Home > NRC Library > ADAMS Public Documents
Forwards Change 1 of Rev 1 to "Pump & Valve Inservice Test Plan," for approval.Relief from ASME Section XI Code per 10CFR50.55a(g)(6)(i) requested.
Accession Number: ML20098F043
Date Released: Tuesday, September 29, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20098F042 - Forwards Change 1 of Rev 1 to "Pump & Valve Inservice Test Plan," for approval.Relief from ASME Section XI Code per 10CFR50.55a(g)(6)(i) requested. (5 page(s), 9/25/1984)
- ML20098F046 - Change 1 of Rev 1 to "Pump & Valve Inservice Test Plan." W/27 oversize drawings.Aperture cards available in PDR. (184 page(s), 9/8/1984)
- ML20259C990 - "Instrument Installation Details." (1 page(s), 8/10/1983)
- ML20259D190 - "Flow Diagram:Chemical & Volume Control System." Sheet 2 of 2. (1 page(s), 2/21/1984)
- ML20259D158 - "Flow Diagram:Safety Injection System." Sheet 1 of 2.Rev date illegible. (1 page(s), 9/25/1984)
- ML20259D199 - "Flow Diagram:Containment Spray & Refueling Water Storage Pool." (1 page(s), 5/23/1984)
- ML20259D220 - "Flow Diagram:Miscellaneous Reactor Auxiliary Systems." Sheet 2 of 4. (1 page(s), 4/23/1984)
- ML20259D033 - "HVAC-Chilled Water Flow Diagram." Sheet 1. ACTUAL DRAWING NUMBER:LOU-1564 G-853S04 (1 page(s), 8/24/1983)
- ML20259D267 - "Flow Diagram:Service Air System." (1 page(s), 7/24/1984)
- ML20259D096 - "Flow Diagram:Reactor Coolant System." (1 page(s), 2/17/1984)
- ML20259D061 - "HVAC-Chilled Water Flow Diagram." Sheet 4. ACTUAL DRAWING NUMBER:LOU-1564 G-853S06 (1 page(s), 2/28/1984)
- ML20259D005 - "Flow Diagram:N2,H2,CO2 Systems." (1 page(s), 3/21/1980)
- ML20259D255 - "Flow Diagram:Component Closed Cooling Water System." Sheet 3 of 3. (1 page(s), 5/30/1984)
- ML20259D067 - "HVAC-Air Flow Diagram." Sheet 1. ACTUAL DRAWING NUMBER:LOU-1564 G-853S01. (1 page(s), 5/25/1984)
- ML20259D230 - "Flow Diagram:Sampling System." Sheet 2 of 4. (1 page(s), 6/1/1984)
- ML20259D081 - "HVAC-Air Flow Diagrams." Sheet 2. ACTUAL DRAWING NUMBER:LOU-1564 G-853S02. (1 page(s), 5/25/1984)
- ML20259C995 - "Instrument Schematics and Logic Diagrams." (1 page(s), 9/25/1984)
- ML20259D042 - "HVAC-Chilled Water Flow Diagram." Sheet 2. ACTUAL DRAWING NUMBER:LOU-1564 G-853S04 (1 page(s), 8/24/1983)
- ML20259D108 - "Flow Diagram:Sump Pump System." (1 page(s), 4/16/1984)
- ML20259D132 - "Flow Diagram:Boron Management System." Sheet 1 of 2. (1 page(s), 3/7/1984)
- ML20259D241 - "Flow Diagram:Component Closed Cooling Water System." Sheet 1 of 3. (1 page(s), 5/25/1984)
- ML20259D181 - "Flow Diagram:Chemical & Volume Control System." Sheet 1 of 2. (1 page(s), 1/18/1984)
- ML20259D171 - "Flow Diagram:Safety Injection System." Sheet 2 of 2. (1 page(s), 4/9/1984)
- ML20259D208 - "Flow Diagram:Miscellaneous Reactor Auxiliary Systems." Sheet 1 of 4. (1 page(s), 6/27/1984)
- ML20259D139 - "Flow Diagram:N2,H2,CO2 Systems." Sheet 1 of 2. (1 page(s), 5/25/1984)
- ML20259D120 - "Flow Diagram:Waste Management System." Sheet 2 of 2. (1 page(s), 6/6/1984)
- ML20259D051 - "HVAC-Chilled Water Flow Diagram." Sheet 3. ACTUAL DRAWING NUMBER:LOU-1564 G-853S05 (1 page(s), 8/24/1983)
- ML20259D249 - "Flow Diagram:Component Closed Cooling Water System." Sheet 2 of 3. (1 page(s), 4/23/1984)
- ML20259D275 - "Flow Diagram:Feedwater,Condensate & Air Evacuation Sys." Sheet 2 of 2. (1 page(s), 4/17/1984)