Web package for FOIA/PA-2011-0030
Accession Number: ML110130171
Date Released: Tuesday, January 25, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML103210136 - FOIA/PA-2011-0030 - Indian Pt 3- all construction oversight reports, const insp rpts, & const oversight mtg rpts, concerning construction qual ctrl, QA manuals, procedures, instructions, or other docs/communications re: quality of concrete (6 page(s), 11/17/2010)
- ML103490666 - FOIA/PA-2011-0030 - Resp 1 - Final. (39 page(s), 12/13/2010)
- ML093480204 - Suppl 1 to Indian Point,Unit 3 PSAR. (607 page(s), 8/30/1968)
- ML093480222 - Suppl 2 to Indian Point,Unit 3 PSAR. (113 page(s), 9/16/1968)
- ML100270972 - CO Insp Rept 50-286/68-01 on 681120-21.No items of nonconformance.Major areas inspected:concrete requirements per PSAR. (4 page(s), 12/13/1968)
- ML100270185 - Forwards CO Insp Rept 50-286/68-01 on 681120-21.No noncompliance noted. (1 page(s), 12/19/1968)
- ML100270974 - CO Insp Rept 50-286/69-01 on 690120 & 24.Major areas inspected:evaluation of QC program re placement of containment bldg base mat & containment liner floor. (8 page(s), 2/11/1969)
- ML100270183 - CO Insp Rept 50-286/69-02 on 690116-17.No noncompliance noted.Major areas inspected:C-E QC records re reactor pressure vessel. (15 page(s), 2/19/1969)
- ML100270975 - CO Pressure Vessel Insp Rept 50-286/69-02 on 690116-17.Major areas inspected:visit to C-E plant to conduct initial review of QC records re reactor pressure vessel. (6 page(s), 2/19/1969)
- ML100270175 - Forwards CO Insp Rept 50-286/69-02 on 690116-17.No noncompliance noted.C-E QC sys found to be effective in fabrication of vessel.Vessel hydrostatic test scheduled for Apr 1969. (1 page(s), 3/6/1969)
- ML100270976 - CO Insp Repts 50-261/69-05,50-247/69-04,50-286/69-04, 50-250/69-06,50-251/69-03,50-244/69-06,50-266/69-04 & 50-301/69-03 on 690318-21.Noncompliance noted:open cans of low-hydrogen electrodes in stockroom & welding areas. (18 page(s), 4/22/1969)
- ML100270083 - CO Insp Rept 50-286/69-03 on 690318 & 24.Major areas inspected:QA program & applicant involvement in implementing program as outlined in QA suppl to PSAR. (7 page(s), 5/2/1969)
- ML100270150 - Forwards CO Insp Rept 50-286/69-03 on 690318 & 24.Internal task force formed to expedite documentation of QA program. (1 page(s), 5/7/1969)
- ML100270977 - CO Insp Rept 50-286/69-05 on 690430-0501.Nonconformance noted:cement certificate from cement manufacturer attesting to ASTM-C-150 not available for period 681127-690110 & user samples of cement at batch plant not made. (9 page(s), 6/3/1969)
- ML100151257 - Forwards Vendor CO Insp Repts 50-261/69-05,50-247/69-04, 50-286/69-04,50-250/69-06,50-251/69-03,50-244/69-06, 50-266/69-04 & 50-301/69-03 of Westinghouse Lester,PA plant on 690318-21. (1 page(s), 6/18/1969)
- ML100151263 - Vendor CO Insp Repts 50-261/69-05,50-247/69-04,50-286/69-04, 50-250/69-06,50-251/69-03,50-244/69-06,50-266/69-04 & 50-301/69-03 of Westinghouse Lester,PA plant on 690318-21. Major area inspected:steam generators. (9 page(s), 6/18/1969)
- ML100270126 - Forwards CO Insp Rept 50-286/69-05 on 690430-0501.Corrective actions have been taken re items of nonconformance to PSAR, Suppl 2. (1 page(s), 6/25/1969)
- ML100270978 - CO Insp Rept 50-286/69-06 on 690625-26.Major areas inspected:review status of deficiencies found in last insp, concrete batch plant & control of aggreggates & status of written procedures listed in App E of QA suppl to PSAR. (9 page(s), 8/13/1969)
- ML100270123 - Forwards CO Insp Rept 50-286/69-06 on 690625-26.Concrete QC program will be reinspected shortly after concrete work resumes. (2 page(s), 8/21/1969)
- ML100270119 - Forwards Vendor Insp Rept CE 69-02 on 690721-23. Indian Point 3 Reactor Pressure Vessel Meets Requirements of Section III of ASME Code. Addl Insps of Calhoun & Cooper Vessels Will be Made. (22 page(s), 9/3/1969)
- ML100270079 - CO Insp Rept 50-286/69-07 on 691008-09.Major areas inspected:action taken on previous deficiency items & review of overall QC procedures. (12 page(s), 11/3/1969)
- ML100270115 - Forwards CO Insp Rept 50-286/69-07 on 691008-09.Concrete QC has improved sufficiently to obviate any need for mgt meeting.Cladding will be added to reactor pressure vessel nozzles & safe ends. (2 page(s), 11/6/1969)
- ML100270979 - CO Insp Rept 50-286/69-08 on 691029.Major areas inspected: purpose,scope,organization & insp techniques explained to licensee corporate mgt,QA auditor,US Testing Co & reasonable project personnel. (4 page(s), 11/6/1969)
- ML100270112 - Forwards CO Mgt Meeting Rept 50-286/69-08 on 691029.QA insp scheduled for wk of 691117. (1 page(s), 11/12/1969)
- ML100270980 - CO Insp Rept 50-286/69-09 on 691117-20.Major areas inspected:QA program. (37 page(s), 12/31/1969)
- ML100251832 - Summarizes 700105 telcon w/util re concrete slump testing & caldweld splice spacing.Westinghouse & util feel that slump test performance on each truckload of concrete unneccessary. Nonremoval of improperly staggeered splices proposed. (1 page(s), 1/14/1970)
- ML100270110 - Forwards CO Insp Rept 50-286/69-09 on 691117-20.Transition of Wedco in progress.Weakness in overall QA program will be discussed in 700116 meeting. (1 page(s), 1/23/1970)
- ML100270080 - CO Insp Rept 50-286/70-01 on 700116.Nonconformance noted: Wedco Corp organization of procedures not documented or completed to degree sufficient to review,QA records retention policy not formalized or procedure written. (6 page(s), 1/26/1970)
- ML100270106 - Forwards CO Mgt Meeting Rept 50-286/70-01 on 700116.Official position of Wedco re facility not yet defined. (1 page(s), 2/5/1970)
- ML100270981 - CO Insp Rept 50-286/70-02 on 700127-28.Major areas inspected:appropriate Sections PI 3800/2 & followup on items previously identified in initial QA insp. (21 page(s), 3/4/1970)
- ML100270105 - Forwards CO Insp Rept 50-286/70-02 on 700127-28.Draft of Wedco QA manual has been developed & will be reviewed by Region 1.Several QA-QC procedures were not available on site. (1 page(s), 3/13/1970)
- ML100270081 - CO Insp Rept 50-286/70-03 on 700324-25.Major areas inspected:followup on items previously identified as part of initial QA insp. (7 page(s), 5/7/1970)
- ML100270104 - Forwards CO Insp Rept 50-286/70-03 on 700324-25.Recommends that licensee be required to update application to reflect Wedco QA-QC responsibility. (3 page(s), 5/22/1970)
- ML100270982 - CO Insp Rept 50-286/70-04 on 700714-16.Major areas inspected:Attachments C,E,F & G to Provisional Instruction 3800/2. s (52 page(s), 8/13/1970)
- ML100270103 - Forwards CO Insp Rept 50-286/70-04 on 700714-16.Repair of containment liner deviation initiated.Procedures for correcting deviations reviewed & approved. (14 page(s), 8/20/1970)
- ML100270983 - CO Insp Rept 50-286/70-05 on 700824-27.Major areas inspected:requirements of Attachment C, "Containment" & applicable portions of Attachment J, "Reactor Vessel." (6 page(s), 9/22/1970)
- ML100270102 - Forwards CO Insp Rept 50-286/70-05 on 700824 & 26.Records of nitrogen purge were not available for 700706-15 during shipment of reactor vessel. (9 page(s), 9/28/1970)
- ML100270984 - CO Insp Rept 50-286/70-06 on 701116-17.Major areas inspected:appraisal of performance of licensee-contractor efforts re various const items listed in PI3800/2,Attachment J re reactor vessel & head. (7 page(s), 12/17/1970)
- ML100270101 - Forwards CO Insp Rept 50-286/70-06 on 701116-17.Const deficiency notice issued on 701215. (1 page(s), 12/21/1970)
- ML100270099 - Responds to NRC 701215 ltr re violations noted in CO Insp Rept 50-286/70-06.Corrective actions:procedure for monitoring reactor head will be revised & crane malfunction is being investigated. (5 page(s), 2/11/1971)
- ML100270091 - Requests comments on noncompliance noted during 710126-28 insp,concerning lack of documentation re quality of two steam generators & four accumulators. (2 page(s), 2/12/1971)
- ML100270097 - Ack receipt of 710211 ltr informing NRC of steps taken to correct violations noted in CO Insp Rept 50-286/70-06. (2 page(s), 2/18/1971)
- ML100270985 - CO Insp Rept 50-286/71-01 on 710126-28.Nonconformance noted: two steam generators & four accumulators set in place & no documentation re quality of components on site. (14 page(s), 2/26/1971)
- ML100270090 - Forwards CO Insp Rept 50-286/71-01 on 710126-28.Const deficiency notice issued for lack of documentation attesting to quality on two steam generators & four accumulators. (1 page(s), 3/8/1971)
- ML100270986 - CO Insp Rept 50-286/71-02 on 710406-07.Major areas inspected:selected elements of PI3800/2 including Attachment C (concrete records),Attachment E (refueling canal liner) & outstanding insp items. (8 page(s), 5/6/1971)
- ML100270085 - Forwards CO Insp Rept 50-286/71-02 on 710406-07.No noncompliance noted. (5 page(s), 5/21/1971)
- ML100270987 - CO Insp Rept 50-286/71-03 on 710524.Major areas inspected: review of QC records of polar crane refurbishing,reactor vessel insp following lifting incident & crane load test results. (4 page(s), 6/7/1971)
- ML100270084 - Forwards CO Insp Rept 50-286/71-03 on 710524.No noncompliance noted. (5 page(s), 6/11/1971)
- ML100270988 - CO Insp Rept 50-286/71-04 on 710720-22.Major areas inspected:records of insp & security of reactor vessel head. (11 page(s), 9/1/1971)
- ML100270254 - Forwards CO Insp Rept 50-286/71-04 on 710720-22.No noncompliance noted. (1 page(s), 9/2/1971)
- ML100270989 - CO Insp Rept 50-286/71-05 on 711026-28.Major areas inspected:status of previously reported unresolved items. (10 page(s), 11/23/1971)
- ML100270250 - Discusses CO insp on 711026-28.No nonconformance noted.Major areas inspected:welding of containment liner,containment concrete & rebar placement. (2 page(s), 11/24/1971)
- ML100251808 - Forwards CO Insp Rept 50-286/71-05 on 711026-28. (2 page(s), 12/6/1971)
- ML100270215 - RO Insp Rept 50-286/72-06 on 721208.No noncompliance noted. Major areas inspected:exam of procedures & representative records,interviews w/personnel & observations by inspector. (7 page(s), 1/2/1972)
- ML100270247 - Forwards description of noncompliance items from insp on 720127 & 28. (2 page(s), 3/1/1972)
- ML100270249 - Description of noncompliance items from insp on 720127 & 28. Noncompliance noted:welding electrode control program changed to delete requirement for recording heat numbers on field weld record. (1 page(s), 3/1/1972)
- ML100270990 - CO Insp Rept 50-286/72-01 on 720127-28.Nonconformance noted: traceability of welding electrodes not maintained for reactor coolant piping field welding. (8 page(s), 3/2/1972)
- ML100270252 - Forwards CO Insp Rept 50-286/72-01 on 720127-28. (22 page(s), 3/3/1972)
- ML100270242 - RO Insp Rept 50-286/72-02 on 720524 & 25.Noncompliance noted:no documented procedures or criteria for determining that cable trays,conduits & cable installation were properly accomplished. PROBABLE DELETE:DUPE OF 8111160148. (11 page(s), 6/22/1972)
- ML100270991 - RO Insp Rept 50-286/72-02 on 720524-25.Nonconformance noted: QC plan approved by UE&C & Wedco purchase order re const of refueling water storage tank not available on site. (11 page(s), 6/22/1972)
- ML100270240 - Responds to NRC 720629 ltr re noncompliance items noted in RO Insp Rept 50-286/72-02.Corrective actions:implemented program which provides for systematic documented insp of installation of cable trays,conduit & cable. (5 page(s), 7/27/1972)
- ML100270232 - RO Insp Rept 50-286/72-03 on 720830-0901.Noncompliance noted:reinstalled cable trays not properly marked, documentation of continuity & insulation resistance procured for installation inside PROBABLE DELETE:DUPE OF 8111160152. (20 page(s), 10/5/1972)
- ML100270992 - RO Insp Rept 50-286/72-03 on 720830-31 & 0901.Nonconformance noted:no power to heater for motor on containment spray pump B-31. (10 page(s), 10/5/1972)
- ML100270227 - RO Insp Rept 50-286/72-04 on 721026.Noncompliance noted: documentation of tests on cable for use within containment not yet completed & condition of cleanliness of reactor vessel interior failed to meet requirements. (7 page(s), 11/6/1972)
- ML100270221 - RO Insp Rept 50-286/72-05 on 721120-22.Noncompliance noted: QA program does not include requirement for regular review of status & adequacy & no evidence exists that such reviews are being accomplished. (17 page(s), 1/10/1973)
- ML100270209 - RO Insp Rept 50-286/73-01 on 730123-24.No noncompliance noted.Major areas inspected:exams of procedures, representative records,personnel interviews & observations by inspector. (10 page(s), 2/15/1973)
- ML100270206 - Forwards RO Insp Repts 50-286/73-01 on 730123.No noncompliance noted. (6 page(s), 2/16/1973)
- ML100270201 - Forwards RO Insp Rept 50-286/73-02 on 730206.No noncompliance noted. (5 page(s), 3/12/1973)
- ML100270195 - RO Insp Rept 50-286/73-04 on 730502-04.Noncompliance noted: nonconforming cable reel bearing hold tag observed in work area F & seven nonconforming cable reels bearing hold tags observed in cable yard among cable for use. (17 page(s), 5/25/1973)
- ML100252181 - RO Insp Repts 50-003/73-08 & 50-286/73-05 on 730606-08.No noncomppliance noted.Major areas inspected:radiological environ monitoring program,air particulate sampling & surface water sampling. PROBABLE DELETE:DUPE OF 8111190181. (23 page(s), 7/30/1973)
- ML100270190 - RO Insp Repts 50-003/73-08 & 50-286/73-05 on 730606-08. Noncompliance noted:air particulate sampling,using mobile monitor,not performed in timely manner.Tritium analysis not performed on rainfall samples in timely manner. (23 page(s), 7/30/1973)
- ML100270169 - IE Insp Rept 50-286/73-06 on 730716-18.Noncompliance noted: prints of drawings which were not latest revision observed on stick file of controlled drawings in craft ofc. (15 page(s), 8/16/1973)
- ML100270152 - RO Insp Rept 50-286/73-07 on 730723-27.No noncompliance noted.Major areas inspected:exams of procedures & representative records,interviews w/plant personnel & observations by inspector. (24 page(s), 8/22/1973)
- ML100270148 - Forwards RO Insp Rept 50-286/73-07 on 730723-27.No noncompliance noted. (3 page(s), 8/23/1973)
- ML100252175 - Forwards RO Insp Repts 50-003/73-08 & 50-286/73-05 on 730606-08.No noncompliance noted. (1 page(s), 8/28/1973)
- ML100270147 - RO Insp Rept 50-286/73-08 on 730828-30.No noncompliance noted.Major areas inspected:exams of procedures & representative records,interviews w/plant personnel & observations by inspector. (6 page(s), 9/14/1973)
- ML100270136 - Forwards RO Insp Rept 50-286/73-08 on 730828-30.No noncompliance noted.W/o encl. (2 page(s), 9/18/1973)
- ML100250841 - Ack receipt of 730830 ltr informing AEC of steps taken to correct violations noted in RO Insp Rept 50-003/73-08 & 50-286/73-05. (2 page(s), 9/20/1973)
- ML100270145 - RO Insp Rept 50-286/73-09 on 730918-21.Noncompliance noted: program for test documentation of safety cables incomplete. Failure to implement procedure for resetting valve position limit switches. (16 page(s), 10/12/1973)
- ML100270139 - IE Insp Rept 50-286/73-10 on 730919-21 & 28.No noncompliance noted.Major areas inspected:documentations that address interface of const to operation & overall preoperational test program. (16 page(s), 10/15/1973)
- ML100270137 - Forwards IE Insp Rept 50-286/73-10 on 730919-21 & 28.No noncompliance noted. (3 page(s), 10/16/1973)
- ML100270135 - RO Insp Rept 50-286/73-11 on 731029-31.No noncompliance noted.Major areas inspected:exams of procedures & representative records;interviews w/personnel & observations by inspector. (8 page(s), 11/12/1973)
- ML100270132 - Forwards RO Insp Rept 50-286/73-11 on 731029-31.No noncompliance noted. (2 page(s), 11/14/1973)
- ML100270131 - RO Insp Rept 50-286/73-12 on 731112-15.Noncompliance noted: carbon steel wire rope & carbon steel wires in close contact w/stainless steel pipes & QC reviews unavailable for valves in waste disposal sys. (13 page(s), 12/3/1973)
- ML100270122 - RO Insp Rept 50-286/73-13 on 731119-21.No noncompliance noted.Major areas inspected:exams of procedures and representative records,personnel interviews & observations by inspector. (8 page(s), 12/11/1973)
- ML100270117 - Forwards RO Insp Rept 50-286/73-13 on 731119-21.No noncompliance noted. (2 page(s), 12/17/1973)
- ML100270116 - RO Insp Repts 50-286/73-14 on 731206 & 07.No noncompliance noted.Major areas inspected:exams of procedures & representative records,interviews w/personnel & observations by inspector. (6 page(s), 12/20/1973)
- ML100270113 - Forwards RO Insp Rept 50-286/73-14 on 731206 & 07.No noncompliance noted. (2 page(s), 12/21/1973)
- ML100270107 - Forwards RO Insp Rept 50-286/73-15 on 731210-11.No noncompliance noted. (2 page(s), 1/21/1974)
- ML100270965 - IE Insp Rept 50-286/74-01 on 740107-09.No noncompliance noted.Major areas inspected:exams of procedures & representative records,interviews w/personnel,measurements & observations by inspector. (7 page(s), 1/25/1974)
- ML100270963 - Forwards IE Insp Repts 50-286/74-01 on 740107-09.No noncompliance noted. (2 page(s), 1/28/1974)
- ML100250835 - Submits corrections to RO Insp Repts 50-286/73-14 on 731206 & 07 & 50-286/73-15 on 731210 & 12.Insp rept numbers should be 50-286/73-15 & 50-286/73-16 respectively. (1 page(s), 2/1/1974)
- ML100270957 - RO Insp Rept 50-286/74-03 on 740129.No noncompliance noted. Major areas inspected:applicability of all quality affecting activities & details of procedures & procedural controls. (3 page(s), 2/12/1974)
- ML100270955 - Forwards RO Insp Rept 50-286/74-03 on 740129.No noncompliance noted. (3 page(s), 2/14/1974)
- ML100252121 - RO Insp Rept 50-286/74-02 on 740123-28 & 0219-22.No noncompliance noted.Major areas inspected:control rod drop test,loss of offsite power,leak detection sys & reactor component handling sys. (17 page(s), 3/5/1974)
- ML100270960 - RO Insp Rept 50-286/74-02 on 740123-28 & 0219-22.No noncompliance noted.Major areas noted:exams of procedures & representative records,personnel interviews,measurements & observations by inspector. (17 page(s), 3/5/1974)
- ML100252120 - Forwards RO Insp Rept 50-286/74-02 on 740123-28 & 0219-22. No noncompliance noted. (3 page(s), 3/6/1974)
- ML100270958 - Forwards RO Insp Rept 50-286/74-02.No noncompliance noted. (2 page(s), 3/6/1974)
- ML100270951 - Forwards RO Insp Rept 50-286/74-04 on 740226-28.No noncompliance noted. (2 page(s), 3/15/1974)
- ML100270953 - RO Insp Rept 50-286/74-04 on 740226-28.No noncompliance noted.Major areas inspected:exams of procedures, representative records,personnel interviews & observations by inspector. (10 page(s), 3/15/1974)
- ML100270948 - Forwards RO Insp Rept 50-286/74-05 on 740406-08.No noncompliance noted. (2 page(s), 3/26/1974)
- ML100270950 - RO Insp Rept 50-286/74-05 on 740406-08.No Noncompliance noted.Major areas inspected:exam of procedures & representative records,interviews w/personnel & observations by inspector. (12 page(s), 3/26/1974)
- ML100270943 - Forwards RO Insp Rept 50-286/74-06 on 740405.No noncompliance noted. (2 page(s), 4/19/1974)
- ML100270946 - RO Insp Rept 50-286/74-06 on 740405.No noncompliance noted. Major areas inspected:evaluation of welds,procedures, technician qualifications & vendor surveillance. (8 page(s), 4/19/1974)
- ML100270940 - RO Insp Rept 50-286/74-07 on 740416-19.Noncompliance noted: administrative controls for review & approval of safety-related facility procedures not in accordance w/ requirements. (7 page(s), 4/30/1974)
- ML100270930 - Forwards RO Insp Rept 50-286/74-09 on 740507-10.No noncompliance noted. (2 page(s), 5/30/1974)
- ML100270935 - RO Insp Rept 50-286/74-09 on 740507-10.No noncompliance noted.Major areas inspected:reconst of reactor coolant support structures,exam of replacement kits for W-2 switches & Procedure WEGR-44. (12 page(s), 5/30/1974)
- ML100270923 - Forwards RO Insp Rept 50-286/74-10 on 740521.No noncompliance noted. (2 page(s), 6/7/1974)
- ML100270927 - RO Insp Rept 50-286/74-10 on 740521.No noncompliance noted. Major areas inspected:QA documentation at Westinghouse Cheswick facility to support quality releases written for various portions of reactor coolant pumps. (6 page(s), 6/7/1974)
- ML100270921 - RO Insp Rept 50-286/74-11 on 740611-13.Noncompliance noted: failure to take measures to prevent inadvertent use on installation of seismic restraint & failure to follow clean room area procedures. (14 page(s), 6/26/1974)
- ML100270897 - Forwards RO Insp Rept 50-286/74-13 on 740805-07.No noncompliance noted. (2 page(s), 8/14/1974)
- ML100270902 - RO Insp Rept 80-286/74-13 on 740805-07.No noncompliance noted.Major areas inspected:licensee action on previously reported unresolved items. (6 page(s), 8/14/1974)
- ML100270911 - RO Insp Rept 50-286/74-12 on 740729-0801.No noncompliance noted.Major areas inspected:preoperational test procedure preparation status,test results review & test procedure review. (10 page(s), 8/14/1974)
- ML100270904 - Forwards RO Insp Rept 50-286/74-12 for action.Preoperational testing procedures for ECCS does not include testing of accumulator isolation valves under differential pressure conditions per Reg Guide 1.79,Paragraph C.3.c(2). (1 page(s), 8/15/1974)
- ML100270909 - Forwards RO Insp Rept 50-286/74-12 on 740729-0801.No noncompliance noted. (2 page(s), 8/15/1974)
- ML100270896 - RO Insp Rept 50-286/74-15 on 740805-08.No noncompliance noted.Major areas inspected:health physics & chemistry program status. (10 page(s), 8/21/1974)
- ML100270893 - Forwards RO Insp Rept 50-286/74-14 on 740805-08. No noncompliance noted. (2 page(s), 8/23/1974)
- ML100252078 - Forwards RO Insp Rept 50-286/74-12 on 740729-0801 re deficiency in applicant proposed preoperational testing program for ECCS.Licensee should be required to comply w/AEC regulatory position re testing. (1 page(s), 9/5/1974)
- ML100270864 - Forwards RO Insp Rept 50-286/74-16 on 740904.No noncompliance noted. (2 page(s), 9/9/1974)
- ML100270867 - RO Insp Rept 50-286/74-16 on 740904.No noncompliance noted. Major areas inspected:QA programs items. (1 page(s), 9/9/1974)
- ML100270868 - Forwards RO Insp Rept 50-286/74-15 on 740904-06.No noncompliance noted. (2 page(s), 9/17/1974)
- ML100270870 - IE Insp Rept 50-286/74-15 on 740904-06.No noncompliance noted.Major areas inspected:compiling & review of dimensional data on primary coolant boundary valves, reactor internals fitup & control of const drawings. (10 page(s), 9/17/1974)
- ML100270855 - Forwards RO Insp Rept 50-286/74-18 on 740928-1001.No noncompliance noted. (2 page(s), 10/9/1974)
- ML100270857 - RO Insp Rept 50-286/74-18 on 740916-20,No noncompliance noted.Major areas inspected:cold hydrotest of reactor primary coolant sys. (4 page(s), 10/9/1974)
- ML100252094 - Forwards RO Insp Rept 50-286/74-16.Licensee does not currently meet QA program stds because programmatic nonconformance w/guides & stds to which licensee is not committed was not documented. (1 page(s), 11/12/1974)
- ML100270853 - Forwards RO Insp Rept 50-286/74-20 on 740909-13,1015-18 & 21-25.No noncompliance noted. (2 page(s), 11/12/1974)
- ML100270854 - RO Insp Rept 50-286/74-20 on 740909-13,1015-18 & 21-25. No noncompliance noted.Major areas inspected:partial review of QA manual & implementing procedures. (13 page(s), 11/12/1974)
- ML100270846 - RO Insp Rept 50-286/74-22 on 741111-13.No noncompliance noted:several unassembled hydraulic seismic restraints located on floor near steam generator supports were unprotected from damage. (9 page(s), 11/27/1974)
- ML100270848 - Forwards RO Insp Rept 50-286/74-21 on 741107-08.No noncompliance noted.Rept withheld (ref 10CFR2.790). (4 page(s), 12/6/1974)
- ML100270838 - Forwards RO Insp Repts 50-247/74-24 & 50-286/74-24 on 741211 & 12.No noncompliance noted. (2 page(s), 1/10/1975)
- ML100270835 - Forwards RO Insp Rept 50-286/74-26 on 741216-20.No noncompliance noted. (2 page(s), 1/15/1975)
- ML100270837 - RO Insp Rept 50-286/74-26 on 741216-20.No noncompliance noted.Major areas inspected:procedure review for vapor containment structural integrity test & leakage rate test & review of Tupe B & C leak rate tests. (16 page(s), 1/15/1975)
- ML100270820 - IE Insp Rept 50-286/75-03 on 750108-10.No noncompliance noted.Major areas inspected:initial fuel loading & power ascension testing. (14 page(s), 1/21/1975)
- ML100270818 - Forwards IE Insp Rept 50-286/75-03 on 750108-10.No noncompliance noted. (2 page(s), 1/22/1975)
- ML100270822 - Forwards IE Insp Rept 50-286/75-02 on 750106-10.No noncompliance noted. (2 page(s), 1/22/1975)
- ML100270824 - IE Insp Rept 50-286/75-02 on 750106-10.No noncompliance noted.Major areas inspected:diesel generator,auxiliary feedwater pump,safety injection sys,radiation monitoring sys & RCS. (20 page(s), 1/22/1975)
- ML100270832 - Forwards RO Insp Rept 50-286/75-04 on 750111-14.No noncompliance noted. (2 page(s), 1/22/1975)
- ML100270834 - RO Insp Rept 50-286/75-04 on 750111-14.No noncompliance noted.Major areas inspected:repair work on containment equipment hatch & implementation of containment structural integrity test. (8 page(s), 1/22/1975)
- ML100270829 - Forwards RO Insp Rept 50-286/74-27 on 741216-20.No noncompliance noted. (2 page(s), 1/23/1975)
- ML100270831 - RO Insp Rept 50-286/74-27 on 741216-20.No noncompliance noted.Major areas inspected:program status of health physics & chemistry,installation & operational status of radwaste,ventilation & exhaust sys. (8 page(s), 1/23/1975)
- ML100270827 - IE Insp Rept 50-286/75-01 on 750105-12 & 19-20.No noncomoliance noted.Major areas inspected:vapor containment structural integrity test & leakage rate test from 750112-20. (15 page(s), 2/13/1975)
- ML100270825 - Forwards IE Insp Rept 50-286/75-01 on 750105-12 & 19-20. No noncompliance noted. (2 page(s), 2/14/1975)
- ML100270828 - Forwards IE Insp Rept 50-286/75-01 for appropriate action re containment leakage test results & instrumentation error. W/o encl. (2 page(s), 2/14/1975)
- ML100270817 - IE Insp Rept 50-286/75-05 on 750128 & 31 & 0203,04,10 & 11. No noncompliance noted.Major areas inspected:four loop plant torque tube,status of facility procedures & mgt interview. (13 page(s), 2/23/1975)
- ML100270815 - Forwards IE Insp Rept 50-286/75-05 on 750128 & 31 & 0203, 04,10 & 11.No noncompliance noted. (2 page(s), 2/25/1975)
- ML100270813 - IE Insp Rept 50-286/75-06 on 750227-28.Noncompliance noted: three pieces of uni-strut found welded to inside surface of pressure-retaining matl of personnel air lock. (9 page(s), 3/21/1975)
- ML100270803 - Forwards IE Insp Rept 50-286/75-07 on 750317-18.No noncompliance noted. (2 page(s), 3/25/1975)
- ML100270805 - IE Insp Rept 50-286/75-07 on 750317-18.No noncompliance noted.Major areas inspected:corrective actions in response to IE Insp Repts 50-286/69-04 & 50-286/74-22. (8 page(s), 3/25/1975)
- ML100270801 - IE Insp Rept 50-286/75-08 on 750319-21.Noncompliance noted: failure to provide signature verification that svc water Functional Test - Dock Area Procedure INT-TP-4.12.1,had been performed properly. (10 page(s), 4/1/1975)
- ML100270793 - IE Insp Rept 50-286/75-10 on 750423-25.No noncompliance noted.Major areas inspected:licensee response to items identified in IE Insp Rept 50-286/75-07. (17 page(s), 5/9/1975)
- ML100270790 - Forwards IE Insp Rept 50-286/75-10 on 750423-25.No noncompliance noted. (2 page(s), 5/12/1975)
- ML100270787 - IE Insp Rept 50-286/75-11 on 750424-25 & 0507.No noncompliance noted.Major areas inspected:vapor containment integrated leak rate test rept. (11 page(s), 5/22/1975)
- ML100270784 - Forwards IE Insp Rept 50-286/75-11 on 750424-25 & 0507. No noncompliance noted. (2 page(s), 5/28/1975)
- ML100270772 - IE Insp Rept 50-286/75-14 on 750520-21.No noncompliance noted.Major areas inspected:review of program satus re areas of health physics & chemistry. (8 page(s), 6/2/1975)
- ML100270762 - Forwards IE Insp Rept 50-286/75-15 on 750527-28.No noncompliance noted. (2 page(s), 6/3/1975)
- ML100270764 - IE Insp Rept 50-286/75-15 on 750527-28.No noncompliance noted.Major areas inspected:exam of repaired welds on containment personnel hatch & weld repair documentation. (7 page(s), 6/3/1975)
- ML100270765 - Forwards IE Insp Rept 50-286/75-14 on 750520-21.No noncompliance noted. (2 page(s), 6/4/1975)
- ML100270783 - IE Insp Rept 50-286/75-12 on 750505-08 & 21-23.No noncompliance noted.Major areas inspected:preparation test program status,evaluation of licensee completed test results & core loading prerequisite checklist. (8 page(s), 6/11/1975)
- ML100270761 - Ie Insp Rept 50-286/76-16 on 750602-03.No noncompliance noted.Major areas inspected:actions taken by licensee to determine & correct metal overlay cladding condition. (6 page(s), 6/12/1975)
- ML100270781 - Forwards IE Insp Rept 50-286/75-12 on 750505-08 & 21-23. No noncompliance noted. (2 page(s), 6/12/1975)
- ML100270760 - Forwards IE Insp Rept 50-286/75-16 on 7506023-03. No noncompliance noted. (2 page(s), 6/13/1975)
- ML100270757 - Corrects IE Insp Rept 50-286/75-16.Rept number should read IE Insp Rept 50-286/75-18. (1 page(s), 6/17/1975)
- ML100270755 - IE Insp Rept 50-286/75-19 on 750612 & 26-27.No noncompliance noted.Major areas inspected:extended const completion delay & evaluation of containment penetration & weld channel pressurization sys procedure. (9 page(s), 7/12/1975)
- ML100270751 - IE Insp Rept 50-286/75-20 on 750630 & 0701.No noncompliance noted.Major areas inspected:exam of mod procedures for installation of fire barriers & compartment boundary seals for safety-related cables. (10 page(s), 7/14/1975)
- ML100270753 - Forwards IE Insp Rept 50-286/75-19 on 750612 & 26 & 27. No noncompliance noted. (2 page(s), 7/14/1975)
- ML100270258 - Forwards IE Insp Rept 50-286/75-20 on 750630 & 0701.No noncompliance noted. (2 page(s), 7/15/1975)
- ML100270745 - Forwards IE Insp Rept 50-286/75-21 on 750730-31.No noncompliance noted. (2 page(s), 8/25/1975)
- ML100270748 - IE Insp Rept 50-286/75-21 on 750730-31.No noncompliance noted.Major areas inspected:steam generator cladding repair program & fire damaged insulation fabrication bldg. (8 page(s), 8/25/1975)
- ML100270742 - Forwards IE Insp Rept 50-286/75-22 on 750819-21.No noncompliance noted. (2 page(s), 8/28/1975)
- ML100270744 - IE Insp Rept 50-286/75-22 on 750819-21.No noncompliance noted.Major areas inspected:core loading prerequisite list, containment housekeeping & log keeping. (11 page(s), 8/28/1975)
- ML100270738 - Forwards IE Insp Rept 50-286/75-23 on 750909-11.No noncompliance noted.One item identified through internal audit program & reported in test results evaluation rept. (2 page(s), 9/25/1975)
- ML100270740 - IE Insp Rept 50-286/75-23 on 750909-11.No noncompliance noted.Major areas inspected:facility procedures, preoperational test results & hot functional test results. (13 page(s), 9/25/1975)
- ML100270734 - Forwards IE Insp Rept 50-286/75-24 on 750926.No noncompliance noted. (2 page(s), 10/3/1975)
- ML100270736 - IE Insp Rept 50-286/75-24 on 750926.No noncompliance noted. Major areas inspected:test of ultrasonic exam technique to be used for surveillance insp of steam generator cladding. (4 page(s), 10/3/1975)
- ML100270733 - IE Insp Rept 50-286/75-25 on 750925-26.Noncompliance noted: fuel storage area was not posted as containing radioactive matls. (7 page(s), 10/30/1975)
- ML100270721 - Forwards IE Insp Rept 50-286/75-27 on 751023-24.No noncompliance noted. (2 page(s), 11/11/1975)
- ML100270723 - IE Insp Rept 50-286/75-27 on 751111.No noncompliance noted. Major areas inspected:previous unresolved items,emergency diesel generator & readiness for fuel loading. (7 page(s), 11/11/1975)
- ML100270724 - Forwards IE Insp Rept 50-286/75-26 on 751021-23.Deficiency re accumulator injection test procedure corrected & no response required. (2 page(s), 11/11/1975)
- ML100270726 - IE Insp Rept 50-286/75-26 on 751021-23.Deficiency corrected. Major areas inspected:test results review,containment pressure relief & purge sys & previously identified items. (17 page(s), 11/11/1975)
- ML100270706 - IE Insp Rept 50-286/75-31 on 751114.No noncompliance noted. Major areas inspected:emergency diesel generators,hydraulic seismic restraints & electrical penetration seals. (7 page(s), 12/1/1975)
- ML100270704 - Forwards IE Insp Rept 50-286/75-31 on 751114.No noncompliance noted. (2 page(s), 12/2/1975)
- ML100270720 - IE Insp Rept 50-286/75-28 on 751030-31, 1105-07 & 09-14. No noncompliance noted.Major areas inspected:safety review committee & containment pressure relief & purge sys. (17 page(s), 12/3/1975)
- ML100270717 - Forwards IE Insp Rept 50-286/75-28 on 751030-31,1105-07 & 09-14.No noncompliance noted. (2 page(s), 12/4/1975)