Home > NRC Library > ADAMS Public Documents
Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report
Accession Number: ML21286A574
Date Released: Thursday, March 10, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21277A142 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Submittal of Amendment 29 to Updated Final Safety Analysis Report. (4 page(s), 10/4/2021)
- ML21286A269 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Table of Contents (8 page(s), 10/4/2021)
- ML21286A253 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Effective Page Listing (38 page(s), 10/4/2021)
- ML21286A273 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.1 Project Identification (3 page(s), 10/4/2021)
- ML21286A245 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.2 Definitions. (13 page(s), 10/4/2021)
- ML21286A265 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Figures (3 page(s), 10/4/2021)
- ML21286A254 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.3, Methods of Technical Presentation (4 page(s), 10/4/2021)
- ML21286A268 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.3, List Of FSAR Engineering Draawings (24 page(s), 10/4/2021)
- ML21286A246 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.3-1, Piping and Instrument Symbols (2 page(s), 10/4/2021)
- ML21286A267 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.4 , Classification of BWR Systems, Criteria, and Requirements for Safety Evaluation (2 page(s), 10/4/2021)
- ML21286A252 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.4-1, Class of BWR Systems Criteria Requirements for Safety Evaluation (10 page(s), 10/4/2021)
- ML21286A244 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.5, Principal Design Criteria (13 page(s), 10/4/2021)
- ML21286A261 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.6, Plant Description (24 page(s), 10/4/2021)
- ML21286A258 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.6, Withheld. (35 page(s), 10/4/2021)
- ML21286A241 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.7, Comparison of Principal Design Characteristics (2 page(s), 10/4/2021)
- ML21286A272 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.7, Comparison of Nuclear System Design Characteristics (14 page(s), 10/4/2021)
- ML21286A250 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.8, Summary of Radiation Effects (1 page(s), 10/4/2021)
- ML21286A248 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.9, Plant Management (1 page(s), 10/4/2021)
- ML21286A243 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.10, Quality Assurance Program (1 page(s), 10/4/2021)
- ML21286A263 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.11, Identification Resolution of Construction Permit Concern - Summary (2 page(s), 10/4/2021)
- ML21286A262 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.11, ID Resolution of Construction Permit Concern - Summary (11 page(s), 10/4/2021)
- ML21286A274 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Section 1.12, General Conclusions (1 page(s), 10/4/2021)
- ML21286A255 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Table of Contents (5 page(s), 10/4/2021)
- ML21286A290 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.1, Summary Description (1 page(s), 10/4/2021)
- ML21286A275 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Site Description (3 page(s), 10/4/2021)
- ML21286A278 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2, Historical Information (31 page(s), 10/4/2021)
- ML21286A279 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.3, Meteorology (13 page(s), 10/4/2021)
- ML21286A277 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.3, Meteorology (51 page(s), 10/4/2021)
- ML21286A291 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.3, Meteorology (40 page(s), 10/4/2021)
- ML21286A284 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table, 2.4, Deleted (7 page(s), 10/4/2021)
- ML21286A280 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4, Hydrology, Water Quality, and Aquatic Biology (9 page(s), 10/4/2021)
- ML21286A282 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.4A, Maximum Possible Flood (7 page(s), 10/4/2021)
- ML21286A242 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.4A, Maximum Possible Flood (1 page(s), 10/4/2021)
- ML21286A257 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4A, Maximum Possible Flood (42 page(s), 10/4/2021)
- ML21286A270 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology and Seismology (17 page(s), 10/4/2021)
- ML21286A266 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.5, Sheets 1-3, Historical Earthquake Listing 200 Mile Radius Around 87.11 W LON 34/71 N LAT (7 page(s), 10/4/2021)
- ML21286A249 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.5, Geology and Seismology (37 page(s), 10/4/2021)
- ML21286A276 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.6, Environmental Radiological Monitoring Program (2 page(s), 10/4/2021)
- ML21286A283 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Summary Description, Table of Contents (11 page(s), 10/4/2021)
- ML21286A323 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.1, Summary Description (2 page(s), 10/4/2021)
- ML21286A314 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.2, Fuel Mechanical Design (8 page(s), 10/4/2021)
- ML21286A312 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.2-1, Deleted by Amendment No. 16 (5 page(s), 10/4/2021)
- ML21286A298 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1 (Deleted by Amendment 21) (1 page(s), 10/4/2021)
- ML21286A310 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.3, Reactor Vessel Internals Mechanical Design (18 page(s), 10/4/2021)
- ML21286A313 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3, Reactor Vessel Internals, Mechanical Design Data (1 page(s), 10/4/2021)
- ML21286A318 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figures 3.3 (11 page(s), 10/4/2021)
- ML21286A308 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.4, Reactivity Control Mechanical Design (34 page(s), 10/4/2021)
- ML21286A321 - Browns Ferry Nuclaer Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.4, Reactivity Control Mechanical Designs (25 page(s), 10/4/2021)
- ML21286A320 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.5, Control Rod Drive Housing Supports (3 page(s), 10/4/2021)
- ML21286A303 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.5, Control Rod Drive Housing Support Isometric (1 page(s), 10/4/2021)
- ML21286A305 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.6, Nuclear Design (10 page(s), 10/4/2021)
- ML21286A324 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.6, Definition Of Fuel Design Limits (1 page(s), 10/4/2021)
- ML21286A307 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.6, Deleted (1 page(s), 10/4/2021)
- ML21286A287 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.7, Thermal and Hydraulic Design (26 page(s), 10/4/2021)
- ML21286A285 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.7, Thermal and Hydraulic Design (3 page(s), 10/4/2021)
- ML21286A281 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Standby Liquid Control System (10 page(s), 10/4/2021)
- ML21286A289 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8, Standby Liquid Control (8 page(s), 10/4/2021)
- ML21286A299 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Table of Contents (5 page(s), 10/4/2021)
- ML21286A306 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.1, Summary Description (3 page(s), 10/4/2021)
- ML21286A309 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.2, Reactor Vessel and Appurtenances Mechanical Design (18 page(s), 10/4/2021)
- ML21286A296 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.2, Reactor Pressure Vessel Materials (2 page(s), 10/4/2021)
- ML21286A315 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2, Reactor Vessel and Appurtenances Mechanical Design (4 page(s), 10/4/2021)
- ML21286A301 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4 Section 4.3, Reactor Recirculation System (8 page(s), 10/4/2021)
- ML21286A317 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.3, Reactor Recirculation System (2 page(s), 10/4/2021)
- ML21286A316 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.3, Reactor Recirculation System (7 page(s), 10/4/2021)
- ML21286A319 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.4, Nuclear Steam Pressure Relief System (12 page(s), 10/4/2021)
- ML21286A311 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.4, Nuclear Steam Pressure Relief System (2 page(s), 10/4/2021)
- ML21286A304 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.4, Nuclear Steam Pressure Relief System (10/4/2021)
- ML21286A300 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Main Steam Line Flow Restrictor (3 page(s), 10/4/2021)
- ML21286A322 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, 4.5 Main Steam Line Flow Restrictor (10/4/2021)
- ML21286A302 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.6, Main Steam Isolation Valves (9 page(s), 10/4/2021)
- ML21286A331 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.6, Main Steam Isolation Valves (1 page(s), 10/4/2021)
- ML21286A330 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.7, Reactor Core Isolation Cooling System (4 page(s), 10/4/2021)
- ML21286A334 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.7, Reactor Core Isolation Cooling System Turbine - Pump Design Data (1 page(s), 10/4/2021)
- ML21286A338 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.7, Reactor Core Isolation Cooling (7 page(s), 10/4/2021)
- ML21286A335 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.8, Residual Heat Removal System (RHRS) (10 page(s), 10/4/2021)
- ML21286A343 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.8, Residual Heat Removal System Equipment Design Data (1 page(s), 10/4/2021)
- ML21286A332 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.8, Residual Heat Removal System Unit Cross Connections and Standby Coolant Supply (1 page(s), 10/4/2021)
- ML21286A333 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.9 Reactor Water Cleanup System (3 page(s), 10/4/2021)
- ML21286A342 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.9, Reactor Water Cleanup System Equipment Design Data (1 page(s), 10/4/2021)
- ML21286A339 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.9, Reactor Water Cleanup (11 page(s), 10/4/2021)
- ML21286A344 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.10, Nuclear System Leakage Rate Limits (7 page(s), 10/4/2021)
- ML21286A336 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.10, Drywall Leak Detection System (3 page(s), 10/4/2021)
- ML21286A326 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.11, Main Steam Lines, Feedwater Piping and Drains (3 page(s), 10/4/2021)
- ML21286A327 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Figure 14.11-1 through Figure 14.11-18 (Deleted) (1 page(s), 10/4/2021)
- ML21286A337 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.12, Inservice Inspection and Testing (2 page(s), 10/4/2021)
- ML21286A328 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System, Table of Contents (6 page(s), 10/4/2021)
- ML21286A341 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Section 5.1, Summary Description (10/4/2021)
- ML21286A329 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Section 5.2, Primary Containment System (53 page(s), 10/4/2021)
- ML21286A360 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2, Principal Design Parameters and Characteristics of Primary Containment (17 page(s), 10/4/2021)
- ML21286A352 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.2, Primary Containment (54 page(s), 10/4/2021)
- ML21286A357 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Section 5.3, Secondary Containment System (28 page(s), 10/4/2021)
- ML21286A350 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3, Secondary Containment (15 page(s), 10/4/2021)
- ML21286A340 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 5, Containment, Table of Contents (5 page(s), 10/4/2021)
- ML21286A353 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Section 6.1, Safety Objective (1 page(s), 10/4/2021)
- ML21286A346 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Section 6.2, Safety Design Basis (2 page(s), 10/4/2021)
- ML21286A355 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Section 6.3, Summary Description - Emergency Core Cooling (2 page(s), 10/4/2021)
- ML21286A354 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3, Emergency Core Cooling Systems Equipment Design Data Summary (1 page(s), 10/4/2021)
- ML21286A349 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.3-1, Deleted (1 page(s), 10/4/2021)
- ML21286A358 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Section 6.4, Description (12 page(s), 10/4/2021)
- ML21286A359 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.4, (Deleted by Amendment 13) (1 page(s), 10/4/2021)
- ML21286A347 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.4, Description (6 page(s), 10/4/2021)
- ML21286A361 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Section 6.5, Safety Evaluation (21 page(s), 10/4/2021)
- ML21286A348 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.5, Plant Parameters Used LOCAa Analysis (7 page(s), 10/4/2021)
- ML21286A356 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Figure 6.5, Deleted by Amendment 15 (9 page(s), 10/4/2021)
- ML21286A362 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Section 6.6, Inspection and Testing (4 page(s), 10/4/2021)
- ML21286A345 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Emergency Core Cooling Systems, Table of Contents (5 page(s), 10/4/2021)
- ML21286A364 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.1, Summary Description (10 page(s), 10/4/2021)
- ML21286A376 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.1, Systems (or Portions of Systems) Required to Mitigate LOCA and/or HELB (1 page(s), 10/4/2021)
- ML21286A366 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.1, Summary Description (1 page(s), 10/4/2021)
- ML21286A377 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.2, Reactor Protection System (21 page(s), 10/4/2021)
- ML21286A373 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.2, Reactor Protection System Instrumentation Specifications (3 page(s), 10/4/2021)
- ML21286A378 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2, Reactor Protection System (18 page(s), 10/4/2021)
- ML21286A371 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Primary Containment Isolation System (29 page(s), 10/4/2021)
- ML21286A368 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.3, Primary Containment Isolation (3 page(s), 10/4/2021)
- ML21286A374 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3, Primary Containment Isolation (5 page(s), 10/4/2021)
- ML21286A365 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.4, Emergency Core Cooling Control and Instrumentation (31 page(s), 10/4/2021)
- ML21286A372 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.4, Automatic Depressurization System Instrumentation (4 page(s), 10/4/2021)
- ML21286A370 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.4, Emergency Core Cooling Control (31 page(s), 10/4/2021)
- ML21286A375 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.5, Neutron Monitoring System (24 page(s), 10/4/2021)
- ML21286A367 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.5, Neutron Monitoring System, SRM Trips (5 page(s), 10/4/2021)
- ML21286A369 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.5, Neutron Monitoring (43 page(s), 10/4/2021)
- ML21286A393 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, Refueling Interlocks (6 page(s), 10/4/2021)
- ML21286A395 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.6, Refueling Interlocks Effectiveness (2 page(s), 10/4/2021)
- ML21286A392 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.6, Refueling Interlocks Functional Block Diagram (2 page(s), 10/4/2021)
- ML21286A388 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Reactor Manual Control System (15 page(s), 10/4/2021)
- ML21286A389 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.7, Reactor Manual Control System Instrumentation (2 page(s), 10/4/2021)
- ML21286A401 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.7, Reactor Manual Control System (8 page(s), 10/4/2021)
- ML21286A381 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7A and B, Rod Sequence Control System for Unit 1 (Deleted) (4 page(s), 10/4/2021)
- ML21286A403 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.8, Reactor Vessel Instrumentation (8 page(s), 10/4/2021)
- ML21286A396 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.8, Reactor Vessel Instrumentation (4 page(s), 10/4/2021)
- ML21286A383 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figures (8 page(s), 10/4/2021)
- ML21286A391 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.9, Recirculation Flow Control System (10 page(s), 10/4/2021)
- ML21286A399 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.9, (Deleted) (5 page(s), 10/4/2021)
- ML21286A385 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.10, Feedwater Control System (9 page(s), 10/4/2021)
- ML21286A380 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.10, Feedwater Control System (8 page(s), 10/4/2021)
- ML21286A406 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.11, Pressure Regulator and Turbine (7 page(s), 10/4/2021)
- ML21286A400 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.11, Pressure Regulator and Turbine Control System (2 page(s), 10/4/2021)
- ML21286A394 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.12, Process Radiation Monitoring (12 page(s), 10/4/2021)
- ML21286A397 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.12, Process Radiation Monitoring Systems Characteristics (2 page(s), 10/4/2021)
- ML21286A387 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.12, Process Radiation Monitoring (Deleted) (14 page(s), 10/4/2021)
- ML21286A384 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.13, Area Radiation Monitoring (4 page(s), 10/4/2021)
- ML21286A404 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.13, Area Radiation Monitoring (8 page(s), 10/4/2021)
- ML21286A390 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.13, Area Radiation Monitoring (1 page(s), 10/4/2021)
- ML21286A405 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.14, Drywell Leak Detection Radiation (2 page(s), 10/4/2021)
- ML21286A408 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.15, Health Physics Laboratory (1 page(s), 10/4/2021)
- ML21286A386 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.16, Process Computer System (9 page(s), 10/4/2021)
- ML21286A409 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.16, Process Computer System (2 page(s), 10/4/2021)
- ML21286A407 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.16, Process Computer System, Deleted (1 page(s), 10/4/2021)
- ML21286A382 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.17, Deleted (3 page(s), 10/4/2021)
- ML21286A398 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.17, Deleted (1 page(s), 10/4/2021)
- ML21286A402 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.17, Deleted (1 page(s), 10/4/2021)
- ML21286A426 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7. Section 7.18, Backup Control System (5 page(s), 10/4/2021)
- ML21286A419 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.19, Anticipated Transient Without Scram (5 page(s), 10/4/2021)
- ML21286A428 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Section 7.20, Instrument Setpoint Methodology (4 page(s), 10/4/2021)
- ML21286A423 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.20, Design Output Documents (3 page(s), 10/4/2021)
- ML21286A416 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of Contents (11 page(s), 10/4/2021)
- ML21286A413 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1, Summary Description (4 page(s), 10/4/2021)
- ML21286A421 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report Chapter 8, Section 8.2, Generators (2 page(s), 10/4/2021)
- ML21286A420 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3, Transmission System (5 page(s), 10/4/2021)
- ML21286A415 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3, Transmission System (10 page(s), 10/4/2021)
- ML21286A429 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.4, Normal Auxiliary Power System (22 page(s), 10/4/2021)
- ML21286A427 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.4, Normal Auxiliary Power (32 page(s), 10/4/2021)
- ML21286A412 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.4, Normal Auxiliary Power System Key Diagram (5 page(s), 10/4/2021)
- ML21286A411 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.5, Standby AC Power Supply (20 page(s), 10/4/2021)
- ML21286A414 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.5, Standby AC Power Supply (10 page(s), 10/4/2021)
- ML21286A417 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.5, Standby AC Power Supply (71 page(s), 10/4/2021)
- ML21286A430 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.6, 250-V DC Power Supply (5 page(s), 10/4/2021)
- ML21286A424 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.6, 250-V DC Power Supply (2 page(s), 10/4/2021)
- ML21286A418 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.7, 120-V AC Power Supply And Distribution (4 page(s), 10/4/2021)
- ML21286A425 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.7, 120-V AC Power Supply (10 page(s), 10/4/2021)
- ML21286A437 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.8, Auxiliary DC Power Supply And Distribution (4 page(s), 10/4/2021)
- ML21286A431 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.8, Evaluation of the 24-V DC Power Supply (3 page(s), 10/4/2021)
- ML21286A436 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.8, Auxiliary DC Power Supply (3 page(s), 10/4/2021)
- ML21286A448 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.9, Safety Systems Independence Criteria and Bases for Electrical Cable Installation (12 page(s), 10/4/2021)
- ML21286A445 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.9, Safety Systems Independence Criteria (1 page(s), 10/4/2021)
- ML21286A439 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.9, Safety System Independence Criteria (1 page(s), 10/4/2021)
- ML21286A433 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.10, Station Blackout (2 page(s), 10/4/2021)
- ML21286A438 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems, Table of Contents (7 page(s), 10/4/2021)
- ML21286A443 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Section 9.1, Summary Description (1 page(s), 10/4/2021)
- ML21286A444 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Section 9.2, Liquid Radwaste System (7 page(s), 10/4/2021)
- ML21286A446 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Table 9.2, Liquid Radwaste System (5 page(s), 10/4/2021)
- ML21286A447 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2, Liquid Radwaste System (24 page(s), 10/4/2021)
- ML21286A435 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Section 9.3, Solid Radwaste System (6 page(s), 10/4/2021)
- ML21286A434 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.3-1a through 9.3-1b (Deleted by Amendment 17) (2 page(s), 10/4/2021)
- ML21286A432 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Section 9.4, Gaseous Radwaste System (Deleted) (1 page(s), 10/4/2021)
- ML21286A440 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Section 9.5, Gaseous Radwaste System - Modified (11 page(s), 10/4/2021)
- ML21286A442 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Table 9.5, Gaseous Radwaste System - Modified (15 page(s), 10/4/2021)
- ML21286A449 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.5-1 thru 9.5-4 - Modified (9 page(s), 10/4/2021)
- ML21286A441 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 9, Radioactive Waste Control Systems, Table of Contents (4 page(s), 10/4/2021)
- ML21286A476 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.1, Summary Description (1 page(s), 10/4/2021)
- ML21286A480 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.2, New Fuel Storage (3 page(s), 10/4/2021)
- ML21286A486 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.2-1a and 1b (Deleted by Amendment 17) (2 page(s), 10/4/2021)
- ML21286A471 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.3, Spent Fuel Storage (6 page(s), 10/4/2021)
- ML21286A485 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figures 10.3-1 through 10.3-3 (3 page(s), 10/4/2021)
- ML21286A487 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.4, Tools and Servicing Equipment (7 page(s), 10/4/2021)
- ML21286A460 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.4, Tools and Servicing Equipment (10/4/2021)
- ML21286A482 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.4, Tools and Servicing Equipment (3 page(s), 10/4/2021)
- ML21286A474 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.5, Fuel Pool Cooling and Cleanup (7 page(s), 10/4/2021)
- ML21286A470 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.5, Fuel Pool Cooling and Cleanup (1 page(s), 10/4/2021)
- ML21286A473 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.5, Fuel Pool Cooling and Cleanup (14 page(s), 10/4/2021)
- ML21286A481 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10.6, Reactor Building Closed Cooling Water System (4 page(s), 10/4/2021)
- ML21286A465 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.6, Reactor Building Closed Cooling (4 page(s), 10/4/2021)
- ML21286A461 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.6, Reactor Building Closed Cooling Water System Flow Diagram (4 page(s), 10/4/2021)
- ML21286A477 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.7, Raw Cooling Water (2 page(s), 10/4/2021)
- ML21286A504 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.7, Raw Cooling Water System (16 page(s), 10/4/2021)
- ML21286A502 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.8, Raw Service Water System (2 page(s), 10/4/2021)
- ML21286A497 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.9, RHR Service Water System (4 page(s), 10/4/2021)
- ML21286A498 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.9, RHR Service Water System Flow Diagram (10 page(s), 10/4/2021)
- ML21286A491 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.10, Emergency Equipment Cooling Water System (4 page(s), 10/4/2021)
- ML21286A499 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.10, Emergency Equipment Cooling Water System (11 page(s), 10/4/2021)
- ML21286A492 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.11, Fire Protection System (6 page(s), 10/4/2021)
- ML21286A494 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.11, Power Block Structures (1 page(s), 10/4/2021)
- ML21286A503 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure Figure 10.11-1 Deleted by Amendment 9 (3 page(s), 10/4/2021)
- ML21286A496 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.12, Heating Ventilating and Air Flow (12 page(s), 10/4/2021)
- ML21286A495 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.13, Demineralized Water System (2 page(s), 10/4/2021)
- ML21286A500 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.13, Figure 10.13-1 Sheets 1 and 2 (Deleted by Amendment 17) (1 page(s), 10/4/2021)
- ML21286A493 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.14, Control and Service Air Systems (5 page(s), 10/4/2021)
- ML21286A501 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.14, Control Air System Mechanical Control Diagram (12 page(s), 10/4/2021)
- ML21286A520 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.15, Potable Water and Sanitary Systems (1 page(s), 10/4/2021)
- ML21286A511 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.16, Equipment and Floor Drainage (5 page(s), 10/4/2021)
- ML21286A513 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.17, Process Sampling Systems (4 page(s), 10/4/2021)
- ML21286A516 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.17, Process Sampling Systems (4 page(s), 10/4/2021)
- ML21286A510 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, 10.17 Figure, Process Sampling System (10/4/2021)
- ML21286A523 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.18, Plant Communications System (7 page(s), 10/4/2021)
- ML21286A521 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.18, Intraplant Communications (6 page(s), 10/4/2021)
- ML21286A509 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.19, Lighting System (1 page(s), 10/4/2021)
- ML21286A524 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.20, Auxiliary Boiler System (2 page(s), 10/4/2021)
- ML21286A514 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.21, Postaccident Sampling System (4 page(s), 10/4/2021)
- ML21286A517 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.21, PAASS In-Line Instrumentation (1 page(s), 10/4/2021)
- ML21286A515 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Figure 10.21, Postaccident Sampling (6 page(s), 10/4/2021)
- ML21286A519 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.22, Auxiliary Decay Heat Removal System (ADHR) (2 page(s), 10/4/2021)
- ML21286A518 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.23, Hydrogen Water Chemistry System (HWC) (4 page(s), 10/4/2021)
- ML21286A507 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.24, Supplemental Diesel Generator System (2 page(s), 10/4/2021)
- ML21286A522 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.25, Emergency High Pressure Makeup (EHPM) System (2 page(s), 10/4/2021)
- ML21286A508 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table of Contents (10 page(s), 10/4/2021)
- ML21286A483 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.1, Summary Description (1 page(s), 10/4/2021)
- ML21286A479 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.1, Summary Description (6 page(s), 10/4/2021)
- ML21286A463 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.2, Turbine Generator (4 page(s), 10/4/2021)
- ML21286A468 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Main Condenser System (2 page(s), 10/4/2021)
- ML21286A475 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.4, Main Condenser Gas Removal and Turbine Sealing Systems (2 page(s), 10/4/2021)
- ML21286A466 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.5, Turbine Bypass System (1 page(s), 10/4/2021)
- ML21286A472 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.6, Condenser Circulating Water System (7 page(s), 10/4/2021)
- ML21286A459 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Table 11.6, (Deleted by Amendment 28) (1 page(s), 10/4/2021)
- ML21286A469 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.6, Condenser Circulating Water (10 page(s), 10/4/2021)
- ML21286A458 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.7, Condensate Filter Demineralizer System (3 page(s), 10/4/2021)
- ML21286A467 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.7, Condensate Filter Demineralizer (3 page(s), 10/4/2021)
- ML21286A464 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.8, Condensate and Reactor Feedwater Systems (10/4/2021)
- ML21286A462 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.8, Condensate and Reactor Feedwater (6 page(s), 10/4/2021)
- ML21286A478 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Section 11.9, Condensate Storage and Transfer Systems (5 page(s), 10/4/2021)
- ML21286A488 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Table 11.9-1, Quality Requirements for Condensate in Storage (1 page(s), 10/4/2021)
- ML21286A484 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.9, Condensate Storage (8 page(s), 10/4/2021)
- ML21286A489 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 11, Table of Contents (4 page(s), 10/4/2021)
- ML21286A455 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Section 12.1, Summary Description (1 page(s), 10/4/2021)
- ML21286A454 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Section 12.2, Principal Structures and Foundations (92 page(s), 10/4/2021)
- ML21286A457 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.2, Reactor Building Concrete Structure Base Slab Design Data (50 page(s), 10/4/2021)
- ML21286A451 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Figure 12.2, General Plans and Sections (84 page(s), 10/4/2021)
- ML21286A453 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Section 12.3, Shielding and Radiation Protection (4 page(s), 10/4/2021)
- ML21286A452 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.3, Plant Radiation Zone Classification (1 page(s), 10/4/2021)
- ML21286A456 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents (6 page(s), 10/4/2021)
- ML21286A527 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Section 13.1, Organizational Structure of the Conduct of Operations (2 page(s), 10/4/2021)
- ML21286A533 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.2, Organization and Responsibility (5 page(s), 10/4/2021)
- ML21286A526 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.2, Organization and Responsibility (8 page(s), 10/4/2021)
- ML21286A540 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.3, Training Programs (2 page(s), 10/4/2021)
- ML21286A544 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Preoperational Test Program (57 page(s), 10/4/2021)
- ML21286A553 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.4, Typical Preoperational Test Sequence (1 page(s), 10/4/2021)
- ML21286A529 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.5, Startup and Power Test Program (75 page(s), 10/4/2021)
- ML21286A543 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program (5 page(s), 10/4/2021)
- ML21286A530 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5, Startup and Power Test Program (5 page(s), 10/4/2021)
- ML21286A539 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.6, Normal Operations (5 page(s), 10/4/2021)
- ML21286A556 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.6, Normal Operations (1 page(s), 10/4/2021)
- ML21286A551 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.7, Records (Deleted) (1 page(s), 10/4/2021)
- ML21286A545 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.8, Operational Review and Audits (2 page(s), 10/4/2021)
- ML21286A531 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.9, Refueling Operations (2 page(s), 10/4/2021)
- ML21286A538 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.10, Refueling Test Program (10 page(s), 10/4/2021)
- ML21286A536 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents (3 page(s), 10/4/2021)
- ML21286A549 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Analytical Objective (2 page(s), 10/4/2021)
- ML21286A554 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Unacceptable Safety Results for Abnormal Operational Transients (1 page(s), 10/4/2021)
- ML21286A534 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.3, Unacceptable Safety Results for Accidents (1 page(s), 10/4/2021)
- ML21286A547 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Approach to Safety Analysis (7 page(s), 10/4/2021)
- ML21286A550 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis (3 page(s), 10/4/2021)
- ML21286A528 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis (2 page(s), 10/4/2021)
- ML21286A555 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Analyses of Abnormal Operational Transients (37 page(s), 10/4/2021)
- ML21286A542 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients (2 page(s), 10/4/2021)
- ML21286A552 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients (82 page(s), 10/4/2021)
- ML21286A546 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Analysis of Design Basis Accidents (28 page(s), 10/4/2021)
- ML21286A548 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA (11 page(s), 10/4/2021)
- ML21286A532 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents (18 page(s), 10/4/2021)
- ML21286A541 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Conclusions (1 page(s), 10/4/2021)
- ML21286A537 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Analytical Methods (26 page(s), 10/4/2021)
- ML21286A535 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.8, Analytical Methods, (4 page(s), 10/4/2021)
- ML21286A562 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.8, Fuel Rod and Fuel Bundle Details (1 page(s), 10/4/2021)
- ML21286A559 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Deleted (1 page(s), 10/4/2021)
- ML21286A561 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.9, (Deleted) (1 page(s), 10/4/2021)
- ML21286A564 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Deleted (1 page(s), 10/4/2021)
- ML21286A560 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.10-1 through 14.10-20 Deleted by Amendment 28 (1 page(s), 10/4/2021)
- ML21286A569 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11 Analyses of Design Basis Accidents (Deleted) (1 page(s), 10/4/2021)
- ML21286A567 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.11-1 through Table 14.11-9 (Deleted) (1 page(s), 10/4/2021)
- ML21286A557 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.11-1 through Figure 14.11-18 (Deleted) (1 page(s), 10/4/2021)
- ML21286A558 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section, 14.12 Analysis of the Primary Containment Response (21 page(s), 10/4/2021)
- ML21286A570 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.12, Analysis of the Primary Containment Response (9 page(s), 10/4/2021)
- ML21286A563 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.12, Short-Term RSLB DBA LOCA Containment Pressure Response Design Case (15 page(s), 10/4/2021)
- ML21286A568 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Anticipated Transients Without Scram With Instability (ATWSI) (1 page(s), 10/4/2021)
- ML21286A566 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN ATWSI Evaluation (1 page(s), 10/4/2021)
- ML21286A565 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents (9 page(s), 10/4/2021)
- ML21286A196 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix A, Conformance to AEC Proposed General Design Criteria (46 page(s), 10/4/2021)
- ML21286A200 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix A, AEC General Design Criteria - Group 1 (Overall Plant Requirements) (10 page(s), 10/4/2021)
- ML21286A195 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix A, Conformance to AEC Proposed General Design Criteria, Table of Contents (2 page(s), 10/4/2021)
- ML21286A201 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix B, Technical Specifications (1 page(s), 10/4/2021)
- ML21286A198 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix C, Structural Qualification Of Subsystems And Components (57 page(s), 10/4/2021)
- ML21286A199 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix C Table, Structural Qualification (66 page(s), 10/4/2021)
- ML21286A197 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix C, Structural Qualification Of Subsystems And Components, Table of Contents (3 page(s), 10/4/2021)
- ML21286A204 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix D, Quality Assurance Plan For The Browns Ferry Nuclear Plant (2 page(s), 10/4/2021)
- ML21286A205 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix D - (Deleted by Amendment 7) (2 page(s), 10/4/2021)
- ML21286A206 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix D, Quality Assurance Plan For The Browns Ferry Nuclear Plant, Table of Contents (2 page(s), 10/4/2021)
- ML21286A212 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix E, Site Gaseous Release Rate Limit Calculation (1 page(s), 10/4/2021)
- ML21286A211 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix E, Site Gaseous Release Rate Limit Calculation, Table of Contents (1 page(s), 10/4/2021)
- ML21286A210 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix F, Unit Sharing and Interactions (29 page(s), 10/4/2021)
- ML21286A213 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix F, Unit Sharing And Interactions, Table of Contents (2 page(s), 10/4/2021)
- ML21286A225 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis (45 page(s), 10/4/2021)
- ML21286A221 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Table - Appendix G, Plant Nuclear Safety Operational Analysis (2 page(s), 10/4/2021)
- ML21286A222 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G - BWR Operating States (3 page(s), 10/4/2021)
- ML21286A219 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, Matrices Plant Nuclear Safety Operational (3 page(s), 10/4/2021)
- ML21286A218 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis, Table of Contents (5 page(s), 10/4/2021)
- ML21286A227 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State A (1 page(s), 10/4/2021)
- ML21286A223 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State B (1 page(s), 10/4/2021)
- ML21286A224 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State C (1 page(s), 10/4/2021)
- ML21286A226 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State D (1 page(s), 10/4/2021)
- ML21286A216 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, BWR Operating, State E (1 page(s), 10/4/2021)
- ML21286A217 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State F (1 page(s), 10/4/2021)
- ML21286A220 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix H, Core Thermal Design (Deleted By Amendment 16) (1 page(s), 10/4/2021)
- ML21286A230 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix I, Identification Resolution of Construction Permit Concerns (57 page(s), 10/4/2021)
- ML21286A240 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix I, Identification Resolution of Construction Permit Concerns, Table of Contents (2 page(s), 10/4/2021)
- ML21286A233 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix J, Reactor Pressure Vessel Design Summary Report - Unit 1 (2 page(s), 10/4/2021)
- ML21286A236 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix J, Reactor Pressure Vessel Design Summary Report. Unit 1, Table of Contents (1 page(s), 10/4/2021)
- ML21286A239 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix K, Reactor Pressure Vessel Design Summary Report - Unit 2 (2 page(s), 10/4/2021)
- ML21286A234 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix K, Reactor Pressure Vessel Design Summary Report - Unit 2, Table of Contents (1 page(s), 10/4/2021)
- ML21286A232 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix L, Reactor Pressure Vessel Design Summary Report - Unit 3 (2 page(s), 10/4/2021)
- ML21286A237 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix L, Reactor Pressure Vessel Design Summary Report - Unit 3, Table of Contents (1 page(s), 10/4/2021)
- ML21286A238 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix M, Report on Pipe Failures Outside Containment In The Browns Ferry Nuclear Plant (28 page(s), 10/4/2021)
- ML21286A235 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix M - (Deleted by Amendment 11) (2 page(s), 10/4/2021)
- ML21286A231 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix M - Pipe Failure Analysis Main Steam & Feedwater Vault Enclosure (7 page(s), 10/4/2021)
- ML21286A229 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix M, Report on Pipe Failures Outside Containment In The Browns Ferry Nuclear Plant, Table of Contents (3 page(s), 10/4/2021)
- ML21286A271 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 2 Cycle 22 Reload Analysis (November, 2020) (85 page(s), 10/4/2021)
- ML21286A256 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 3 Cycle 20 Reload Analysis (February, 2020) (83 page(s), 10/4/2021)
- ML21286A247 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Reload Licensing Report, Table of Contents (2 page(s), 10/4/2021)
- ML21286A260 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix O, Aging Management Program (30 page(s), 10/4/2021)
- ML21286A264 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix O, Aging Management Programs, Table of Contents (2 page(s), 10/4/2021)
- ML22055A077 - 2022/02/22 NRR E-mail Capture - Results of NRC SUNSI Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3, Updated Final Safety Analysis Report, Amendment 29 (EPID L-2021-LRO-0054) (2 page(s), 2/22/2022)
- ML22049B319 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix 2.4A, Probable Maximum Flood (PMF) - REDACTED (17 page(s), 10/4/2021)
- ML22049B324 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 1 Cycle 14 Reload Analysis (July 2020) - Redacted (85 page(s), 10/4/2021)
- ML22049B322 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.12, Heating, Ventilation, and Air Conditioning Systems - REDACTED (10/4/2021)
- ML22047A160 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2, Site Description - REDACTED (10/4/2021)
- ML22049B317 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrology, Water Quality, and Aquatic Biology - REDACTED (10/4/2021)
- ML22049B321 - Browns Ferry Nuclear Plant, Units 1, 2 & 3, Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.6, Instrument and Controls DC and AC Power System - REDACTED (10/4/2021)