- ML103481103 - FOIA/PA-2011-0026 Resp 1 - Final. (40 page(s), 12/13/2010)
- ML100151187 - CO Insp Rept 50-247/69-10 on 690930 & 1001-02.Major areas inspected:Westinghouse reorganization,status of pipe allegation investigation,control of electrical cable placement & review of field wiring. (12 page(s), 10/28/1964)
- ML100151396 - CO Insp Repts 50-213/66-02,50-219/66-01,50-220/66-02, 50-247/66-01 & 50-245/66-01 on 660202-04 re visit to C-E Chattanooga,TN plant.Obtained details re welding problems & witnessed vessel hydrostatic test. (16 page(s), 2/14/1966)
- ML100151391 - Forwards CO Insp Repts 50-213/66-02,50-219/66-01, 50-220/66-02,50-247/66-01 & 50-245/66-01 on 660202-04 re visit to C-E Chattanooga,TN plant. (2 page(s), 2/28/1966)
- ML100151387 - CO Insp Repts 50-219/66-03,50-220/66-04,50-245/66-02, 50-247/66-02 & 50-255/66-01 on 660510-22 re visit to C-E Chattanooga,TN plant.Reviewed status of several pressure vessels in varying stages of completion. (15 page(s), 5/23/1966)
- ML100151382 - Forwards CO Insp Repts 50-219/66-03,50-220/66-04, 50-245/66-02,50-247/66-02 & 50-255/66-01 on 660510-12 re visit to C-E plant in Chattanooga,TN. (1 page(s), 6/22/1966)
- ML100151376 - CO Insp Repts 50-237/66-05,50-245/66-04,50-247/66-03 & 50-263/66-01 on 661026-27 & 1102-03 re visits to B&W,C-E & Chicago Bridge & Iron CO. (12 page(s), 11/22/1966)
- ML100151371 - Forwards CO Vendor Insp Repts 50-237/66-05,50-245/66-04, 50-247/66-03 & 50-263/66-01 on 661026-27 & 1102-03 re visits to B&W,C-E & Chicago Bridge & Iron Co facilities. (3 page(s), 12/5/1966)
- ML100151361 - Forwards CO Insp Rept 50-247/67-01 on 670502. (1 page(s), 5/9/1967)
- ML100151366 - CO Insp Rept 50-247/67-01 on 670502.Major areas inspected: visit to Con Ed ofc to make initial contact w/mgt personnel. (6 page(s), 5/9/1967)
- ML100151352 - CO Insp Rept 50-247/67-03 on 670801,16 & 22.Major areas inspected:tour of const site,review of spec records & rept on QC review of dynamite blasting control problem. (10 page(s), 9/18/1967)
- ML100151346 - Forwards CO Insp Rept 50-247/67-03 on 6708601,16 & 22. (1 page(s), 9/28/1967)
- ML100151342 - CO Insp Rept 50-247/68-01 on 680227-28.Major areas inspected:proposed corrective actions to containment line bulge. (11 page(s), 4/1/1968)
- ML100151337 - Forwards CO Insp Rept 50-247/68-01 on 680227-28. (1 page(s), 4/4/1968)
- ML100151332 - CO Insp Rept 50-247/68-02 on 680422-24.Major areas inspected:visit to C-E plant to witness hydrostatic pressure test of reactor pressure vessel & to review fabrication records for vessel. (8 page(s), 5/22/1968)
- ML100151326 - Forwards CO Insp Rept 50-247/68-02 on 680422-24. (1 page(s), 6/4/1968)
- ML100151316 - Forwards CO Insp Rept 50-247/68-03 on 680314 & 0617-19. (2 page(s), 7/19/1968)
- ML100151321 - CO Insp Rept 50-247/68-03 on 680314 & 0617-19.Major areas inspected:review of QA measures relating to vendor fabricated components. (15 page(s), 7/19/1968)
- ML100151311 - CO Insp Rept 50-247/68-05 on 680927,30 & 1008.Major areas inspected:all phases of const. (13 page(s), 10/12/1968)
- ML100151305 - Forwards CO Insp Rept 50-247/68-05 on 680927,30 & 1008. (1 page(s), 10/17/1968)
- ML100151300 - CO Insp Rept 50-247/68-06 on 681120-21.Item of safety concern noted re Dravo Co. (10 page(s), 12/18/1968)
- ML100151294 - Forwards CO Insp Rept 50-247/68-06 on 681120-21. (1 page(s), 12/24/1968)
- ML100151289 - CO Insp Rept 50-247/69-02 on 690120 & 24.Noncompliance noted:nonconformance w/cadweld splice testing procedure as stated in FSAR. (17 page(s), 2/19/1969)
- ML100151283 - Forwards CO Insp Rept 50-247/69-02 on 690120 & 24. (2 page(s), 2/26/1969)
- ML100151277 - CO Insp Rept 50-242/69-03 on 690304-05.Major areas inspected:RCS field welding QC & progress in resolution of cause & implications of cracks in stainless steel safety injection pipe. (12 page(s), 3/25/1969)
- ML100151271 - Forwards CO Insp Rept 50-247/69-03 on 690304-05. (2 page(s), 4/3/1969)
- ML100270976 - CO Insp Repts 50-261/69-05,50-247/69-04,50-286/69-04, 50-250/69-06,50-251/69-03,50-244/69-06,50-266/69-04 & 50-301/69-03 on 690318-21.Noncompliance noted:open cans of low-hydrogen electrodes in stockroom & welding areas. (18 page(s), 4/22/1969)
- ML100151252 - CO Insp Rept 50-247/69-05 on 690422-23.Major areas inspected:addl info re general criticisms of piping supplier practices. (7 page(s), 5/27/1969)
- ML100151246 - Forwards CO Insp Rept 50-247/69-05 on 690422-23. (2 page(s), 6/3/1969)
- ML100151257 - Forwards Vendor CO Insp Repts 50-261/69-05,50-247/69-04, 50-286/69-04,50-250/69-06,50-251/69-03,50-244/69-06, 50-266/69-04 & 50-301/69-03 of Westinghouse Lester,PA plant on 690318-21. (1 page(s), 6/18/1969)
- ML100151263 - Vendor CO Insp Repts 50-261/69-05,50-247/69-04,50-286/69-04, 50-250/69-06,50-251/69-03,50-244/69-06,50-266/69-04 & 50-301/69-03 of Westinghouse Lester,PA plant on 690318-21. Major area inspected:steam generators. (9 page(s), 6/18/1969)
- ML100151241 - CO Insp Rept 50-247/69-06 on 690417,0515 & 0522-23.Major areas inspected:results of investigation re piping allegations. (22 page(s), 6/26/1969)
- ML100151234 - Forwards CO Insp Rept 50-247/69-06 on 690417,0515 & 0522-23. No nonconformance noted. (2 page(s), 7/11/1969)
- ML100151209 - CO Insp Rept 50-247/69-07 on 690617 & 0701-02.Major areas inspected:purchase specs for stainless steel valves & const site visit. (9 page(s), 8/19/1969)
- ML100151203 - Forwards CO Insp Rept 50-247/69-07 on 690617 & 0701-02. (1 page(s), 8/26/1969)
- ML100151198 - CO Insp Rept 50-247/69-08 on 690723-24.Major areas inspected:status of licensee investigation re previous pipe allegations. (7 page(s), 8/27/1969)
- ML100151192 - Forwards CO Insp Rept 50-247/69-08 on 690723-24. (2 page(s), 9/5/1969)
- ML100151172 - CO Insp Rept 50-247/69-09 on 690826-29 & 0910.Major areas inspected:Westinghouse proposed organization change,status of pipe allegation investigations & control of electrical cable placement. (26 page(s), 10/20/1969)
- ML100151166 - Forwards CO Insp Rept 50-247/69-09 on 690826-29 & 0910. (1 page(s), 10/24/1969)
- ML100151181 - Forwards CO Insp Rept 50-247/69-10 on 690930 & 1001-02. (2 page(s), 10/31/1969)
- ML100151160 - CO Insp Rept 50-247/69-11 on 691103 & 05-07.Major areas inspected:engineering ofcs in NY & const site re electrical separations & RCPB requirements. (12 page(s), 12/3/1969)
- ML100151153 - Forwards CO Insp Rept 50-247/69-11 on 691103 & 05-07. (2 page(s), 12/10/1969)
- ML100151141 - CO Insp Rept 247/69-12 on 691209-19.Major areas inspected: QC audit. (44 page(s), 2/3/1970)
- ML100151132 - Forwards CO Insp Rept 247/69-12 on 691209-19. (1 page(s), 2/20/1970)
- ML100151651 - CO Mgt Meeting Rept 50-247/70-01 on 700210.Major areas discussed:results of task force QC audit performed in Dec 1969. (6 page(s), 2/27/1970)
- ML100151662 - CO Insp Rept 50-247/70-02 on 700122,0206 & 11.Major areas inspected:status of pipe allegations program,preoperational testing,reactor pressure boundary requirements & Wedco organization. (14 page(s), 3/5/1970)
- ML100151645 - Forwards CO Mgt Meeting Rept 50-247/70-01 on 700210. (1 page(s), 3/6/1970)
- ML100151656 - Forwards CO Insp Rept 50-247/70-02 on 700122,0206 & 11. (1 page(s), 3/12/1970)
- ML100151679 - CO Insp Rept 50-247/70-03 on 700326-27.Major areas inspected:preoperational testing,electrical installation & followup on progress re previously identified questions. (11 page(s), 4/15/1970)
- ML100151673 - Forwards CO Insp Rept 50-247/70-03 on 700326-27. (1 page(s), 4/21/1970)
- ML100151640 - CO Insp Rept 50-247/70-04 on 700410 & 21-22.Major areas inspected:preoperational testing,organization,training, core internals fitups,electrical installation & Wedco takeover of site QC functions. (10 page(s), 5/18/1970)
- ML100151633 - Forwards CO Insp Rept 50-247/70-04 on 700410 & 21-22. (2 page(s), 5/26/1970)
- ML100151628 - CO Insp Rept 50-247/70-05 on 700506-08.Major areas inspected:preoperational testing,electrical installation, surface cleanup of piping sys,containment closure & discussions re previously identified problems. (9 page(s), 6/2/1970)
- ML100151621 - Forwards CO Insp Rept 50-247/70-05 on 700506-08. (1 page(s), 6/9/1970)
- ML100151616 - CO Insp Rept 50-247/70-06 on 700522,25-26,0603,11-12 & 15-16.Major areas inspected:preoperational testing, electrical installation,mechanical surface cleanup, containment closure & status of compliance to Table A. (13 page(s), 7/7/1970)
- ML100151610 - Forwards CO Insp Rept 50-247/70-06 on 700522,25-26,0603, 11-12 & 15-16. (1 page(s), 7/13/1970)
- ML100151605 - CO Insp Rept 50-247/70-07 on 700626,29 & 0708-09.Major areas inspected:witnessing RCS hydrostatic test,status of preoperational procedure preparation,mechanical surface cleanup & electrical installation. (14 page(s), 8/6/1970)
- ML100151596 - Forwards CO Insp Rept 50-247/70-07 on 700626,29 & 0708-09. (1 page(s), 8/20/1970)
- ML100151569 - CO Insp Rept 50-247/70-08 on 700730,0804-05,19 & 24-25.Major areas inspected:preoperational testing,mechanical sys cleanup,electrical surveillance & reactor pressure boundary conformance Table A. (19 page(s), 10/1/1970)
- ML100151561 - Forwards CO Insp Rept 50-247/70-80 on 700730,0804-05,19 & 24-25. (1 page(s), 10/14/1970)
- ML100151553 - CO Insp Rept 50-247/70-09 on 700908,23 & 25.No noncompliance noted.Major areas inspected:preoperational testing, mechanical sys clean up,electrical review,closure of containment & evaluation of pressurizer question. (12 page(s), 10/21/1970)
- ML100151544 - Forwards CO Insp Rept 50-247/70-09 on 700908,23 & 25. No noncompliance noted. (1 page(s), 10/28/1970)
- ML100151535 - CO Insp Rept 50-247/70-10 on 701007-08 & 13-14.Major areas inspected:preoperational testing,mechanical cleanup, electrical review,closure of containment,compliance w/Table A & evaluation of pressurizer question. (17 page(s), 11/23/1970)
- ML100151528 - Forwards CO Insp Rept 50-247/70-10 on 701007-08 & 13-14. No noncompliance noted. (1 page(s), 12/4/1970)
- ML100151513 - CO Meeting Rept 50-247/70-12 on 701202.Major areas discussed:Con Ed,Wedco & Westinghouse presentation of views re sample review of preoperational testing procedures & proposed guidance for testing. (7 page(s), 12/20/1970)
- ML100151524 - CO Insp Rept 50-247/70-11 on 701104-05 & 24-25.Major areas inspected:preoperational testing,mechanical sys cleanup, closure of containment,pipe hanger & support installation & electrical installation surveillance. (13 page(s), 12/30/1970)
- ML100151518 - Forwards CO Insp Rept 50-247/70-11 on 701104-05 & 24-25. (1 page(s), 1/15/1971)
- ML100151507 - Forwards CO Meeting Rept 50-247/70-12 on 701202. (1 page(s), 1/20/1971)
- ML100151495 - Forwards CO Insp Rept 50-247/71-01 on 701216 & 710106-07. No noncompliance noted. (2 page(s), 2/6/1971)
- ML100151502 - CO Insp Rept 50-247/71-01 on 701216 & 710106-07.Major areas inspected:preoperational testing,core loading,power ascension,mechanical sys cleanup & Con Ed response to questions raised at 701202 preoperational testing meeting. (17 page(s), 2/6/1971)
- ML100151490 - CO Insp Rept 50-247/71-02 on 710112,15,20-22,28-29 & 0203. No noncompliance noted:Major areas inspected:preoperational testing,power ascension program & operating procedures. Apparent deficiencies discussed w/mgt on 710112 & 15. (14 page(s), 2/17/1971)
- ML100151483 - Forwards CO Insp Rept 50-247/71-02 on 710112,15,20-22, 28-29 & 0203.No noncompliance noted. (2 page(s), 2/26/1971)
- ML100151472 - CO Insp Rept 50-247/71-04 on 710205 & 10-11.No noncompliance noted.Major areas inspected:preoperational testing,power ascension program & operating procedures. (9 page(s), 3/11/1971)
- ML100151464 - Forwards CO Insp Rept 50-247/81-04 on 710205 & 10-11. No noncompliance noted. (2 page(s), 3/18/1971)
- ML100151441 - CO Insp Rept 50-247/71-03 on 710120-21.Major areas inspected:pipe support sys & info pertaining to engineering criteria used in design,fabrication & installation of pipe support sys. (10 page(s), 3/23/1971)
- ML100151453 - Forwards CO Insp Rept 50-247/71-07 on 701207-10 & 710319 & 24-25.No noncompliance noted. (1 page(s), 4/20/1971)
- ML100151419 - CO Insp Rept 50-247/71-06 on 710217,0223-24,0305-06,08,10-12 & 15-16.Major areas inspected:preoperational testing,power ascension programs,operating procedure coverage,electrical jumper control & pipe support installation. (30 page(s), 4/26/1971)
- ML100151436 - Forwards CO Insp Rept 50-247/71-03 on 710120-21.No noncompliance noted. (2 page(s), 5/1/1971)
- ML100151407 - CO Insp Rept 50-247/81-08 on 710406-08 & 21-22.No noncompliance noted.Major areas inspected:preoperational testing,power ascension programs,pipe support installation, polar crane repairs & organizational coverage. (16 page(s), 5/17/1971)
- ML100151412 - Forwards CO Insp Rept 50-247/71-06 on 710217,23-24,0305-06, 08,10-12 & 15-16.No noncompliance noted. (2 page(s), 5/18/1971)
- ML100151431 - CO Insp Rept 50-247/71-05 on 710302-04.No noncompliance noted.Major areas inspected:radiation protection & chemistry programs,installation of waste disposal & radiation monitoring sys. (10 page(s), 5/21/1971)
- ML100151402 - Forwards CO Insp Rept 50-247/71-08 on 710406-08 & 21-22. No noncompliance noted. (1 page(s), 5/26/1971)
- ML100151425 - Forwards CO Insp Rept 50-247/71-05 on 710302-04.No noncompliance noted. (1 page(s), 6/2/1971)
- ML100190596 - CO Insp Rept 50-247/71-09 on 710504,05,14,26 & 27.No noncompliance noted.Major areas inspected:preoperational testing,power ascension programs,operating procedure & reactor internal preparation & pipe support installation. (17 page(s), 6/24/1971)
- ML100190597 - Forwards CO Inquiry Rept 50-247/71-02 for info. (1 page(s), 7/1/1971)
- ML100190599 - CO Inquiry Rept 50-247/71-02:on 710630,following info reported re steam generator cladding separation,personnel performed UT insps of tube sheet cladding & revealed cladding separated from base matl. (2 page(s), 7/1/1971)
- ML100190592 - Forwards CO Insp Rept 50-247/71-09 on 710504,05,14,26 & 27. No noncompliance noted. (2 page(s), 7/2/1971)
- ML100190579 - Forwards CO Insp Rept 50-247/71-10 on 710608,24,25 & 0712 for info.No noncompliance noted. (2 page(s), 8/6/1971)
- ML100190586 - CO Insp Rept 50-247/71-10 on 710708,24,25 & 0712.No noncompliance noted.Major areas inspected:unresolved items, installation of electrical fire stops & separation barriers, stack reinforcement records & reactor coolant pump seal. (10 page(s), 8/6/1971)
- ML100190565 - Forwards CO Meeting Rept 50-247/71-11 on 710708. (1 page(s), 8/19/1971)
- ML100190572 - CO Meeting Rept 50-247/71-11 on 710708 w/NY organizations re review of emergency planning. (5 page(s), 8/19/1971)
- ML100190556 - CO Inquiry Rept 50-247/71-03:on 710911,bowing of steam generator divider plates noted following heat treatment associated w/tube sheet clad repair.Damaged tube stubs to be ground smooth. (2 page(s), 9/14/1971)
- ML100190550 - Forwards CO Inquiry Rept 50-247/71-03 for info. (1 page(s), 9/15/1971)
- ML100190542 - Discusses CO Insp Rept 50-247/71-12 on 710812,17,18,25 & 0902 & forwards description of nonconformance. (2 page(s), 9/23/1971)
- ML100190545 - Description of nonconformance from insp on 710812,17,18,25 & 0902.Nonconformance noted:containment purge valves do not contain spring returns & improper welding procedure used. (2 page(s), 9/23/1971)
- ML100190541 - CO Insp Rept 50-247/71-12 of insp on 710812,17,18,25 & 0902. Noncompliance noted:butterfly valves isolating containment purge ducts equipped w/piston operators w/air reservoirs instead of spring returns. (13 page(s), 9/28/1971)
- ML100190539 - Forwards CO Insp Rept 50-247/71-12 from insp on 710812,17, 18,25 & 0902 for info. (2 page(s), 9/29/1971)
- ML100190533 - Forwards CO Inquiry Rept 50-247/71-05 for info.Inspector still at site reviewing primary sys cleanup records as prerequisite for fuel loading. (1 page(s), 10/14/1971)
- ML100190535 - CO Inquiry Rept 50-247/71-05:on 711005,primary sys cleaning examined.Installed temporary blocks in primary coolant pipes to maintain cleanliness.When removed,dirt,slag & dye penetrant found. (1 page(s), 10/14/1971)
- ML100190536 - Forwards CO Inquiry Rept 50-247/71-04 re ultrasonic findings of steam generators. (1 page(s), 10/14/1971)
- ML100190538 - CO Inquiry Rept 50-247/71-04:on 710928,insufficient info found re ultrasonic testing of steam generator circumferential welds (lower head to tube sheet) following repair of tube sheet cladding. (1 page(s), 10/14/1971)
- ML100190527 - Forwards CO Insp Rept 50-247/71-13 for info.Circumferential weld of steam generator 21 still unresolved. (2 page(s), 11/19/1971)
- ML100190529 - CO Insp Rept 50-247/71-13 during Sept & Oct 1971.Completed all items for issuance of core loading subcritical testing except for pipe insulation,FSAR changes resolution & unresolved circumferential weld of steam generator 21. (26 page(s), 11/19/1971)
- ML100190518 - CO Insp Rept 50-247/71-16 on 711124.Major areas inspected: program & procedures for cleanup,repair & reinstallation of electrical cabling & equipment damaged or destroyed during 711104 fire. (7 page(s), 12/1/1971)
- ML100190519 - Discusses CO Insp Rept 50-247/71-16 on 711124.Tests will be performed on PVC conductor insulation damaged,resistance & mechanical strength tests for hot spots will be performed & temp calculated for repair. (2 page(s), 12/7/1971)
- ML100190523 - Forwards CO Insp Rept 50-247/71-14 on 711024 & 28 for info. (1 page(s), 12/8/1971)
- ML100190526 - CO Insp Rept 50-247/71-14 on 711024 & 28.Areas inspected: core loading for accordance w/procedures. (6 page(s), 12/8/1971)
- ML100190516 - Forwards CO Insp Rept 50-247/71-16 on 711124. (1 page(s), 12/15/1971)
- ML100190510 - Refers to CO Insp Rept 50-247/71-17 on 711220 & forwards description of nonconformance. (2 page(s), 1/5/1972)
- ML100190509 - CO Insp Rept 50-247/71-17 on 711220.Major areas inspected: evaluation of WEDCO repair procedure for safety injection sys accumulator check valves. (11 page(s), 1/10/1972)
- ML100190507 - Forwards CO Insp Rept 50-247/71-17 on 711220 for info. (1 page(s), 1/11/1972)
- ML100190521 - Forwards CO Insp Rept 50-247/71-15 on 711104-06 & 11-12 re 711104 fire at plant.Encls withheld (ref 10CFR2.790). (1 page(s), 1/14/1972)
- ML100190506 - CO Insp Rept 50-247/72-01 on 711229-30 & 720103.No noncompliance noted.Major areas inspected:mgt interview & prototype splices. (8 page(s), 1/21/1972)
- ML100190504 - Forwards CO Insp Rept 50-247/72-01 on 711229-30 & 720103.No noncompliance noted,however,splicing matl found unacceptable. (1 page(s), 1/26/1972)
- ML100190494 - CO Insp Rept 50-247/72-02 on 711213 & 720110.No noncompliance noted.Major areas inspected:mgt interviews, fire protection & prevention,organization,subcritical testing & power ascension program & surveillance testing. (12 page(s), 2/2/1972)
- ML093521550 - Forwards CO Inquiry Rept 50-247/72-03. (1 page(s), 2/4/1972)
- ML093521553 - CO Inquiry Rept 50-247/72-03:in 720203 telcon,A Zallnick inquired re mod of AEC design criteria in accordance w/info in Reactor Const Experience Bulletin 72-1," Fire at Nuclear Power Plant Under Const." (2 page(s), 2/4/1972)
- ML100190492 - Forwards CO Insp Rept 50-247/72-02 on 711213 & 720110 for info re items of concern for fire prevention & protection. No noncompliance noted. (1 page(s), 2/7/1972)
- ML100190495 - Forwards CO Inquiry Rept 50-247/72-04 for info. (1 page(s), 2/7/1972)
- ML100190497 - CO Inquiry Rept 50-247/72-04:on 720203 or 04,condensate storage tank failed.Investigation revealed eight anchor bolt fractures & failure of fillet weld.Relationship of two not yet revealed.Cables installed to prevent tank collapse. (1 page(s), 2/7/1972)
- ML100190488 - Forwards CO Inquiry Rept 50-247/72-05 for info. (1 page(s), 2/18/1972)
- ML100190490 - CO Inquiry Rept 50-247/72-05:on 720216 & 17,primary sys pressure surge exceeding Tech Specs limits of 650-psig was experienced.Initiated investigation to determine cause & prevention of occurrence.No apparent damage. (1 page(s), 2/18/1972)
- ML100190484 - Forwards CO Inquiry Rept 50-247/72-06 for info. (1 page(s), 2/25/1972)
- ML100190486 - CO Inquiry Rept 50-247/72-06:on 720222,RHR sys heat exchangers failed.Sys isolated & reactor coolant pump operation discontinued.Investigation continuing. (1 page(s), 2/25/1972)
- ML100190482 - CO Inquiry Rept 50-247/72-07:on 720308,primary sys pressure surge of 630-psig occurred exceeding Tech Specs limit. Increased letdown flow & pressure spike terminated.No apparent damage.Investigation continuing. (1 page(s), 3/10/1972)
- ML100190474 - Discusses CO Insp Rept 50-247/72-03 on 720214,17 & 18 & forwards notice of noncompliance. (2 page(s), 3/15/1972)
- ML100190473 - CO Insp Rept 50-247/72-03 on 720214,17 & 18.Noncompliance noted:RCS pressure surges exceeded Tech Specs at 650-psig when temp less than 220 F. (9 page(s), 3/17/1972)
- ML100190477 - Forwards CO Inquiry Rept 50-247/72-09 on 720228 for info. (1 page(s), 3/17/1972)
- ML100190479 - CO Inquiry Rept 50-247/72-09:on 720228,arsonist indicted in second degree for malicious mischief in excess of $1500. Arsonist still in psychiatric wing of hospital & unsure of trial date. (1 page(s), 3/17/1972)
- ML100190471 - Forwards CO Insp Rept 50-247/72-03 on 720214,17 & 18 for info & notice of violation. (1 page(s), 3/20/1972)
- ML100190470 - CO Insp Rept 50-247/72-04 on 720303.No noncompliance noted. Major areas inspected:720203 failure of condensate storage tank & cable damage repair during fire,procedure & record exams,personnel interviews & inspector observations. (7 page(s), 3/22/1972)
- ML100190466 - Discusses CO Insp Rept 50-247/72-04 on 720303.No noncompliance noted.Repts in preparation include tank failure,tie down bolt matl overstressing,tabulation of equipment testing & insulating matl fire resistance. (2 page(s), 4/5/1972)
- ML100190469 - Forwards CO Insp Rept 50-247/72-04 on 720303.No noncompliance noted. (1 page(s), 4/5/1972)
- ML100190459 - Forwards CO Inquiry Rept 50-247/72-11 for info. (1 page(s), 4/6/1972)
- ML100190456 - Forwards CO Inquiry Rept 50-247/72-12 for info. (1 page(s), 4/7/1972)
- ML100190458 - CO Inquiry Rept 50-247/72-12 re "Fish Kill Resulting From Testing of Circulating Water Sys." Util stated that circulating pumps not operating since initial order received.Conditions under evaluation. (5 page(s), 4/7/1972)
- ML100190461 - CO Inquiry Rept 50-247/72-11:on 720406,primary sys pressure surge caused by operator error closing letdown valve.Pressure increase terminated when letdown valve opened.No damage reported. (1 page(s), 4/7/1972)
- ML100190463 - Forwards CO Inquiry Rept 50-247/72-10 for info. (2 page(s), 4/11/1972)
- ML100190465 - CO Inquiry Rept 50-247/72-10 on 720314-15 re potential for catastrophic failure of main steam safety valves. Calculations indicate unsatisfactory safety margin if full blow occurs.Initiated discharge piping mods for valves. (4 page(s), 4/11/1972)
- ML100190455 - Discusses CO Insp Rept 50-247/72-05 on 720314-15,0410 & 14. No noncompliance noted. (2 page(s), 5/4/1972)
- ML100190454 - CO Insp Rept 50-247/72-05 on 720314-15,0410 & 14.No noncompliance noted.Major areas inspected:test programs re 711104 fire,power ascension program,pipe hanger & restraint installation & pipe thermal expansion. (16 page(s), 5/8/1972)
- ML100190452 - Forwards CO Insp Rept 50-247/72-05 for info. (2 page(s), 5/10/1972)
- ML100190450 - CO Inquiry Rept 50-247/72-13 on 720429 re control rod malfunction during hot condition preoperational rod drop testing.Investigation continuing. (2 page(s), 5/22/1972)
- ML100190448 - Forwards CO Inquiry Rept 50-247/72-13 for info. (1 page(s), 5/23/1972)
- ML103481101 - Study of Potential Concrete Reinforcement Corrosion on the Structural Integrity of the Spent Fuel Pit Report," 1487203-R-001, Revision 0. (88 page(s), 9/30/2005)
- ML103481102 - Study of the Unit 2 Spent Fuel Pit Permeability," Report No. 1464385-R-004 Revision: Draft B. (23 page(s), 9/16/2005)