- ML23241A741 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 441354, Rev. 33, Sheet 1, Electrical Schematic Diagram 4160 V Bus Section "H" Automatic Transfer (5/25/2023)
- ML23241A716 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437579, Rev. 47, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 11 & 12 (5/25/2023)
- ML23241A713 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437580, Rev. 39, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 11 & 12 (5/25/2023)
- ML23241A770 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437667, Rev. 47, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 (5/25/2023)
- ML23241A721 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437668, Revision 40, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13, Sheet 1 (5/25/2023)
- ML23241A734 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441357, Rev. 44, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 (5/25/2023)
- ML23241A760 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441358, Rev. 43, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 (5/25/2023)
- ML23241A764 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496277, Rev. 7, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 (5/25/2023)
- ML23241A724 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.3-12, Drawing 496278, Revision 6, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23 (5/25/2023)
- ML23241A727 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496279, Revision 9, Sheet 1, Electrical Schematic Diagram 4160V Diesel Generator Control No. 23 (5/25/2023)
- ML23241A762 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496280, Rev. 4, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 (5/25/2023)
- ML23241A769 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496281, Rev. 8, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 (5/25/2023)
- ML23241A737 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437665, Rev. 37, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator and Associated Circuit Breakers (5/25/2023)
- ML23241A765 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437666, Revision 8, Revision 21, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers (5/25/2023)
- ML23241A756 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437676, Rev. 29, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers (5/25/2023)
- ML23241A736 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 441355, Revision 28, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators And Associated Circuit Breakers DG 21 & 22 (5/25/2023)
- ML23241A711 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 441356, Revision 13, Electrical Schematic Diagram 4KY Diesel Generators and Associated Circuit Breakers, Sheet 1 (5/25/2023)
- ML23241A722 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 496275, Revision 11, Electrical Schematic Diagram 4160V Diesel Generator No. 23 and Associated Circuit Breaker, Sheet 1 (5/25/2023)
- ML23241A771 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 496276, Revision 7, Electrical Schematic Diagram 4160V Diesel Generator No. 23 and Associated Circuit Breaker, Sheet 1 (5/25/2023)
- ML23241A731 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-14, Drawing 437674, Revision 32, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors (5/25/2023)
- ML23241A723 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-14, Drawing 441359, Revision 23, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors (5/25/2023)
- ML23241A744 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441286, Revision 11, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "F" Automatic Transfer (5/25/2023)
- ML23241A772 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441297, Revision 14, Electrical Logic Diagram 4160 Volt Bus Section "G" Automatic Transfer, Sheet 1 (5/25/2023)
- ML23241A735 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441337, Revision 13, Sheet 1, Electrical Logic Diagram 4160KV Bus Section "H" Automatic Transfer (5/25/2023)
- ML23241A718 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 458863, Revision 18, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "F" Automatic Transfer (5/25/2023)
- ML23241A738 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 458864, Rev. 18, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "G" Automatic Transfer (5/25/2023)
- ML23241A717 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 458865, Revision 1, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section "H" Automatic Transfer (5/25/2023)
- ML23241A714 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 437546, Revision 50, Electrical Line Meter and Relay Diagram 125 Volt DC System, Sheet 1 (5/25/2023)
- ML23241A755 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 441240, Revision 48, Electrical Single Line Meter and Relay Diagram 125V D.C. System, Sheet 1 (5/25/2023)
- ML23241A712 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 445075, Sheet 1, Rev. 21, Electrical Single Line Meter And Relay Diagram 125 Volt DC System (5/25/2023)
- ML23241A720 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 445076, Revision 19, Electrical Single Line Meter and Relay Diagram 125 Volt DC System, Sheet 1 (5/25/2023)
- ML23241A768 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 445295, Revision 13, Electrical Single Line Meter and Relay Diagram 125 Volt and 250 Volt D.C. System, Sheet 1 (5/25/2023)
- ML23241A742 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 455065, Revision 12, Electrical Single Line Meter and Relay Diagram 125V and 250V DC System, Sheet 1 (5/25/2023)
- ML23241A747 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-19, Drawing 437545, Revision 10, Sheet 1, Electrical Single Line Diagram Pressurized Heaters (5/25/2023)
- ML23241A567 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2, Drawing 437531, Revision 28, Sheet 1, Electrical Single Line Meter and Relay Diagram 12KV System (5/25/2023)
- ML23241A424 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-2, Drawing 441227, Revision 21, Electrical Single Line Meter & Relay Diagram 12KV System Bus Section "D" & "E", Sheet 1 (5/25/2023)
- ML23241A750 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 437614, Revision 37, Electrical Schematic Diagram Bus Potential & Synchronizing 4160V System, Sheet 1 (5/25/2023)
- ML23241A745 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 441340, Rev. 31, Sheet 1, Electrical Schematic Diagram Potential & Synchronizing Diagram 4160V Bus Sections F, G, & H (5/25/2023)
- ML23241A637 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-3, Drawing 437532, Sheet 1, Rev. 29, Electrical Single Line Meter & Relay Diagram 4160 Volt System (5/25/2023)
- ML23241A483 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-3, Drawing 441228, Revision 16, Single Line Meter & Relay Diagram 4160V System Bus Section "D"&"E", Sheet 1 (5/25/2023)
- ML23241A725 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 437533, Rev. 47, Sheet 1, Electrical Single Line Diagram Single Line Meter & Relay Diagram 4160 Volt System (5/25/2023)
- ML23241A732 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 441229, Rev. 20, Sheet 1, Electrical Single Line Meter & Relay Diagram 4160 V System Bus Section "F" DG 23 (5/25/2023)
- ML23241A759 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 441230, Revision 34, Electrical Single Line Meter & Relay Diagram 4160V System Bus Section "G" & "H: DG 21 & 22, Sheet 1 (5/25/2023)
- ML23241A773 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5, Drawing 437530, Revision 41, Electrical Single Line Meter & Relay Diagram 12KV Start-Up System, Sheet 1 (5/25/2023)
- ML23241A763 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Drawing 437916, Revision 48, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section 1F, Sheet 1 (5/25/2023)
- ML23241A719 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Drawing 441237, Revision 39, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section 2F, Sheet 1 (5/25/2023)
- ML23241A749 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 437542, Sheet 1, Rev. 57, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 1G (5/25/2023)
- ML23241A761 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 441238, Rev. 54, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section 2G (5/25/2023)
- ML23241A740 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 437543, Revision 52, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section H, Sheet 1 (5/25/2023)
- ML23241A757 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 441239, Sheet 1, Rev. 48, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 2H (5/25/2023)
- ML23241A715 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-9, Drawing 437625, Revision 32, Electrical Schematic Diagram 4160 V Bus Section "F" Automatic Transfer, Sheet 1 (5/25/2023)
- ML23241A780 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-9, Drawing 441352, Revision 26, Electrical Schematic Diagram 4160V Bus Section "F" Automatic Transfer, Sheet 1 (5/25/2023)
- ML23241A754 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-1, Drawing 511157, Sheet 1, Rev. 21, Mechanical Control Room Flow Diagram (5/25/2023)
- ML23241A782 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams (5/25/2023)
- ML23241A753 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-11, Drawing 516111, Sheet 1, Rev. 5, Mechanical Plans, Sections & Details Area "L" & GE" Elev. 140'-0" (5/25/2023)
- ML23241A778 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 501365, Revision 18, Mechanial Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 (5/25/2023)
- ML23241A739 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 59316, Revision 23, Mechanical Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 (5/25/2023)
- ML23241A748 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Drawing 59317, Sheet 1, Mechanical Flow Diagram Containment Fuel Handling & Fan Rooms (5/25/2023)
- ML23241A743 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3a, Drawing 501366, Revision 30, Mechanical Ventilation Flow Diagram Containment Fuel Handling Fan Rooms, Sheet 1 (5/25/2023)
- ML23241A752 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-8, Drawing 516103, Revision 16, Mechanical Ventilation Flow Diagrams, Sheet 1 (5/25/2023)
- ML23241A728 - Diablo Canyon Power Plant, Units 1 and 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-9, Drawing 438165, Revision 14, Civil Emergency Diesel Generator Fuel Oil System, Sheet 1 (5/25/2023)