Indian Point Unit No. 3 - Submittal of Amendment Update to the Updated Final Safety Analysis Report (UFSAR), Revision 07.
Accession Number: ML17299A163
Date Released: Friday, November 3, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML17299A164 - Indian Point Unit No. 3 - Submittal of Amendment Update to the Updated Final Safety Analysis Report (UFSAR), Revision 07. (21 page(s), 10/2/2017)
- ML17299A177 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary. (119 page(s), 10/2/2017)
- ML17299A171 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2.1 through Figure 1.6-3. (6 page(s), 7/31/1982)
- ML17299A172 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 1, Drawings (Redacted). (2 page(s), 10/2/2017)
- ML17299A180 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment. (569 page(s), 10/2/2017)
- ML17299A183 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2-2 through Figure 2.4-8. (9 page(s), 10/2/2017)
- ML17299A193 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 3, Reactor. (90 page(s), 10/2/2017)
- ML17299A194 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1 through Figure 3.2.38. (42 page(s), 10/2/2017)
- ML17299A197 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 4, Figure 4.2-2 through Figure 4.D-3. (24 page(s), 10/2/2017)
- ML17299A198 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System. (109 page(s), 10/2/2017)
- ML17299A199 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 4, Drawings. (2 page(s), 10/2/2017)
- ML17299A200 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 5, Containment. (186 page(s), 10/2/2017)
- ML17299A201 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 5, Containment, Figures. (39 page(s), 10/2/2017)
- ML17299A202 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 5, Drawings (REDACTED). (21 page(s), 10/2/2017)
- ML17299A203 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (210 page(s), 10/2/2017)
- ML17299A204 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 6, Figures. (34 page(s), 10/2/2017)
- ML17299A205 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 6, Drawings (REDACTED). (8 page(s), 10/2/2017)
- ML17299A206 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control. (106 page(s), 10/2/2017)
- ML17299A207 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 7, Figures. (24 page(s), 10/2/2017)
- ML17299A208 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 7, Drawings (REDACTED). (14 page(s), 10/2/2017)
- ML17299A209 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems. (30 page(s), 10/2/2017)
- ML17299A210 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 8, Drawings. (11 page(s), 10/2/2017)
- ML17299A211 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems. (190 page(s), 10/2/2017)
- ML17299A212 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 9, Figures. (10 page(s), 10/2/2017)
- ML17299A213 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 9, Drawings (REDACTED). (20 page(s), 10/2/2017)
- ML17299A214 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (44 page(s), 10/2/2017)
- ML17299A215 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 10, Figures. (20 page(s), 10/2/2017)
- ML17299A216 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 10, Drawings (REDACTED). (28 page(s), 10/2/2017)
- ML17299A217 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 11, Waste Disposal and Radiation Protection Systems. (68 page(s), 10/2/2017)
- ML17299A218 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 11, Figures. (2 page(s), 10/2/2017)
- ML17299A219 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 11, Drawings (REDACTED). (6 page(s), 10/2/2017)
- ML17299A220 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations. (13 page(s), 10/2/2017)
- ML17299A221 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 12, Figures. (2 page(s), 10/2/2017)
- ML17299A222 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations [Historical Information]. (38 page(s), 10/2/2017)
- ML17299A223 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 13, Figures. (3 page(s), 10/2/2017)
- ML17299A224 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis. (328 page(s), 10/2/2017)
- ML17299A226 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 14, Figures. (181 page(s), 10/2/2017)
- ML17299A228 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications And Bases. (1 page(s), 10/2/2017)
- ML17299A229 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 16, Design Criteria For Structures And Equipment. (63 page(s), 10/2/2017)
- ML17299A230 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 16, Figures. (9 page(s), 10/2/2017)
- ML17299A231 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program. (1 page(s), 10/2/2017)
- ML17299A233 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 18, Appendix A, License Renewal, (36 page(s), 10/2/2017)
- ML17299A234 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 19, Table Of Contents. (1 page(s), 10/2/2017)
- ML17299A236 - Indian Point Unit 3 Revision 7 to Updated Final Safety Analysis Report, Chapter 20, Instructions And Key To Unit 3 UFSAR For Revision 07. (2 page(s), 10/2/2017)