Skip to main content

Inspection Manual Chapters

The Inspection Manual Chapters highlighted in blue have an effective date that is different from the issue date.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Area

Chapter

Title

Issue Date

CN Number

Word

OpESS

IMC

Manual Chapter

IMC

0040

Preparation, Revision, Issuance, and Ongoing Oversight of NRC Inspection Manual Documents

01/17/23

23-001

.docx

 

IMC

0040 App A

Microsoft Word Formatting Directions and Guidance for Inspection Manual Documents

08/26/25

25-028

.docx

 

IMC

0102

Oversight and Objectivity of Inspectors and Examiners at Licensee Facilities

03/18/25

25-004

.docx

 

IMC

0111

Region I Monitoring Activities for the Department of Energy West Valley Demonstration Project

09/09/20

20-041

.docx

 

IMC

0301

Coordination of NRC Visits to Commercial Reactor Sites

08/24/01

01-016

.doc

 

IMC

0303

Health Physics Positions (HPPOS)

07/10/19

19-023

.docx

 

IMC

0305

Operating Reactor Assessment Program

10/25/24

24-032

.docx

 

IMC

0306

Planning, Scheduling, Tracking and Reporting of the Reactor Oversight Process (ROP)

05/10/24

24-014

.docx

 

IMC

0307

Reactor Oversight Process Self-Assessment Program

05/03/22

22-009

.docx

 

IMC

0307 App A

Reactor Oversight Process Self-Assessment Metrics and Data Trending

06/14/23

23-016

.docx

 

IMC

0307 App B

Reactor Oversight Process Self-Assessment Baseline Inspection Program Monitoring and Comprehensive Review

05/13/25

25-011

.docx

 

IMC

0307 App C

Reactor Oversight Process (ROP) Self-Assessment ROP Implementation Audit

03/24/23

23-009

.docx

 

IMC

0307 App D

Resident Inspector Retention and Recruitment Program Monitoring and Assessment

02/12/25

25-002

.docx

 

IMC

0308

Reactor Oversight Process Basis Document

12/12/24

24-042

.docx

 

IMC

0308 Att 1

Technical Basis for Performance Indicators

12/12/24

24-042

.docx

 

IMC

0308 Att 2

Technical Basis for Inspection Program

06/20/25

25-017

.docx

 

IMC

0308 Att 3

Technical Basis for Significance Determination Process

12/16/24

24-044

.docx

 

IMC

0308 Att 3, App A

Technical Basis for the At-Power Significance Determination Process

11/30/20

20-066

.doc

 

IMC

0308 Att 3, App B

Technical Basis for Emergency Preparedness Significance Determination Process

12/19/12

12-029

.docx

 

IMC

0308 Att 3, App C

Technical Basis for Occupational Radiation Safety Significance Determination Process

07/28/05

05-022

.doc

 

IMC

0308 Att 3, App D

Technical Basis for Public Radiation Safety Significance Determination Process

09/24/21

21-032

.docx

 

IMC

0308 Att 3, App E
 

Technical Basis for the Baseline Security Significance Determination Process – Effective Date March 1, 2022

01/31/22

22-002

.docx

 

IMC

0308 Att 3, App F

Technical Basis Fire Protection Significance Determination Process (Supplemental Guidance for Implementing IMC 0609 Appendix F) At Power Operations

09/05/24

24-024

.docx

 

IMC

0308 Att 3, App G

Technical Basis for Shutdown Operations Significance Determination Process

01/11/22

22-001

.docx

 

IMC

0308 Att 3, App H

Containment Integrity Significance Determination Process Technical Basis

10/27/20

20-056

.docx

 

IMC

0308 Att 3, App I

Technical Basis for Licensed Operator Requalification Significance Determination Process

07/10/25

25-025

.docx

 

IMC

0308 Att 3, App J

Technical Basis for Steam Generator Tube Integrity Findings

02/02/24

24-004

.docx

 

IMC

0308 Att 3, App K

Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process

10/25/24

24-031

.docx

 

IMC

0308 Att 3, App L

Technical Basis for Extensive Damage Mitigation Guidelines Significant Determination Process

12/07/21

21-039

.docx

 

IMC

0308 Att 3, App M

Technical Basis for the Significance Determination Process (SDP) Using Qualitative Criteria

10/23/24

24-030

.docx

 

IMC

0308 Att 4

Technical Basis for Assessment

09/08/23

23-027

.docx

 

IMC

0308 Att 5

Technical Basis for Enforcement

11/04/20

20-057

.docx

 

IMC

0308 Att 6

Basis Document for Security Cornerstone of the Reactor Oversight Process

11/09/20

20-061

.docx

 

IMC

0308 Att 6

Basis Document for Security Cornerstone of the Reactor Oversight Process – Effective January 1, 2026

09/24/25

25-031

.docx

 

IMC

0309

Reactive Inspection Decision Basis for Power Reactors

05/28/25

25-015

.docx

 

IMC

0310

Aspects Within the Cross-Cutting Areas

02/25/19

19-008

.docx

 

IMC

0312

Technical Assistance for Radiation Safety Inspections at Nuclear Fuel Cycle Facilities and Materials Licensees' Sites

06/06/02

02-023

.doc

 

IMC

0326

Operability Determinations

09/30/19

19-032

.docx

FY2012-02
Rev 1

IMC

0327

Steam Generator Tube Primary-to-Secondary Leakage

07/14/23

23-020

.docx

 

IMC

0330

Guidance for NRC Review of Licensee Draft Documents

07/8/96

96-015

  

IMC

0335

Changes, Tests, and Experiments

01/29/21

21-007

.docx

 

IMC

0350

Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns

10/16/23

23-030

.docx

 

IMC

0375

Implementation of the Reactor Oversight Process at Reactor Facilities in an Extended Shutdown Condition for Reasons Not Related to Performance

08/06/25

25-027

.docx

 

IMC

0608

Performance Indicator Program

12/12/24

24-042

.docx

 

IMC

0609

Significance Determination Process

12/16/24

24-044

.docx

 

IMC

0609 Att 1

Significance and Enforcement Review Panel (SERP) Process

12/16/24

24-044

.docx

 

IMC

0609 Att 2

Process for Appealing NRC Characterization of Inspection Findings (SDP Appeal Process)

11/22/24

24-037

.docx

 

IMC

0609 Att 3

Senior Reactor Analyst and Risk Analyst Support Expectations

10/09/20

20-050

.docx

 

IMC

0609 Att 4

Initial Characterization of Findings

10/25/24

24-031

.docx

 

IMC

0609 Att 5

Inspection Finding Review Board

12/15/23

23-037

.docx

 

IMC

0609 App A

The Significance Determination Process for Findings At-Power

11/30/20

20-066

.docx

 

IMC

0609 App B

Emergency Preparedness Significance Determination Process

09/22/15

15-017

.docx

 

IMC

0609 App C

Occupational Radiation Safety Significance Determination Process

08/19/08

08-024

.doc

 

IMC

0609 App D

Public Radiation Safety Significance Determination Process

09/24/21

21-032

.docx

 

IMC

0609 App E

Security Significance Determination Process for Power Reactors

04/02/21

21-018

.doc

 

IMC

0609 App E Part I

Baseline Security Significance Determination Process For Power Reactors

11/08/22

22-025

.docx

 

IMC

0609 App E Part II
OUO-SRI

Force on Force Significance Determination Process

01/15/14

14-002

  

IMC

0609 App E Part II

Force on Force Significance Determination Process – Effective January 1, 2026

09/24/25

25-031

.docx

 

IMC

0609 App E Part III

Construction Fitness-For-Duty Significance Determination Process for New Reactors

07/26/18

18-021

.docx

 

IMC

0609 App E Part IV
OUO-SRI

Cybersecurity Significance Determination Process for Power Reactors

02/19/25

25-003

  

IMC

0609 App F

Fire Protection Significance Determination Process 

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 1

Fire Protection Significance Determination Process Worksheets

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 2

Degradation Rating Guidance

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 3

Guidance for Identifying Credible Fire Scenarios

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 4

Guidance for Determining Fire Ignition Frequency

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 5

Characterizing Fire Ignition Sources 

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 6

Guidance for the Identification of Targets and Their Ignition and Damage Criteria

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 7

Guidance for Fire Non-Suppression Probability Analysis

09/05/24

24-024

.docx

 

IMC

0609 App F, Att 8

Tables and Plots Supporting the Phase 2 Risk Quantification

09/05/24

24-024

.docx

 

IMC

0609 App G

Shutdown Operations Significance Determination Process

01/08/20

20-004

.docx

 

IMC

0609 App G, Att 1

Shutdown Operations Significance Determination Process Phase 1 Initial Screening and Characterization of Findings

05/20/22

22-010

.docx

 

IMC

0609 App G, Att 2

Phase 2 Significance Determination Process Template for PWR During Shutdown

01/08/20

20-004

.docx

 

IMC

0609 App G, Att 3

Phase 2 Significance Determination Process Template for BWR During Shutdown

01/08/20

20-004

.docx

 

IMC

0609 App H

Containment Integrity Significance Determination Process

03/23/20

20-017

.docx

 

IMC

0609 App I

Licensed Operator Requalification Program Significance Determination Process

01/10/19

19-001

.docx

 

IMC

0609 App J

Steam Generator Tube Integrity Findings Significance Determination Process

10/16/20

20-051

.docx

 

IMC

0609 App K

Maintenance Risk Assessment and Risk Management Significance Determination Process

10/25/24

24-031

.docx

 

IMC

0609 App L

Extensive Damage Mitigation Guidelines Significance Determination Process

12/07/21

21-039

.docx

 

IMC

0609 App M

Significance Determination Process Using Qualitative Criteria

10/24/24

24-030

.docx

 

IMC

0610

Nuclear Material Safety and Safeguards Inspection Reports

06/27/25

25-023

.docx

 

IMC

0610 App G

Screening and Documentation of Very Low Safety Significance Issue Resolution Process

06/27/25

25-023

.docx

 

IMC

0610 Att 2

Nuclear Materials Inspection Documentation

06/27/25

25-023

.docx

 

IMC

0610 Exh 1

Inspection Report Templates

06/27/25

25-023

.docx

 

IMC

0610 Exh 2

Standard NMSS Inspection Report Outline

06/27/25

25-023

.docx

 

IMC

0610 Exh 3

Inspection Report Documentation Matrix

06/27/25

25-023

.docx

 

IMC

0611

Power Reactor Inspection Reports

05/28/25

25-015

.docx

 

IMC

0611 Exh 1

Standard Reactor Inspection Report Outline

12/29/22

22-029

.docx

 

IMC

0611 Exh 2

Inspection Report Documentation Matrix

12/29/22

22-029

.docx

 

IMC

0611 Exh 4

Inspection Report Cover Letter Templates

10/09/19

19-033

.docx

 

IMC

0611 App A

Acronyms Used in Inspection Reports

12/29/22

22-029

.docx

 

IMC

0611 App C

Documenting Supplemental Inspections

10/21/20

20-054

.docx

 

IMC

0611 App D

Guidance for Problem Identification and Resolution Inspection Reports

12/06/24

24-039

.docx

 

IMC

0611 Att 2

Guidance for Reactive Inspection Reports

06/07/22

22-012

.docx

 

IMC

0612

Issue Screening

05/28/25

25-015

.docx

 

IMC

0612 App B

Issue Screening Directions

05/28/25

25-015

.docx

 

IMC

0612 App E

Examples of Minor Issues

10/26/23

23-031

.docx

 

IMC

0612 App G

Emergency Planning Cornerstone - Specific Supplemental Guidance for Appendix B Screening Figures 1 and 2

02/24/21

21-010

.docx

 

IMC

0613

Power Reactor Construction Inspection Reports

11/04/20

20-057

.docx

 

IMC

0615

Non-Power Production and Utilization Facility Inspection Reports

10/17/24

24-029

.docx

 

IMC

0616

Fuel Cycle Safety and Safeguards Inspection Reports

06/23/25

25-019

.docx

 

IMC

0616 App B

Examples of Minor Violations

10/04/22

22-020

.docx

 

IMC

0617

Vendor And Quality Assurance Implementation Inspection Reports

07/03/24

24-019

.docx

 

IMC

0620

Inspection Documents and Records

07/09/21

21-023

.docx

 

IMC

0730

Generic Communications Regarding Materials and Fuel Cycle Issues

03/21/08

08-011

.doc

 

IMC

0801

Inspection Program Feedback Process

03/29/23

23-010

.docx

 

IMC

1007

Interfacing Activities Between Regional Offices of NRC and OSHA

09/01/22

22-018

.docx

 

IMC

1120

Preliminary Notifications

01/05/21

21-001

.docx

 

IMC

1201

Conduct of Employees

03/18/25

25-004

.docx

 

IMC

1202

Resident Inspector Site Turnover

03/18/25

25-004

.docx

 

IMC

1230

Quality Assurance Program for Radiological Confirmatory Measurements

10/01/83

83-012

  

IMC

1232

Collection, Preparation, and Shipment of Independent Measurement Samples

11/18/86

86-052

  

IMC

1240

Unescorted Access at Commercial Nuclear Power Plants, Selected Fuel Cycle Facilities, Independent Spent Fuel Storage Installations or Non-Power Production and Utilization Facilities

10/16/23

23-030

.docx

 

IMC

1245

Qualification Program for Reactor Inspectors

06/18/25

25-016

.docx

 

IMC

1245 Att 1

General Overview of the Inspector Training and Qualification Program

05/15/23

23-013

.docx

 

IMC

1245 Att 2

Inspector Competencies

01/23/23

23-002

.docx

 

IMC

1245 Att 3

General Overview of the Resident Inspector Training and Qualification Program

06/18/25

25-016

.docx

 

IMC

1245 App A

Basic-Level Training and Qualification Journal

04/16/25

25-007

.docx

 

IMC

1245 App B

General Proficiency-Level Training and Qualification Journal

04/16/25

25-007

.docx

 

IMC

1245 App C1

Reactor Operations Inspector Technical Proficiency Training and Qualification Journal

06/14/23

23-016

.docx

 

IMC

1245 App C2

Reactor Engineering Inspector Technical Proficiency Training and Qualification Journal

06/16/22

22-013

.docx

 

IMC

1245 App C3

Health Physics Inspector Technical Proficiency Training and Qualification Journal

02/20/17

17-004

.docx

 

IMC

1245 App C4

Reactor Security Inspector Technical Proficiency Training and Qualification Journal

12/16/22

22-027

.docx

 

IMC

1245 App C5

Non-Power Production and Utilization Facility Technical Proficiency Training and Qualification Journal

09/22/25

25-030

.docx

 

IMC

1245 App C6

Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal

08/23/18

18-029

.docx

 

IMC

1245 App C7

Fire Protection Inspector Technical Proficiency Training and Qualification Journal

04/11/23

23-011

.docx

 

IMC

1245 App C8

Vendor Inspector Technical Proficiency Training and Qualification Journal

03/27/20

20-018

.docx

 

IMC

1245 App C9

Senior Reactor Analyst Training and Qualification Program

06/14/23

23-016

.docx

 

IMC

1245 App C10

Operator Licensing (OL) Examiner Technical Proficiency Training and Qualification Journal

08/28/23

23-026

.docx

 

IMC

1245 App C11

Security Risk Analyst Technical Proficiency Training and Qualification Journal

09/08/23

23-027

.docx

 

IMC

1245 App C12

Safety Culture Assessor Training and Qualification Journal

05/21/25

25-012

.docx

 

IMC

1245 App C13
OUO-SRI

Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal

08/08/13

13-016

  

IMC

1245 App C14

Cybersecurity Inspector Technical Proficiency Training and Qualification Journal

10/13/22

22-022

.docx

 

IMC

1245 App C15

Construction Inspector Technical Proficiency Training and Qualification Journal

04/22/21

21-019

.docx

 

IMC

1245 App C16

Research and Test Reactor Operator Licensing Examiner Technical Proficiency Training and Qualification Journal

09/09/21

21-030

.docx

 

IMC

1245 App C17

Resident Inspector Technical Proficiency Training and Qualification Journal and Instructions for Completion

06/18/25

25-016

.docx

 

IMC

1245 App D1

Maintaining Qualifications

06/18/25

25-016

.docx

 

IMC

1245 App D2

Inservice Inspection Advanced-Level Training

04/11/23

23-011

.docx

 

IMC

1245 App D3

Fire Protection Advanced-Level Training

04/11/23

23-011

.docx

 

IMC

1245 App D4

Electrical Advanced Level Training and Qualification Journal

11/04/20

20-057

.docx

 

IMC

1246

Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area

10/26/11

11-022

.docx

 

IMC

1246A

Training Activities for Staff in the Nuclear Material Safety and Safeguards Program Area

10/26/11

11-022

.docx

 

IMC

1246 App B1

Training Requirements and Qualification Journal for Spent Fuel Storage and Transportation Project Manager and Technical Reviewer

10/26/11

11-022

.docx

 

IMC

1246 App B2

Training Requirements and Qualification Journal for Storage and Transportation Inspector

10/02/23

23-029

.docx

 

IMC

1246 App B3

Training Requirements and Qualification Journal for Independent Spent Fuel Storage Installation Inspector

10/16/24

24-028

.docx

 

IMC

1246 App B04
OUO-SRI

Independent Spent Fuel Storage Installation Security Inspector Technical Proficiency Training and Qualification Journal

08/08/13

13-016

  

IMC

1246C01

Training Requirements and Qualification Journal for Fuel Cycle Technical Reviewer

10/26/11

11-022

.docx

 

IMC

1246C02

Training Requirements and Qualification Journal for Fuel Cycle Project Manager

10/26/11

11-022

.docx

 

IMC

1246C03

Training Requirements and Qualification Journal for Material Control and Accounting License Reviewer

10/26/11

11-022

.docx

 

IMC

1246C04

Training Requirements and Qualification Journal for Fuel Cycle Safeguards - Physical Security Inspector

10/26/11

11-022

.docx

 

IMC

1246C05

Training Requirements and Qualification Journal for International Safeguards Analysts, Nuclear Materials Management and Safeguards System (NMMSS) Analysts, and Import/Export Analysts

06/27/16

16-014

.docx

 

IMC

1246D01

Training Requirements and Qualification Journal for High Level Waste Repository License Technical Reviewer

10/26/11

11-022

.docx

 

IMC

1246D02

Training Requirements and Qualification Journal for high Level Waste Repository Inspector

10/26/11

11-022

.docx

 

IMC

1247

Qualification Program for Fuel Facility Inspectors in the Nuclear Material Safety and Safeguards Program Area

07/25/25

25-026

.docx

 

IMC

1247 App A

Basic-Level Training and Certification Journal Fuel Facility Inspector

07/01/24

24-018

.docx

 

IMC

1247 App B

General Proficiency Level Training and Qualification Journal

07/01/24

24-018

.docx

 

IMC

1247 App C1

Fuel Facility Operations Inspector Technical Proficiency Training and Qualification Journal

07/01/24

24-018

.docx

 

IMC

1247 App C2

Fuel Facility Health Physics Inspector Technical Proficiency Training and Qualification Journal

07/01/24

24-018

.docx

 

IMC

1247 App C3

Fuel Facility Emergency Preparedness Inspector Technical Proficiency Training and Qualification Journal

07/24/24

24-021

.docx

 

IMC

1247 App C4

Fuel Facility Physical Security Inspector Technical Proficiency Training and Qualification

05/01/25

25-010

.docx

 

IMC

1247 App C5

Fuel Facility Material Control & Accounting Inspector Technical Proficiency Training and Qualification Journal

11/07/22

22-024

.docx

 

IMC

1247 App C6

Fuel Facility Criticality Safety Inspector Technical Proficiency Training and Qualification Journal

07/24/24

24-021

.docx

 

IMC

1247 App D1
OUO-SRI

Information Security Inspector Specialized Qualification Program Training and Qualification Journal

10/28/14

14-026

  

IMC

1248

Qualifications Programs for Federal and State Materials and Environmental Management Programs

04/19/13

13-011

.docx

 

IMC

1248 App A

Materials Health Physics License Reviewer Qualification Journal

04/19/13

13-011

.docx

 

IMC

1248 App B

Materials Health Physics Inspector Qualification Journal

04/19/13

13-011

.docx

 

IMC

1248 App C

Training Requirements and Qualification Journal for Materials Exempt Distribution License Reviewers

04/19/13

13-011

.docx

 

IMC

1248 App D

Training Requirements and Qualification Journal for Byproduct Material Sealed Source Device Reviewers

04/19/13

13-011

.docx

 

IMC

1248 App E

Training Requirements and Qualification Journal for Division of Waste Management Inspector and License Reviewers

04/19/13

13-011

.docx

 

IMC

1248 App F

Training Requirements and Qualification Journal for Decommissioning Inspectors

03/03/22

22-005

.docx

 

IMC

1248 App G

Training Requirements and Qualification Journal for Decommissioning Project Managers/Technical Reviewers

01/13/16

16-002

.docx

 

IMC

1248 App H

Training Requirements and Qualification Journal for Uranium Recovery Inspectors

04/19/13

13-011

.docx

 

IMC

1248 App I

Training Requirements and Qualification Journal for Uranium Recovery Project Managers/Technical Reviewers

07/02/19

19-021

.docx

 

IMC

1301

Response to Radioactive Material Incidents That Do Not Require Activation of the NRC Incident Response Plan

10/20/00

00-022

.doc

 

IMC

1302

Follow-up Actions and Action Levels for Radiation Exposures Associated with Materials Incidents Involving Members of the Public

07/14/05

05-019

.doc

 

IMC

1303

Requesting Emergency Acceptance of Radioactive Material by the U.S. Department of Energy (DOE)

11/29/07

07-037

.doc

 

IMC

1330

Response to Transportation Accidents Involving Radioactive Materials

10/06/04

04-025

.doc

 

IMC

1360

Use of Physician and Scientific Consultants in the Medical Consultant Program

11/02/06

06-033

.doc

 

IMC

1415

State Contracts Program for Environmental Monitoring

06/28/91

91-009

  

IMC

1601

Communication and Coordination Protocol for Determining the Status of Offsite Emergency Preparedness

11/22/24

24-037

.docx

 

IMC

2200
OUO-SRI

Security Inspection Program for Construction

09/07/12

12-020

  

IMC

2200 App A

Security Construction Inspection Program

01/29/19

19-004

.docx

 

IMC

2201

Security Inspection Program for Operating Commercial Nuclear Power Reactors

12/06/23

23-035

.docx

 

IMC

2201 App A

Security Baseline Inspection Program

12/13/24

24-043

.docx

 

IMC

2201 App B

Supplemental Inspection Program

12/06/23

23-035

.docx

 

IMC

2201 App C

Generic, Special, and Infrequent Inspections

12/13/24

24-043

.docx

 

IMC

2201 App D

Facility Status Reviews for Security and Safeguards Inspection Program

12/06/23

23-035

.docx

 

IMC

2202

Security Inspection Program For Decommissioning Nuclear Power Reactors

07/28/20

20-035

.docx

 

IMC

2202 App A

Security Core Inspection Program

07/28/20

20-035

.doc

 

IMC

2202 App B

Security Discretionary Inspection Program

07/28/20

20-035

.doc

 

IMC

2300

Yucca Mountain Inspection Program: License Application Review Period

09/11/08

08-026

.doc

 

IMC

2401

Near-Surface Low-Level Radioactive Waste Disposal Facility Inspection Program

11/27/01

01-028

.doc

 

IMC

2410

Conduct of Observation Audits

07/12/00

00-012

  

IMC

2501

Inspection Activities Following Acceptance of a Docketed Application for a Permit, License, or NRC Authorization

05/01/25

25-010

.docx

 

IMC

2503

Construction Inspection Program: Inspections of Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) Related Work

10/06/20

20-048

.docx

 

IMC

2504

Construction Inspection Program: Inspection of Construction and Operational Programs

12/15/20

20-072

.docx

 

IMC

2505

Periodic Assessment of Construction Inspection Program Results

02/18/22

22-004

.docx

 

IMC

2506

Construction Reactor Oversight Process General Guidance and Basis Document

11/25/20

20-065

.docx

 

IMC

2507

Vendor Inspections

05/18/23

23-014

.docx

 

IMC

2508

Construction Inspection Program: Design Certification

05/03/22

22-009

.docx

 

IMC

2514

AP 1000 Reactor Inspection Program - Startup Testing Phase

01/12/21

21-003

.docx

 

IMC

2515

Light Water Reactor Inspection Program Operations Phase

06/20/25

25-017

.docx

 

IMC

2515 App A

Risk-Informed Baseline Inspection Program

06/20/25

25-017

.docx

 

IMC

2515 App B

Supplemental Inspection Program

09/28/22

22-019

.docx

 

IMC

2515 App C

Special and Infrequently Performed Inspections

06/26/23

23-018

.docx

 

IMC

2515 App D

Plant Status

06/20/25

25-017

.docx

 

IMC

2515 App E

Inspection Program Modifications During Public Health Emergencies or Other Conditions Restricting Inspector Onsite Presence

01/02/24

24-001

.docx

 

IMC

2515 App G

Baseline Inspection Guidance for Power Reactors Preparing for Transition to Decommissioning Phase

02/01/16

16-004

.docx

 

IMC

2516

Policy and Guidance for the License Renewal Inspection Program

06/26/23

23-018

.docx

 

IMC

2519

Construction Significance Determination Process

10/26/20

20-055

.docx

 

IMC

2522

Construction Reactor Oversight Process Self-Assessment Program

07/28/14

14-017

.docx

 

IMC

2522 App A

Construction Reactor Oversight Process Self-Assessment Metrics

10/04/17

17-021

.docx

 

IMC

2523

NRC Application of the Reactor Operating Experience Program in NRC Oversight Processes

01/15/21

21-005

.docx

 

IMC

2545

Research and Test Reactor Inspection Program

03/13/20

20-015

.docx

 

IMC

2550

Non-Power Production and Utilization Facilities (NPUFs) Licensed Under 10 CFR Part 50: Construction Inspection Program (CIP)

05/16/24

24-015

.docx

 

IMC

2561

Decommissioning Power Reactor Inspection Program

06/27/25

25-022

.docx

 

IMC

2562

Light-Water Reactor Inspection Program for Restart of Reactor Facilities following Permanent Cessation of Power Operations

04/24/25

25-009

.docx

 

IMC

2565

Regional Inspection Activities for Naval Reactors Naval Vessels Undergoing Decommissioning

08/28/20

20-040

.docx

 

IMC

2600

Fuel Cycle Facility Operational Safety and Safeguards Inspection Program

06/26/25

25-021

.docx

 

IMC

2600 App A

Guidance for Conducting Fuel Cycle Inspections Fuel Cycle Facility Terminology

07/27/23

23-021

.docx

 

IMC

2600 App B

NRC Core Inspection Requirements

07/27/23

23-021

.docx

 

IMC

2600 App C

Fuel Cycle Resident Inspection Program

06/26/25

25-021

.docx

 

IMC

2600 App D

Fuel Cycle Facility Inspection Planning

06/26/25

25-021

.docx

 

IMC

2600 App E

Inspection Program Modifications During Pandemics, Epidemics, or Other Widespread Illnesses or Diseases

12/15/20

20-072

.docx

 

IMC

2601

Reactive Inspection Decision Making Process for Fuel Facilities

09/20/16

16-023

.docx

 

IMC

2602

Decommissioning Fuel Cycle, Uranium Recovery, and Materials Inspection Program

12/15/22

22-026

.docx

 

IMC

2604

Licensee Performance Review

06/24/25

25-020

.docx

 

IMC

2606

Assessment of the Risk Resulting from a Potential Safety Noncompliance at a Fuel Cycle Facility

06/26/25

25-021

.docx

 

IMC

2606 Encl. 2
OUO-SRI

Evaluation Based on Specific Licensee ISAs

09/26/12

12-022

  

IMC

2620

On-Site Construction Reviews of Remedial Action at Inactive Uranium Mill Tailing Sites (Title I, Uranium Mill Tailings Radiation Control Act)

10/05/01

01-020

.doc

 

IMC

2630

Mixed Oxide Fuel Fabrication Facility Construction Inspection Program

09/20/16

16-023

.docx

 

IMC

2650

Fuel Cycle Inspection Assessment Program

11/08/18

18-038

.docx

 

IMC

2681

Physical Protection and Transport of Special Nuclear Material and Irradiated Fuel Inspections of Fuel Facilities

10/27/17

17-023

.docx

 

IMC

2682
OUO-SRI

Technical Assistance for Safeguards MC; Inspections at Fuel Facilities

06/18/84

84-018

  

IMC

2683
OUO-SRI

Material Control and Accounting Inspection of Fuel Cycle Facilities

02/07/24

24-005

  

IMC

2690

Inspection Program for Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR PART 71 Transportation Packagings

10/16/24

24-028

.docx

 

IMC

2691

Technical Basis for the Independent Spent Fuel Storage Installation Inspection Program

12/07/20

20-069

.docx

 

IMC

2694

Fuel Cycle Facility Construction and Pre-Operational Readiness Review Inspection Program

06/24/25

25-020

.docx

 

IMC

2694 App A

Fuel Facility Construction Inspection Program--Construction and Pre-Operational Inspection Procedures

06/24/25

25-020

.docx

 

IMC

2694 App B

Fuel Facility Construction Inspection Program, Licensee Performance Review (LPR), Supplement for Inspection Manual Chapter 2694

06/24/25

25-020

.docx

 

IMC

2694 App C

Principal Inspection Plan (PIP) Creation

06/24/25

25-020

.docx

 

IMC

2696

Louisiana Energy Services Gas Centrifuge Facility Construction and Pre-Operational Readiness Review Inspection Programs

10/19/06

06-028

.doc

 

IMC

2800

Materials Inspection Program

06/16/23

23-017

.docx

 

IMC

2801

Uranium Recovery and 11e.(2) Byproduct Material Facility Inspection Program

07/26/24

24-022

.docx

 

IMC

2810

Master Material License Oversight and Inspection Program

10/29/21

21-036

.docx

 

IMC

2815

Construction and Preoperational Inspection of Panoramic, Wet-Source-Storage Gamma Irradiators

03/27/01

01-010

.doc

 

IMC

2901

Team Inspections

05/20/22

22-010

.docx

 

IMC

2920

Construction Appraisal Team Inspection Program

03/29/85

85-011

  

To top of page

Page Last Reviewed/Updated Wednesday, September 24, 2025

Page Last Reviewed/Updated Wednesday, September 24, 2025