Home > NRC Library > ADAMS Public Documents
FOIA/PA-2011-0115 - Resp 1 - Partial.
Accession Number: ML110871329
Date Released: Monday, April 4, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML110871328 - FOIA/PA-2011-0115 - Resp 1 - Partial. (91 page(s), 3/25/2011)
- ML090750375 - Millstone, Unit 2, Review of Steam Generator Tube Inspection Report for 2008 Refueling Outage. (4 page(s), 4/13/2009)
- ML090830485 - Millstone, Unit No. 2 - Request for Additional Information Regarding Temporary Non-Code Repair of the Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger and Air Coller Heat Exchanger. (3 page(s), 4/6/2009)
- ML090890376 - IR 05000336-09-402, 05000423-09-402; on 02/23/2009 - 02/27/2009; Millstone Power Station; Access Control. (5 page(s), 3/30/2009)
- ML090900030 - IR 05000336-09-006, 05000423-09-006; on 01/12/2009 - 03/06/2009; Millstone Power Station; Component Design Bases Inspection. (49 page(s), 3/31/2009)
- ML090910148 - Surry Power Units 1 & 2, North Anna Power Units 1 & 2, Millstone Units 1, 2, & 3, Kewaunee Power Station, Decommissioning Funding Status Report. (19 page(s), 3/30/2009)
- ML090920687 - Millstone, Email dated 3/25/09, RE: Millstone Dry Cask Inspection. (1 page(s), 3/25/2009)
- ML090960641 - Kewaunee, Millstone, Units 1, 2 & 3 and ISFSI, North Anna, Units 1 & 2 and ISFSI, and Surry, Units 1 & 2 and ISFSI - Proof of Financial Protection, Guarantee of Payment of Deferred Premiums and Submission of Annual Financial Report. (337 page(s), 3/26/2009)
- ML090970295 - Millstone, Units 1, 2 & 3 and ISFSI - Submittal of Major Revision 006, Minor Revision 0 to Emergency Plan Procedure MP-26-EPI-FAP07, "Notifications and Communications". (40 page(s), 3/26/2009)
- ML090970397 - Kewaunee; Millstone, Units, 1, 2 & 3; North Anna , Units 1 & 2; Surry, Units 1 & 2 and Associated ISFSIs - Submittal of Dominion's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage... (5 page(s), 4/1/2009)
- ML090980054 - IR 05000245-09-007, on 03/11/09, Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 1, Waterford, CT. (12 page(s), 4/7/2009)
- ML090980064 - 04/23/2009-Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process. (25 page(s), 4/8/2009)
- ML090980084 - 04/23/2009 Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. Regarding the Safety Performance of the Millstone Power Station for Calendar Year 2008. (5 page(s), 4/8/2009)
- ML091030639 - Kewaunee Power Station, Millstone Power Station, Units 2 and 3, North Anna Power Station, Unit Nos. 1 and 2, and Surry Power Station, Unit Nos. 1 and 2 - Appendix C to Dominion Fleet Report DOM-NAF-2, "Qualification of the Westinghouse WRB-2M CHF. (9 page(s), 4/22/2009)
- ML091050623 - 04/23/2009 NRC & NEAC Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides. (25 page(s), 4/23/2009)
- ML091050660 - 04/23/09 Notice of Public Meeting with Nuclear Energy Advisory Council, to Discuss NRC's Assessment of Safety Performance of Millstone for CY 2008. (5 page(s), 4/15/2009)
- ML091060582 - Relaxation of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel. (12 page(s), 6/8/2009)
- ML091070390 - Press Release-I-09-022: NRC to Discuss Annual Assessment for Millstone Nuclear Plant at Two Public Meetings Set for April 23 in Waterford, Conn. (2 page(s), 4/17/2009)
- ML091100403 - Comment (1) of Chris L. Funderburk, on Behalf of Dominion Resources Services, Inc., Opposing NRC Regulatory Issue Summary 2009-XX on Implementation of the New Final Rule on Protection of Safeguards Information. (2 page(s), 4/8/2009)
- ML091120006 - NRC Operator Licensing Initial Exam Results, Millstone Power Station, Unit 2 (Cover Letter Publicly Available; Enclosures Non-Public). (3 page(s), 4/17/2009)
- ML091120062 - Millstone Power Station, Unit 2, Post Exam Comment Miscellaneous References (Folder 1). (31 page(s), 3/31/2009)
- ML091120075 - Millstone Power Station, Unit 2, Post Exam Comment SRO Question #77 References (Folder 1). (185 page(s), 3/31/2009)
- ML091120121 - Letter dtd. 4/15/09 from J. T. Spence, Millstone Power Station, Unit 2, re: Withdrawal of Comments Regarding Question #35; Post Exam Comments and Technical References (Folder 1). (65 page(s), 4/15/2009)
- ML091170138 - Millstone, Unit 3 - Test Results for Gas-Water Transport Tests. (3 page(s), 4/20/2009)
- ML091170150 - Enclosure 1- Part 1 of 2 - Report FAI/09-22, "Test Results for the Millstone-3 Gas-Water Transport Tests". (76 page(s), 3/31/2009)
- ML091200167 - Kewaunee; Millstone, Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominion's Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (ISFSI)... (5 page(s), 4/27/2009)
- ML091250240 - Millstone, Unit 2 - Response to Request for Additional Information Regarding 10 CFR 50.55a Relief Request 89-65 and 89-66; Temporary Non-Code Repair of the Class 3 Service Water System Emergency Diesel Generator Jacket Water Heat Exchanger and Cooler... (7 page(s), 5/5/2009)
- ML091260159 - Senior Reactor and Reactor Operator Initial Examinations - (Millstone Power Station, Unit 3). (5 page(s), 5/6/2009)
- ML091270250 - Millstone Unit 2 Final QA/Related Forms (Folder 1). (12 page(s), 4/30/2009)
- ML091280232 - Summary of April 23, 2009, Annual Assessment Meeting with Dominion Nuclear Connecticut, Inc. and the Connecticut Nuclear Energy Advisory Council (NEAC). (3 page(s), 5/7/2009)
- ML091310428 - Millstone Power Station, Unit No. 3: Request for Withholding Information From Public Disclosure. (4 page(s), 6/5/2009)
- ML091310666 - Millstone, Unit 3 - Third 10-year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Requests. (314 page(s), 4/28/2009)
- ML091320343 - Millstone, Unit 2, and Independent Spent Fuel Storage Installation, Submittal of Cask Registration for Spent Fuel Storage. (3 page(s), 4/4/2009)
- ML091320460 - Millstone, Units 1, 2 and 3 - 2008 Occupational Radiation Exposure Information. (8 page(s), 4/28/2009)
- ML091320561 - Millstone, Unit 3, 2008 Annual Environmental Protection Plan Operating Report. (13 page(s), 4/27/2009)
- ML091330240 - Millstone Power Station, Units 1, 2 & 3 - 2008 Radioactive Effluent Release Report. (269 page(s), 4/30/2009)
- ML091330638 - Millstone Unit 2, Ltr. to Mr. John Caruso, dated 5/13/09, re: Plan for Reactor Operators Return to Active Status. (2 page(s), 5/13/2009)
- ML091340064 - IR 05000336-09-002, 05000423-09-002; on 01/01/09 - 03/31/09, Millstone Power Station Integrated Inspection Report and Exercise of Enforcement Discretion. (38 page(s), 5/14/2009)
- ML091340133 - 05/26/2009 Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps From the Technical Specifications for Millstone Power Station, Unit No. 2. (4 page(s), 5/15/2009)
- ML091340263 - Millstone, Units 1, 2 & 3 and ISFSI - Major Revision 005, Minor Revision 0 to Emergency Plan Procedure, MP-26-EPI-FAP02, "Technical Support Center Activation and Operation". (17 page(s), 4/23/2009)
- ML091350217 - Millstone, Units 1, 2, & 3, 2008 Annual Radiological Environmental Operating Report. (139 page(s), 4/30/2009)
- ML091380106 - Millstone Power Station, Unit No. 2 - Weld Overlay Relief Request. (3 page(s), 7/21/2009)
- ML091380503 - Nancy Burton v. USNRC 09-1901-ag - Agency Appeal Pre-Argument Statement (Form C-A). (6 page(s), 5/11/2009)
- ML091380505 - Burton v. USNRC; No. 09-1901-ag - Petition to Review an Order. (10 page(s), 5/6/2009)
- ML091390160 - ER 05000336/2009301, January 26 - February 24, 2009, Millstone Power Station, Unit 2, Initial Operator Licensing Examination Report. (17 page(s), 5/18/2009)
- ML091410449 - Millstone, Unit 2 - Correction to Date of Letter Serial No. 09-248 Independent Spent Fuel Storage Installation Submittal of Cask Registration for Spent Fuel Storage. (2 page(s), 5/11/2009)
- ML091520618 - Millstone, Units 1,2 3 and ISFSI, Proposed Change to Emergency Plan. (11 page(s), 5/28/2009)
- ML091540017 - Millstone, Units 1, 2 & 3 and ISFSI - Major Revision 007, Minor Revision 0, to Emergency Plan Procedure, MP-26-EPI-FAP07, "Notifications and Communications". (41 page(s), 5/27/2009)
- ML091540203 - Millstone Power Station, Unit 2 - Response to Request for Additional Information 2008 Steam Generator Tube Inspections. (8 page(s), 5/20/2009)
- ML091540204 - Comment (1) of Raymond A. West on Behalf of Dominion Resources Services, Inc., on Draft Regulatory Guide DG-1192 - Request for Inclusion of ASME Code Case N-513-3 - (Proposed Revision 16 of Regulatory Guide 1.147, dated October 2007). (3 page(s), 5/29/2009)
- ML091540555 - Burton v USNRC; Docket No. 09-1901-ag - Unopposed Motion of Dominion Nuclear Connecticut, Inc. for Leave to Intervene. (9 page(s), 5/18/2009)
- ML091550244 - Millstone, Unit 2, Relief Requests for Temporary Non-Code Repair of Emergency Diesel Generator Heat Exchangers. (8 page(s), 7/8/2009)
- ML091590142 - FOIA/PA-2009-0189 - Post Test Analysis of the FAI Millstone 3 RWST (Refueling Water Storage Tank) 1/4 Scale Gas Entrainment Test, designated FAI/09-44, dated 3-13-09. (1 page(s), 6/5/2009)
- ML091590226 - Summary of May 26, 2009, Category 1 Pre-Application Meeting with Dominion to Discuss the Proposed License Amendment Request Regarding Charging Pumps at Millstone Power Station, Unit No. 2. (4 page(s), 6/25/2009)
- ML091590236 - Millstone, Units 1,2,3 & ISFSI, North Anna, Units 1, 2, & ISFSI, Surry, Units 1, 2, & ISFSI, Kewaunee & ISFSI, Correspondence Distribution Request Change Update. (5 page(s), 6/4/2009)
- ML091600055 - Requalification Program Inspection Millstone Power Station, Unit 3. (5 page(s), 6/5/2009)
- ML091690652 - Millstone, Unit 2, 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (6 page(s), 6/18/2009)
- ML091740450 - Email Regarding Electronic Copy of Presentation Material for MPS2. (2 page(s), 6/23/2009)
- ML091740456 - Request to Return Electronic Copy of Presentation. (1 page(s), 6/22/2009)
- ML091750997 - Millstone Power Station, Unit No. 3 - Acceptance Review Regarding Third 10 Year Inservice Inspection Program Interval. (3 page(s), 6/25/2009)
- ML091751014 - Acceptance Review for RR for Temporary Non-Code Repair. (2 page(s), 6/24/2009)
- ML091760920 - Millstone Power Station, Unit Nos. 2 and 3 - Acceptance Review Regarding Proposed Change to the Millstone Power Station Emergency Plan (TAC Nos. ME1396 and ME1397). (3 page(s), 7/7/2009)
- ML091801066 - Kewaunee and ISFSI, Millstone, Units 1, 2, 3 and ISFSI, North Anna, Units 1, 2 and ISFSl, Surry, Units 1 and 2 and ISFSl, SGI and OUO Correspondence Distribution Request Update. (7 page(s), 6/25/2009)
- ML091810677 - Clarification Needed on MPS3 ISI Intervak RR No. IR-3-08. (1 page(s), 6/30/2009)
- ML091810999 - Millstone, Unit 3, Correction to Acceptance Review Regarding Third 10-Year Inservice Inspection Program Interval. (2 page(s), 7/9/2009)
- ML091820102 - Clarification Needed on MPS2 SG Tube Inspection Report. (2 page(s), 7/1/2009)
- ML091820272 - Kewaunee, Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry Power, Units 1 & 2, Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (31 page(s), 6/30/2009)
- ML091870321 - PNO-I-09-004: Millstone Unit 2 Reactor Trip and Shutdown Greater Than 72 hours. (2 page(s), 7/3/2009)
- ML091870823 - Fauske and Associates LLC Letter from Robert E. Henry, 05/22/2009 Re: Response to NRC Request for FAI Proprietary Report (09-44) and Non-Proprietary Version (09-44R) dated 03/20/2009. (9 page(s), 5/22/2009)
- ML091870828 - Millstone, Unit 3 - Submittal of Test Results for Gas-Water Transport Tests. (5 page(s), 7/6/2009)
- ML091880510 - Dominion - Update of Information Pertaining to Foreign Interests. (2 page(s), 6/25/2009)
- ML091900366 - 2009/06/23-Comment (36) of C.L. Funderburk on Behalf of Dominion on Draft Regulatory Guide DG-4014, "Radiological Surveys and Monitoring During Operations." in regards to PR 20,30,40,50,70 and 72, "Decommissioning Planning". (5 page(s), 6/23/2009)
- ML091910365 - Millstone Power Station, Unit No. 2 - Nuclear Regulatory Commission Staff Review of the 2008 Steam Generator Tube Inspections (TAC ME0094). (3 page(s), 7/21/2009)
- ML091910457 - Millstone, Unit 3 - Test Results for Gas-water Transport Tests. (5 page(s), 7/1/2009)
- ML091910459 - Enclosure 3 - Fauske and Associates LLC Letter from Robert E. Henry, May 22, 2009 Application for Withholding AW-09-01 with Proprietary Information Notice and One Copy of Affidavit. (9 page(s), 5/22/2009)
- ML091910514 - Millstone Power Station, Unit 3 - Spent Fuel Pool Criticality Amendment Request Schedule (TAC MD8251). (2 page(s), 7/21/2009)
- ML091940159 - Millstones Power Station, Unit No. 3 - Request for Additional Information (RAI) Regarding Relief Request IR-3-04, Alternative Brazed Joint Methodology (TAC NO. ME1256). (3 page(s), 7/27/2009)
- ML091940420 - Burton v. USNRC; No. 09-1901-ag - Motion Information Statement. (3 page(s), 6/2/2009)
- ML092050743 - IR 05000336-09-003 & 05000423-09-003 on 04/01/2009 - 06/30/2009; Millstone Power Station - NRC Integrated Inspection Report. (37 page(s), 7/24/2009)
- ML092080506 - PNO-I-09-004A: Updated - Millstone Unit 2 Reactor Trip and Shutdown Greater than 72 Hours. (1 page(s), 7/27/2009)
- ML092090215 - Millstone, Unit 2, Request RR-89-61 Revision 2, Alternative Repair and Mitigation Requirements for Structural Weld Overlays. (12 page(s), 7/23/2009)
- ML092090216 - WCAP-16896-NP, Rev 2, "Millstone Unit 2 RCS Surge, Spray, Shutdown Cooling, Safety Injection, Charging Inlet, and Letdown/Drain Nozzles Structural Weld Overlay Qualification." (164 page(s), 6/30/2009)
- ML092100502 - Transmittal of LER 09-001-00 for Millstone, Unit 3 Regarding Deficient Vital Area Barrier. (2 page(s), 7/22/2009)
- ML092110519 - RR-89-61 Rev. 2 Need Date for DNC. (2 page(s), 7/30/2009)
- ML092120094 - Request for Withholding Information From Public Disclosure for Millstone Power Station Unit 2 (TAC No. ME1765). (3 page(s), 8/4/2009)
- ML092160880 - Request for Withholding Information from Public Disclosure for Millstone Power Station Unit 3. (3 page(s), 8/21/2009)
- ML092180339 - Documents Referenced in July 21, 2009 Letter. (1 page(s), 8/6/2009)
- ML092180973 - E-mail Regarding Placement of Document in ADAMS for Millstone, Unit 3, Issuance of Amendment No. 59. (29 page(s), 8/3/2009)
- ML092190894 - Surry and North Anna, Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A. (209 page(s), 8/4/2009)
- ML092220387 - Three Mile Island, Unit 1, Summary of NRC Comments on Draft Operating Test (Folder 2). (6 page(s), 4/21/2009)
- ML092250379 - RPM 2.3.4, Revision 002-03, "Inspection and Maintenance Process for Respiratory Protection Equipment". (15 page(s), 8/5/2009)
- ML092370296 - Millstone, Unit 3, Alternative Request IR-3-13 for the Use of Alternative Dissimilar Metal Weld Examination Depth-Sizing Requirements from ASME Code, Section XI. (10 page(s), 8/19/2009)
- ML092380461 - Millstone, Unit 3, Senior Reactor and Reactor Operator Initial Examinations: Written Examinations, Operating Tests and Reference Materials. (25 page(s), 7/29/2009)
- ML092380470 - NRC Comments on Draft Licensee-Developed (Millstone Unit 3) Exam (Written and Operating Tests) (Folder 2). (10 page(s), 7/1/2009)
- ML092380473 - Millstone, Unit 3, Draft - RO & SRO Written Exam (Folder 2). (115 page(s), 7/29/2009)
- ML092380478 - Millstone, Unit 3, Draft - Section A Operating Exam (Folder 2). (104 page(s), 7/29/2009)
- ML092390049 - LER 09-001-00, for Millstone Power Station re Reactor Trip Due to High Pressurizer Pressure. (6 page(s), 8/19/2009)
- ML092390141 - Millstone, Unit 3, Relief Request for Millstone Power Station, Unit 3, Relief Request IR-3-04, Response to Request for Additional Information for Alternative Brazed Joint Assessment Methodology. (128 page(s), 8/24/2009)
- ML092430338 - Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2, Removal of Mixed Vane Grid spacing restriction in appendix B to Fleet Report Dom-NAF-2-Evaluation of 4X4 DNB Test of 15X15 Vantage + with IFMS Using Vipre-D/WRB-1. (11 page(s), 8/28/2009)
- ML092440191 - Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station. (4 page(s), 9/1/2009)
- ML092450535 - Projected RIRP Cable Issue Milestone Schedule submitted by NEI/Industry. (3 page(s), 9/2/2009)
- ML092520069 - Operator Licensing Examination Approval (Millstone Power Station, Unit 3). (4 page(s), 9/4/2009)
- ML092530157 - NRC Investigation Report No. 1-2008-051, Ltr. to David Heacock, 9/10/09. (5 page(s), 9/10/2009)
- ML092570153 - Acceptance Review Regarding MPS3 RR IR-3-13. (1 page(s), 9/11/2009)
- ML092570643 - Kewaunee, Millstone, Units 2 and 3, North Anna, Units 1 and 2, and Surry, Units 1 and 2, NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations. (8 page(s), 9/11/2009)
- ML092580015 - Senior Reactor Operator Upgrade Written Retake Examination - Millstone Power Station, Unit 2. (5 page(s), 9/15/2009)
- ML092580382 - Millstone, Unit 3, 30-Day Special Report for Area Temperature Monitoring - Containment Area CS-03 (Pressurizer Cubicle). (5 page(s), 9/4/2009)
- ML092580659 - Millstone Power Station, Units 2 & 3 - Changes to Technical Specification Bases. (385 page(s), 9/9/2009)
- ML092590055 - Millstone Power Station, Unit 2, Special Report for Seismic Instrumentation. (3 page(s), 9/8/2009)
- ML092590073 - LER 09-002-00 for Millstone Power Station, Unit 2 re: Reactor Coolant System Pressure Boundary Leakage. (5 page(s), 9/8/2009)
- ML092610903 - Millstone, Unit 2, Acceptance Review Regarding Relief Request RR-89-61, Revision 2. (3 page(s), 9/29/2009)
- ML092710151 - Millstone, Unit 2, Alternative Request RR-89-67 for the P40A RCP Seal Cooler Return Tubing. (12 page(s), 9/22/2009)
- ML092720892 - G20090534/LTR-09-0459/EDATS: SECY-2009-0422 - Ltr. Senator Joseph I. Lieberman Re: Release of Radionuclides by Millstone Power Station. (6 page(s), 8/17/2009)
- ML092740662 - Millstone, Unit 2 - Alternative Request RR-89-68 for Use of Code Case N-722-1 for Bare Metal Visual Examination of the RPV Flange Seal Leak-off Line Welds Made of Alloy 600/82/182 Materials. (12 page(s), 10/1/2009)
- ML092750625 - G20090534/LTR-09-0459/EDATS: SECY-2009-0422- Senator Joseph T. Lieberman Letter RE: Release of Radionuclides by Millstone Power Station. (3 page(s), 10/22/2009)
- ML092780588 - Transnuclear, Inc Part 21 Report re Fasteners on Spent Fuel Storage Devices Not Meeting Standards. (4 page(s), 10/1/2009)
- ML092800276 - Millstone, Units 1, 2, 3 and Independent Spent Fuel Storage Installation-Request for Additional Information Regarding Proposed Change to the Millstone Power Station Emergency Plan. (4 page(s), 10/16/2009)
- ML092870739 - Millstone Power Station, Unit No. 2 - Relief Request RR-89-61, Revision 2, Regarding the Use of Weld Overlays as an Alternative Repair (TAC No. ME1765). (15 page(s), 10/15/2009)
- ML092880401 - September 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Millstone Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public). (2 page(s), 10/14/2009)
- ML092890142 - NRC Operator Licensing Initial Exam Results, Millstone Nuclear Power Station, Unit No. 3 (Cover letter publicly available, enclosures withheld from public). (4 page(s), 10/9/2009)
- ML092890573 - Acceptance Letter re: MPS2 Alternative Request RR-89-68 (2 page(s), 10/16/2009)
- ML092890626 - Millstone, Unit 2, Supplement Information to Request RR-89-61 Revision 2, Alternative Repair and Mitigation Requirements for Structural Weld Overlays. (2 page(s), 10/9/2009)
- ML092930982 - 2009/10/19-Comment (26) of Mary Lampert, et. al., on Behalf of Pilgrim Watch , on Rules PR-50 and 50, "Enhancements to Emergency Preparedness Regulations." (37 page(s), 10/19/2009)
- ML092960410 - Millstone, Unit 3, Exam Handouts to Applicants (Folder 3). (1 page(s), 8/8/2009)
- ML092960413 - Millstone, Unit 3, Final Outlines (Folder 3). (19 page(s), 8/8/2009)
- ML092960416 - Millstone Power Station, Unit 3 - Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3). (117 page(s), 8/8/2009)
- ML092960418 - Millstone, Unit 3, Final Operating Exam (Folder 3). (471 page(s), 8/8/2009)
- ML092960560 - Millstone Power Station, Unit Nos. 2 and 3 - Request for Additional Information Regarding Generic letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Tac Nos. MD7845 and MD7846). (6 page(s), 11/6/2009)
- ML093000253 - Millstone, Unit 3, RAI, Regarding Steam Generator Tube Inspection Report( TAC No. ME0942). (4 page(s), 11/2/2009)
- ML093020691 - Request for Supplemental Information for Acceptance Review of Dominion Topical Report re. Mixing Vane Grid Spacing Restriction. (2 page(s), 10/29/2009)
- ML093030285 - 2009/10/28-Comment (55) of C.L. Funderburk on Behalf of Dominion Resources Services, Inc., on Proposed Rule PR 31, regarding Limiting the Quantitiy of Byproduct Material in a Generally Licensed Device. (4 page(s), 10/28/2009)
- ML093060099 - ER 05000423-09-302; September 14-22, 2009; Millstone Power Station, Unit 3; Initial Operator Licensing Examination Report. (10 page(s), 11/2/2009)
- ML093060395 - Transnuclear, Inc. - Submittal of thirty Day Written Report of a Potential Deviation and Failure to Comply Associated with Unsubstantiated Certified Materials Test Reports for Certain Small Parts Utilized in Products Fabricated. (24 page(s), 10/30/2009)
- ML093080517 - Letter, Proposed Implementation Schedule Required by the Title 10 of the Code of Federal Regulation 73.54 for Cyber Security Plans. (3 page(s), 12/14/2009)
- ML093090606 - IR 05000336-09-004, 05000423-09-004; on July 1, 2009 - September 30, 2009; Millstone Power Station Unit 2 and Unit 3; Refueling and Other Outage Activities and Follow-up of Events. (42 page(s), 11/5/2009)
- ML093140625 - Millstone Power Station, Unit No. 2 - Summary of Teleconference Re: Verbal Authorization for Relief Request RR-89-67 (TAC No. ME2296). (3 page(s), 11/17/2009)
- ML093160744 - E-Mail--Weld Overlay Examination Report Associated with RR-89-61, Revision 2, for Weld Overlay Examinations that Have Been Performed at MPS2 Refueling Outage 2R19 (2 page(s), 11/12/2009)
- ML093170166 - Part 1 of 4--Weld Overlay Examination Report 2R19. (80 page(s), 11/12/2009)
- ML093170173 - Part 2 of 4--Weld Overlay Examination Report 2R19. (69 page(s), 11/12/2009)
- ML093170176 - Part 3 of 4--Weld Overlay Examination Report 2R19. (76 page(s), 11/12/2009)
- ML093170185 - Part 4 of 4--Weld Overlay Examination Report 2R19. (74 page(s), 9/23/2009)
- ML093210168 - Millstone Power Station, Unit 2 - Core Operating Limits Report, Cycle 20. (14 page(s), 11/6/2009)
- ML093210248 - Millstone Power Station, Unit No. 3 - Request for Additional Information Regarding Third 10-Year Interval Inservice Inspection Program Relief Request IR-3-01 (TAC No. ME1254). (4 page(s), 12/1/2009)
- ML093210591 - Millstone Power Station, Unit No. 3 - Request for Additional Information Regarding Third 10-Year Interval Inservice Inspection Program Relief Request IR-3-05 (TAC No. ME1257). (4 page(s), 12/10/2009)
- ML093221042 - Millstone Power Station, Unit No. 3 - Issuance of Relief Request IR-3-04 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME1256). (9 page(s), 11/30/2009)
- ML093230003 - Millstone, Unit 3, Request for Additional Information Regarding Third 10-Year Interval Inservice Inspection Program Relief Request IR-3-10. (4 page(s), 12/9/2009)
- ML093240393 - Millstone Power Station, Unit No. 3 - Issuance of Relief Request IR-3-08 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix VIII (TAC ME1260). (7 page(s), 12/24/2009)
- ML093290205 - 11/18/2009 - Burton v. USNRC; 09-1901-ag - Order that the Proceeding is Dismissed. (1 page(s), 11/18/2009)
- ML093290312 - Millstone, Units 1, 2 & 3 and ISFSI (LBDCRS 09-MP1-001, 09-MP2-020, and 09-MP3-008) - Application for Proposed Change to Emergency Plan. (31 page(s), 11/24/2009)
- ML093310330 - Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry Units 1 & 2, Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2- Supplemental Information. (20 page(s), 11/20/2009)
- ML093340216 - IR 05000336-09-403, and IR 05000423-09-403, on 10/20/2009, Millstone Power Station, NRC Security Inspection Report. Letter Only. (5 page(s), 11/30/2009)
- ML093350528 - Millstone Unit 3, Response to Request for Additional Information Regarding 2008 Steam Generator Tube Inspections. (4 page(s), 11/23/2009)
- ML093350751 - Temporary Instruction 2515/180, Managing Fatigue. (1 page(s), 1/14/2010)
- ML093360002 - Millstone Power Station, Unit 3, Final QA/Related Exam Forms (Folder 1). (12 page(s), 10/8/2009)
- ML093430415 - Submittals re. Dominion - Mixing Vane Grid Spacing Restriction found acceptable for review. (2 page(s), 12/8/2009)
- ML093441075 - Millstone, Unit 3 - Request for Additional Information Regarding Relief Request IR-3-13 Proposed Alternative for Dissimilar Metal Weld Examination Depth-Sizing Requirements. (3 page(s), 12/23/2009)
- ML093450408 - Kewaunee Power Station, Millstone Power Station, Units 2 & 3, North Anna Power Station, Units 1 &2, Surry Power Station Units 1 & 2 - Withholding of Information Determined To Be Proprietary. (4 page(s), 12/23/2009)
- ML093500669 - Millstone Power Station, Unit No. 3 - Review of the 2008 Steam Generator Tube Inservice Inspections (TAC No. ME0942). (4 page(s), 12/22/2009)
- ML093520170 - Millstone, Unit 3, Relief Request IR-3-01 Response to Request for Additional Information Regarding Snubber Inspection and Testing for Third 10-Year Interval. (7 page(s), 12/16/2009)
- ML093550213 - Millstone-Office of Investigations Case No. 1-2009-009. (3 page(s), 12/21/2009)
- ML093550301 - PNO-I-09-007: Millstone Unit 3 Reactor Trip and Shutdown Greater than 72 Hours. (2 page(s), 12/21/2009)
- ML093560847 - LER 09-003-00, Millstone, Unit 2 re Two Independent Diesel Generators Rendered Inoperable Due to Common Cause. (6 page(s), 12/4/2009)
- ML093570237 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-89-67 Regarding the Repair of Reactor Coolant Pump Seal Cooler Return Tubing and Weld (TAC No. ME2296). (10 page(s), 4/26/2010)
- ML093580156 - Millstone Power Station, Unit No. 3 - Issuance of Relief Requests IR-3-06 and IR-3-07 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC Nos. ME1258 and ME1259). (9 page(s), 2/4/2010)
- ML093620085 - Millstone Power Station Unit 3, License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, "Steam Generator (SG) Program," and TS 6.9.1.7, "Steam Generator Tube Inspection Report" for One-Time Alternate Repair Criteria (H*). (56 page(s), 11/23/2009)
- ML093620086 - WCAP-17071-NP, Rev 0, "H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)". (439 page(s), 4/30/2009)
- ML100050197 - 12/18/2009 - Burton v. USNRC; 09-1901-ag - Order Dismissing Proceeding. (1 page(s), 12/18/2009)
- ML100050198 - 12/30/2009 - Burton v. USNRC; 09-1901-ag - Letter to C O Wolfe frm D R Lewis re: "Response of Dominion Nuclear Connecticut, Inc. in Opposition to Nancy Burton's Motion to Reinstate Appeal and for Leave to File Documents Nunc Pro Tunc." (9 page(s), 12/30/2009)
- ML100060370 - PNO-I-09-007A: Update - Millstone Unit 3 Reactor Trip and Shutdown Greater than 72 Hours. (2 page(s), 1/6/2010)
- ML100070068 - Millstone Power Station, Units 2 and 3 - Request for Additional Information Regarding Generic Letter 2004-02 (TAC Nos. MC4694 and MC4695). (10 page(s), 2/4/2010)
- ML100070073 - USNRC 10CFR Part 21 Notification - Flowserve Figure 848 Disk/Disk Nut Separation. (8 page(s), 11/19/2009)
- ML100070413 - Kewaunee, Millstone, 1, 2 & 3 and ISFSI, North Anna, Units 1 & 2 and ISFSI, Surry, 1 & 2 and ISFI - Nuclear Liability Insurance Endorsement. (35 page(s), 1/6/2010)
- ML100070559 - D. Heacock ltr. re: Millstone Unit 1 - 25 Day Response to NRC Order Imposing Increased Controls (EA-09-204) and Order Imposing Fingerprinting and Criminal History Records Check. (3 page(s), 1/20/2010)
- ML100110025 - December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Millstone Power Station, Unit 3 (Cover letter publicly available, enclosures withheld from public). (2 page(s), 1/8/2010)
- ML100120018 - 2010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10. (6 page(s), 1/8/2010)
- ML100120318 - MPS3 Acceptance Review License Amendment Request Regarding Steam Generator One-Time Alternate Repair Criteria. (2 page(s), 1/12/2010)
- ML100131115 - Millstone Power Station, Units 1, 2 & 3 - Request for Exemptions from 10 CFR 73.55 Power Reactor Security Requirements Final Rule Additional Information. (5 page(s), 1/12/2010)
- ML100131116 - Millstone Power Station, Units 1, 2, & 3, Request for Exemptions from 10 CFR 73.55 Power Reactor Security Requirements Final Rule. (2 page(s), 1/12/2010)
- ML100190064 - Millstone, Units 2 & 3, Response to Request for Additional Information Regarding Generic Letter 2008-01, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. (10 page(s), 1/14/2010)
- ML100190513 - Millstone, Unit 3 - Relief Request IR-03-05 Response to Request for Additional Information Regarding Proposed Alternative Related to Inservice Inspection of Weld Overlays For The Third 10-Year Interval. (16 page(s), 1/14/2010)
- ML100200490 - Millstone, Unit 3, Request For Additional Information Regarding Spent Pool Criticality Amendment Request. (6 page(s), 1/26/2010)
- ML100220055 - Operator Licensing Retake Examination Approval (Millstone Unit 2). (2 page(s), 1/19/2010)
- ML100250286 - LER 09-004-00 for Millstone, Unit 2, Regarding Overdue ASME Code Required Inservice Test Did Not Meet Acceptance Criteria. (6 page(s), 1/11/2010)
- ML100270074 - 02/10/10 Notice of Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Responses to the Millstone Power Station, Unit No. 3 Spent Fuel Pool Criticality License Amendment Request for Additional Information (TAC No. MD8251). (4 page(s), 1/27/2010)
- ML100330149 - Millstone, Unit 3, Response to Request for Additional Information Regarding Relief Request IR-3-13 Proposed Alternative For Dissimilar Metal Weld Examination Depth-Sizing Requirements (TAC No. ME2125). (11 page(s), 2/1/2010)
- ML100330422 - Millstone Power Station, Unit Nos. 1, 2, and 3 - Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME3106 and ME3107). (7 page(s), 3/19/2010)
- ML100330524 - Millstone, Units 1, 2 and 3, Environmental Assessment and Finding of No Significant Impact. (5 page(s), 3/19/2010)
- ML100331499 - 04/13/2010 Notice of Conference Call with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses. (4 page(s), 3/1/2010)
- ML100341288 - IR 05000336/2009005, 05000423/2009005; October 1, 2009 - December 31, 2009; Millstone Power Station Unit 2 and Unit 3; Operability Evaluations; Refueling and Other Outage Activities; Event Follow-up. (52 page(s), 2/3/2010)
- ML100350392 - State of Connecticut, Office of Attorney General, Letter Regarding Reduction of Staff at Millstone Nuclear Power Station to be Maintained Full Staff for Emergency Response and Control Room. (3 page(s), 1/21/2010)
- ML100361055 - Dominion Nuclear Connecticut, Inc, Relief Request Ir-3-10 Response to Request for Additional Information Regarding Alternative Examination Criteria for the Visual Examinations of Reactor Coolant System Hot Leg and Cold Leg Nozzle-to-safe End Welds..... (58 page(s), 2/3/2010)
- ML100470870 - Millstone Station, Unit 2 Retake - NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (4 page(s), 11/20/2009)
- ML100470905 - Millstone Station, Unit 2, Draft - Outlines (Folder 2). (20 page(s), 11/20/2009)
- ML100470918 - Millstone Station, Unit 2 - Draft Written Exam. (105 page(s), 11/20/2009)
- ML100490358 - Millstone, Unit 2, Startup Test Report for Cycle 20. (16 page(s), 2/2/2010)
- ML100500982 - Millstone 3 Spent Fuel Pool Criticality Presentation for Feb 17 Public Meeting (10 page(s), 2/17/2010)
- ML100501163 - Millstone, Unit 2, Inservice Inspection Program - Owner's Activity Report for Refueling Outage 19. (7 page(s), 2/4/2010)
- ML100540220 - Millstone, Unit 3 - Relief Request IR-3-01 Supplemental Information re Snubber Inspection and Testing for Third 10-Year Interval. (4 page(s), 2/19/2010)
- ML100541851 - LER 09-002-00 for Millstone, Unit 3, Regarding Automatic Reactor Trip. (6 page(s), 2/15/2010)
- ML100550119 - Millstone, Unit 1 - Answer and Response to Order Imposing Increased Controls on Power Reactor Licensees Undergoing Decommissioning Dated November 23, 2009. (2 page(s), 2/12/2010)
- ML100560359 - LER 09-005-00 for Millstone Power Station, Unit 2 re: Both Containment Air Lock Doors Open in Mode 1. (6 page(s), 1/29/2010)
- ML100570055 - Y020100028/EDATS: NRR-2010-0028 - Richard Blumenthal, Connecticut Attorney General's Letter In Response Ltr Dated 1/21/2010 Regarding Reduction in Staff at Millstone Nuclear Power Station. (2 page(s), 3/10/2010)
- ML100610104 - Millstone Power Station Unit 3 - Response to Request for Additional Information Questions 26, 27 & 29 re Spent Fuel Pool Criticality License Amendment Request. (15 page(s), 3/1/2010)
- ML100610136 - Notification of Individual Examination Results for Applicants on Written Retake Upgrade Examination Conducted on 01/29/10. (3 page(s), 3/1/2010)
- ML100610235 - MPS3 RR IR-3-10 Clarification. (1 page(s), 2/23/2010)
- ML100610348 - Millstone, Units 2 & 3, Submittal of Technical Specifications 2009 Annual Report. (2 page(s), 2/18/2010)
- ML100621420 - Annual Assessment Letter - Millstone 2010 (Reports 05000336-10-001 and 05000423-10-001). (7 page(s), 3/3/2010)
- ML100630798 - Kewaunee & ISFSI, Millstone, Units 1, 2, 3 & ISFSI, North Anna, Units 1, 2, & ISFSIs, Surry, Units 1, 2, & ISFSIs - Correspondence Distribution Change Update. (4 page(s), 3/4/2010)
- ML100640343 - Millstone, Unit 3, Response to Questions 28 and 30 of Request for Additional Information Regarding a Spent Fuel Pool Criticality License Amendment Request. (28 page(s), 3/5/2010)
- ML100640430 - Millstone Power Station, Unit Nos. 1, 2, and 3-Exemption From The Requirements of 10 CFR Part 73, Section 73.55 (TAC Nos. J00287, ME3106 and ME3107) (8 page(s), 3/26/2010)
- ML100640440 - Millstone Power Station, Unit Nos 1, 2 and 3 Exemption. (6 page(s), 3/26/2010)
- ML100640446 - Millstone Power Station Unit 3-Issuance Relief. (10 page(s), 3/12/2010)
- ML100640456 - Millstone, Unit 3, 10CFR50.55a Relief Request IR-3-14, Update to the Risk-Informed Inservice Inspection Program for the Third 10-Year Inspection Interval. (27 page(s), 3/5/2010)
- ML100670343 - Acceptance Review: Part 73 Exemption Request. (1 page(s), 3/8/2010)
- ML100670463 - Millstone Station, Unit 2 - Final Written Examination with Answer Key (401-5 Format). (76 page(s), 1/15/2010)
- ML100670496 - Millstone Station, Unit 2 - Final Outlines (Folder 3). (12 page(s), 1/15/2010)
- ML100670507 - Millstone Station, Unit 2, Actual Handouts to Applications (Folder 3). (4 page(s), 1/15/2010)
- ML100680118 - Millstone Power Station, Unit 3 - Issuance Of Relief Request IR-3-01 Regarding Use Of American Society Of Mechanical Engineering Code, Section XI, Appendix VIII (TAC No. ME1254). (14 page(s), 4/6/2010)
- ML100700040 - ER 05000336/2010301; January 20 - February 24, 2010; Millstone Nuclear Power Station Unit 2; Operator Licensing Retake Examination Report. (9 page(s), 3/10/2010)
- ML100750002 - Millstone, Unit 1 - License Termination. (1 page(s), 3/11/2010)
- ML100750024 - Millstone Power Station, Unit No. 3 - Issuance of Amendment Re: Spent Fuel Pool Criticality (TAC MD8251). (28 page(s), 3/26/2010)
- ML100760116 - 02/17/2010 Summary of Meeting with DNC to Discuss Responses to the Request for Additional Information Regarding MPS3 Spent Fuel Pool Criticality License Amendment Request (TAC MD8251). (4 page(s), 3/17/2010)
- ML100770358 - Millstone Power Station, Unit No. 3 - Issuance of Amendment Re: Changes to the Steam Generator Inspection Scope and Repair Requirements (TAC ME2978). (33 page(s), 5/3/2010)
- ML100770492 - Kewaunee Power Station, Millstone Power Station, Units 2 and 3, North Anna Power Station, Units 1 and 2, and Surry Power Station, Units 1 and 2 - Closeout of Bulletin 2007-01 "Security Officer Attentiveness" (TAC Nos. MD7611, MD7618, MD7619, MD7623...... (3 page(s), 3/30/2010)
- ML100820062 - Millstone, Unit 3, Issuance of Relief Request IR-3-10 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix VIII. (10 page(s), 4/16/2010)
- ML100820157 - Millstone Power Station - NRC Emergency Preparedness Annual Inspection Report Nos. 05000336/2009501 and 05000423/2009501; NRC Security Annual Inspection Report Nos. 05000336/2009401 and 05000423/2009401. (4 page(s), 3/22/2010)
- ML100820422 - 04/08/10 Notice of Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos 2 and 3 Generic Letter 2004-02 Supplemental Responses. (4 page(s), 3/26/2010)
- ML100840467 - Millstone, Unit 1, Clarification of Orders Imposing Increased Controls and Fingerprinting and Criminal History Records Check Requirements on Power Reactor Licensees Undergoing Decommissioning dated November 23, 2009. (2 page(s), 2/23/2010)
- ML100840738 - Millstone Power Station, Unit No. 3 - Issuance of Relief Requests IR-3-13 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME2125). (8 page(s), 4/15/2010)
- ML100880378 - 04/22/2010 Notice of Meeting With Dominion Nuclear Connecticut, Inc., to Discuss the Nuclear Regulatory Commission's Assessment of the Safety Performance of the Millstone Power Station for Calendar Year 2009. (4 page(s), 3/29/2010)
- ML100880398 - 04/22/2010 Notice of Meeting With Dominion Nuclear Connecticut, Inc., to Discuss NRC's Assessment of the Safety Performance of the Millstone Power Station for Calendar Year 2009 with the Nuclear Energy Advisory Council (NEAC). (5 page(s), 3/29/2010)
- ML100900200 - Millstone, Unit 2, Relief Requests RR-04-02, Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel, and RR-04-03, Alternative Evaluation Criteria for Code Case N-513-2, Temporary Acceptance of Flaws in.... (10 page(s), 3/30/2010)
- ML100910127 - Millstone, Unit 1, Decommissioning Funding Status Report. (5 page(s), 3/30/2010)
- ML100920093 - 10 CFR21 Notification of a Potential Weld Defect. (2 page(s), 3/25/2010)
- ML100920425 - IR 05000336-10-006 and 05000423-10-006; 02/08/10 - 02/25/2010; Millstone Power Station Unit 2 and Unit 3; Baseline Inspection of the Identification and Resolution of Problems. (28 page(s), 4/2/2010)
- ML100950189 - NRC Office of Investigation Report 1-2009-022 - Millstone. (2 page(s), 4/5/2010)
- ML100970206 - Millstone Power Station - Chemistry Procedure, Liquid Waste Sample Sink, Rev. 003-00. (63 page(s), 3/29/2010)
- ML100970598 - Millstone Power Station, Unit Nos. 1, 2, 3 and Independent Spent Fuel Storage Installation - Proposed Change to the Millstone Power Station Emergency Plan (TAC Nos. JO0287, ME1396 and ME1397). (4 page(s), 4/27/2010)
- ML100980415 - Draft Millstone GL2004-02 Supplemental Responses to Support Public Teleconference on 4/08. (53 page(s), 4/8/2010)
- ML101040042 - Millstone Power Station, Unit No. 3 - Issuance of Relief Request lR-3-11 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME1263). (8 page(s), 4/29/2010)
- ML101090095 - Press Release-I-10-021: NRC to Hold Open House, Public Meeting on April 22 in Waterford, Conn. to Discuss Annual Assessment of Millstone Nuclear Power Plant. (2 page(s), 4/19/2010)
- ML101100608 - Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2-A, Response to Request for Additional Information. (12 page(s), 4/16/2010)
- ML101130187 - Millstone, Unit 3, ASME Section XI Inservice Inspection Program Relief Request for Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval. (175 page(s), 4/19/2010)
- ML101160284 - IR 05000336-10-002 and 05000423-10-002; on 01/01/2010 - 03/31/2010; Dominion Nuclear Connecticut Inc.; Millstone Power Station Units 2 and 3, NRC Integrated Inspection Report. (28 page(s), 4/26/2010)
- ML101160391 - Millstone Unit 2, Final QA/Related Forms (Folder 1). (8 page(s), 2/24/2010)
- ML101160535 - Request for Dominion to Revise the Application re. Cyber Security Amendment. (3 page(s), 5/21/2010)
- ML101170575 - 04/08/2010-Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information (TAC Nos. MC4694 and MC4695). (5 page(s), 5/5/2010)
- ML101180386 - Approval of the Center for Nuclear Waste Regulatory Analyses' Fiscal Year 2010 Management Plan - Major Milestone 14002.01.011.030. (2 page(s), 4/28/2010)
- ML101180473 - Response to Query on MPS3 Tube Inspection Results. (2 page(s), 4/28/2010)
- ML101190416 - Millstone, Unit 3, Submittal of Supplemental Information on License Amendment Request to Revise Technical Specification 6.8.4.g, "Steam Generator Program," & TS 6.9.1.7, "Steam Generator Tube Inspection Report" for One-Time Alternate Repair Criteria (H). (10 page(s), 4/26/2010)
- ML101190417 - Westinghouse Electric Co., LLC, LTR-SGMP-10-50 NP-Attachment "Assessment of the Effect of the Location of the Bottom of the Expansion Transition on H." (19 page(s), 4/22/2010)
- ML101241166 - Millstone Power Station, Unit 2 and 3 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection. (9 page(s), 5/4/2010)
- ML101241219 - Millstone, Unit 3 - Relief Request IR-3-02 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME1255). (3 page(s), 5/13/2010)
- ML101250043 - LER 10-001-00, for Millstone Power Station, Unit 2, regarding Reactor Trip. (5 page(s), 4/26/2010)
- ML101250623 - 04/20/2010 Summary of Meeting with Dominion Nuclear Connecticut, Inc. (DNC) to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information (TAC Nos. MC4696 and MC4695). (5 page(s), 5/24/2010)
- ML101270439 - Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants. (4 page(s), 5/5/2010)
- ML101300353 - Millstone Power Station, Units 1, 2 & 3 - Submittal of 2009 Radioactive Effluent Release Report. (252 page(s), 4/27/2010)
- ML101310006 - Millstone, Unit 3, Relief Request Number IR-3-05 Supplemental Information Regarding Examination of Weld Overlays. (2 page(s), 5/6/2010)
- ML101310232 - Millstone Power Station, Unit 3 - 2009 Annual Environmental Protection Plan Operating Report. (13 page(s), 4/27/2010)
- ML101310323 - NRC Inspection Report No. 05000245-10-007, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut. (3 page(s), 5/11/2010)
- ML101310341 - IR 05000245-10-008; Dominion Nuclear Connecticut, Inc.; 03/15-16/10; Millstone Power Station (Unit 1), Waterford, CT Inspection Report. (13 page(s), 5/11/2010)
- ML101310608 - Millstone Power Station, Units 1, 2 and 3 - 2009 Annual Radiological Environmental Operating Report. (137 page(s), 4/28/2010)
- ML101320422 - 04/22/2010 Summary of Annual Assessment Open House Public Meeting Regarding Assessment of the Safety Performance of Millstone Power Station for the period of January 1 through December 31, 2009. (3 page(s), 5/12/2010)
- ML101330268 - Millstone, Unit 3 - Core Operating Limits Report, Cycle 14. (28 page(s), 5/6/2010)
- ML101340166 - Acceptance Review: MPS2 Relief Request RR-04-03. (1 page(s), 5/14/2010)
- ML101340174 - Acceptance Review: MPS2 Relief Request RR-04-02. (1 page(s), 5/14/2010)
- ML101370003 - IR 05000245-10-007, on 03/15-16/2010 & 04/12/2010, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut, Transmittal Letter (Corrected Copy). (4 page(s), 5/17/2010)
- ML101370021 - IR 05000245-10-007, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut, Inspection Report (Corrected Copy). (13 page(s), 5/17/2010)
- ML101370050 - 06/07/2010 Forthcoming Conference Call with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit Nos. 2 and 3 Generic Letter 2004-02 Supplemental Responses (TAC Nos. MC4694 and MC4695). (4 page(s), 5/25/2010)
- ML101380042 - Millstone Power Station, Unit 3 - Alternative Request IR-3-12 for the Use of ASME Code Cade N-513-2. (7 page(s), 5/28/2009)
- ML101390172 - G20100272/EDATS: OEDO-2010-0343 - David Collins Ltr. re 2.206 - Prevent Restart of Millstone Power Station, Unit 3 (174 page(s), 6/4/2010)
- ML101410159 - April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council. (26 page(s), 5/21/2010)
- ML101440348 - 05/24/10 Acknowledgement Ltr to A. McNiece re Safety at the Millstone Nuclear Power Station. (1 page(s), 5/24/2010)
- ML101450184 - Fwd: Teleconference Meeting Thursday 20th 1:00PM Broken Barriers and Accidents Lobbyists and Government Regulations. (3 page(s), 5/20/2010)
- ML101450266 - G20100272/EDATS: OEDO-2010-0343 - Response to 2.206 - Prevent Restart of Millstone Power Station, Unit 3 (3 page(s), 6/4/2010)
- ML101460062 - Millstone, Unit 3, Second Report Regarding Lead Test Assembly. (12 page(s), 5/25/2010)
- ML101460098 - Response to 04/28/10 E-mail Regarding Event Involving Electrical Arcing at Millstone, Unit 2 Reactor Shutdown October 2009. (2 page(s), 5/26/2010)
- ML101470099 - Millstone, Unit 3 - Issuance of Relief Request IR-3-05 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix VIII. (12 page(s), 6/11/2010)
- ML101471000 - Acceptance Review Regarding MPS3 RR IR-3-14. (1 page(s), 5/27/2010)
- ML101530556 - MPS GL-04-002 Draft RAI Responses/Public Telecon Handouts. (54 page(s), 6/2/2010)
- ML101540558 - Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3. (3 page(s), 6/11/2010)
- ML101590648 - 06/07/2010 Summary of Meeting with Dominion Nuclear Connecticut, Inc., (DNC) to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information. (5 page(s), 6/30/2010)
- ML101610780 - Acceptance Review Regarding MPS3 RR IR-2-51 - IR-2-60. (1 page(s), 6/10/2010)
- ML101620034 - Approval to Remove Mixing Vane Grid Restriction in Appendix B of Dominion Fleet Topical Report DOM-NAF-2-A. (6 page(s), 6/21/2010)
- ML101620341 - NRC Office of Investigations Case No. 1-2009-034. (3 page(s), 6/11/2010)
- ML101650173 - Acceptance Review Regarding MPS3 RR IR-3-12. (1 page(s), 6/14/2010)
- ML101800008 - Millstone Power Station, Unit Nos. 1, 2 and 3 - Review of Updated Final Safety Analysis Report (TAC Nos. JO0287, ME2581 and ME2582). (5 page(s), 6/30/2010)
- ML101800513 - 07/13/2010-Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response (TAC No. MC4695). (4 page(s), 7/1/2010)
- ML101810435 - Kewaunee, Millstone, Units 2 and 3, North Anna, Units 1 and 2 and Surry, Units 1 and 2, 2009 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (27 page(s), 6/29/2010)
- ML101930460 - List of Historical Leaks and Spills at US Commercial Nuclear Power Plants. (2 page(s), 3/25/2010)
- ML101950284 - 07/28/2010 Notice of Forthcoming Public Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response (TAC No. MC4695). (4 page(s), 7/14/2010)
- ML101950505 - Millstone Unit 3 MPS3 RAI 6. (13 page(s), 7/13/2010)
- ML102010261 - Summary of July 13, 2010, Meeting with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information. (5 page(s), 7/29/2010)
- ML102010293 - LER 09-003-01 for Millstone - Unit 2 Regarding Two Independent Diesel Generators Rendered Inoperable Due to Common Cause. (6 page(s), 7/7/2010)
- ML102010384 - LER 08-005-01 for Millstone, Unit 3 Regarding Containment Penetration Not Fully-Closed During Fuel Movement. (6 page(s), 7/7/2010)
- ML102010413 - Millstone Power Station, Unit 2 - Response to Request for Additional Information re Generic Letter 2004-02. (21 page(s), 7/8/2010)
- ML102090071 - Millstone, Unit 1 - Revised Power Reactor Security Rule. (4 page(s), 8/2/2010)
- ML102140437 - Millstone Power Station, Unit 2 - Generic Letter 2004-02 Supplemental Response (TAC No. MC4694). (3 page(s), 8/10/2010)
- ML102150071 - Millstone, Unit 3, Inservice Inspection Program - Owner's Activity Report. (12 page(s), 7/25/2010)
- ML102160749 - Request for Withholding Information From Public Disclosure for Millstone Power Station, Unit No. 3 (TAC No. ME2978). (4 page(s), 9/22/2010)
- ML102170013 - IR 05000336-10-003, 05000423-10-003 on 04/01/2010 - 06/30/2010 for Millstone Power Station, Unit 2 and 3, Equipment Alignment; Refueling and Other Outage Activities; Identification and Resolution of Problems; Event Follow-up. (59 page(s), 8/5/2010)
- ML102220110 - July 28, 2010, Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information (TAC No. MC4695). (4 page(s), 9/14/2010)
- ML102220527 - Millstone, Unit 2 - Fourth 10-Year Interval Inservice Inspection Program. (124 page(s), 8/5/2010)
- ML102230425 - Kewaunee, Millstone, North Anna and Surry - NRC Regulatory Issue Summary 2010-08 Preparation and Scheduling of Operator Licensing Examinations. (8 page(s), 7/28/2010)
- ML102230444 - Kewaunee & ISFSI, Millstone, Units 1, 2, & 3 & ISFSI, North Anna, Units 1, 2 & ISFSIs and Surry, Units 1, 2 & ISFSIs - SGI and OUO Correspondence Distribution Request. (7 page(s), 7/29/2010)
- ML102240063 - Millstone, Unit 3 - License Amendment Request to Relocate Technical Specification 3/4.7.14, Area Temperature Monitoring. (17 page(s), 7/21/2010)
- ML102240064 - Millstone, Unit 2 - License Amendment Request to Revise Technical Specification 3/4.9.3.1, "Decay Time". (13 page(s), 7/21/2010)
- ML102240069 - Millstone, Unit 3 - Correction to Previously Submitted Correspondence for Cycle 14 Core Operating Limits Report. (28 page(s), 7/29/2010)
- ML102240501 - ME4319-ME4325, Dominion Cyber Security Plan Amendment - Acceptable for Detailed Technical Review. (2 page(s), 8/9/2010)
- ML102310391 - Millstone Power Station, Unit 3 - Special Report for Inoperable Meteorological Tower Wind Speed and Direction Instrumentation. (2 page(s), 8/13/2010)
- ML102310456 - Acceptance Review Regarding MPS2 10-Year ISI Relief Requests. (1 page(s), 8/19/2010)
- ML102310506 - LER 10-003-00 for Millstone Power Station, Unit 3, Secondary Containment Rendered Inoperable Due to Misaligned Dampers. (6 page(s), 7/26/2010)
- ML102310507 - LER 10-002-00, Millstone Power Station, Unit 2 re Manual Reactor Trip on High Steam Generator Water Level. (6 page(s), 7/20/2010)
- ML102390403 - Millstone Units 2 & 3, Changes to Technical Specification Bases. (377 page(s), 8/19/2010)
- ML102390419 - DOM-NAF-2, Rev. 0.2-A, "Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code." (255 page(s), 8/31/2010)
- ML102390421 - North Anna & Surry, Units 1 & 2, Millstone, Units 2 & 3 & Kewaunee, DOM-NAF-2-P/NP, Rev. 0.2-A, "Reactor Core Thermal-Hydraulics Using VIPRE-D Computer Code." (12 page(s), 8/20/2010)
- ML102440580 - Mid-Cycle Performance Review and Inspection Plan 2010 - Millstone Power Station. (5 page(s), 9/1/2010)
- ML102450072 - Kewaunee, Millstone, Units 1, 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, Associated ISFSIs, Submittal of Security Plan, Training & Qualification Plan, Safeguards Contingency Plan & ISFS Security Program, Revision 9. (5 page(s), 8/31/2010)
- ML102460109 - IR 05000336-10-403 & IR 05000423-10-403 on 08/18/10 for Millstone Power Station, Waterford, CT (Transmittal Letter). (4 page(s), 9/3/2010)
- ML102530121 - Letter re: Requalification Program Inspection Millstone Power Station, Unit 2. (4 page(s), 9/10/2010)
- ML102560185 - ME4600 (Dominion Fleet) Proprietary Determination Ltr 2010-09-13. (4 page(s), 9/28/2010)
- ML102570763 - GOTHIC Analysis of Millstone 3 Gas Transport Tests. (1 page(s), 9/1/2010)
- ML102640210 - Millstone, Unit 3 - Response to Request for Additional Information Regarding Generic Letter 2004-02. (24 page(s), 9/16/2010)
- ML102660352 - Millstone Power Station, Units 2 and 3, DOM-NAF-2-P/NP-A, Reactor Core Thermal-Hydraulics Using the Vipre-D Computer Code. (13 page(s), 9/22/2010)
- ML102700607 - Millstone, Unit 3, NRC Notification of Reviewed National Pollutant Discharge Elimination System Permit. (93 page(s), 9/23/2010)
- ML102710558 - Millstone, Unit 3 - Special Report for Inoperable Meteorological Monitoring Instrumentation Channel. (2 page(s), 9/17/2010)
- ML102730207 - Acceptance Review: MPS2 LAR Regarding Decay Time. (1 page(s), 9/30/2010)
- ML102730860 - Millstone, Unit 3 - Extension Request for Resubmittal of Westinghouse Documentation Supporting License Amendment 249, "Changes to the Steam Generator Inspection Scope & Repair Requirements". (2 page(s), 9/30/2010)
- ML102780086 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-89-68 Regarding Use of American Society of Mechanical Engineering Code Case N-722-1 (TAC No. ME2309). (7 page(s), 10/27/2010)
- ML102790114 - IR 05000336-10-403 and IR 05000423-10-403, Millstone Power Station (Units 2 and 3), Waterford, CT, Correction Letter. (2 page(s), 10/5/2010)
- ML102790248 - IR 05000336-10-403, 05000423-10-403 on 08/18/10 for Millstone Power Station, Waterford, CT. (4 page(s), 10/4/2010)
- ML102790475 - Acceptance Review: MPS3 LAR Regarding Area Temperature Monitoring. (1 page(s), 10/6/2010)
- ML102850435 - Millstone, Unit 2 Resubmittal of Westinghouse Documentation Supporting License Amendment 249, "Changes to the Steam Generator Inspection Scope and Repair Requirements. (7 page(s), 10/7/2010)
- ML102850438 - Attachments 2, 3, 5, 7, 8 & 9, to 10-579A, Westinghouse Electric Co. LLC, WCAP-17071-NP, "H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)," Revision 2, Dated September 2010. (480 page(s), 9/30/2010)
- ML102861810 - Kewaunee, Millstone, Units 1, 2 & 3, North Anna, Units 1 & 2 and Surry , Units 1 & 2 - Associated ISFSIs, Submittal of Security, Training and Qualification Plan, Safeguards Contingency Plan & ISFSI Security Program, Rev. 10. (5 page(s), 10/4/2010)
- ML102930350 - Preliminary Discussion with Millstone. (2 page(s), 10/20/2010)
- ML102940440 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-04-02 Regarding Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel (TAC No. ME3691). (8 page(s), 12/3/2010)
- ML102940492 - Millstone Power Station, Unit No. 3 - Request for Additional Information Regarding the Update to the Risk Informed Inspection Program for the Third 10-Year Inspection Interval (TAC ME3528). (6 page(s), 11/29/2010)
- ML102950145 - Clarification for Relief Request RR-04-06. (1 page(s), 10/22/2010)
- ML102950281 - Part 21 Notification - Crack Indications in Marathon Control Rod Blades. (8 page(s), 10/20/2010)
- ML103010558 - Millstone Power Station, Units 2 & 3 - Target Set Inspection 05000336-10-201 & 05000423-10-201. (4 page(s), 10/29/2010)
- ML103020470 - Millstone Power Station, Unit No. 3 - Request for Additional Information Regarding Second 10-Year Interval Inservice Inspection Program Relief Requests (TAC Nos. ME3809, ME3810, ME3811, ME3812, ME3813, ME3814, ME3815, ME3816, ME3817, and ME3818). (8 page(s), 11/29/2010)
- ML103070124 - LER 10-004-00, for Millstone Power Station, regarding Inoperable Turbine Driven Auxiliary Feedwater Pump Due to Degraded Relief Valve. (6 page(s), 10/19/2010)
- ML103070497 - IR 05000336-10-004, on 05000423-10-004, on 07/01/2010-09/30/2010, Millstone Power Station Unit 2 and Unit 3, Identification and Resolution of Problems, Event Follow-up. (52 page(s), 11/3/2010)
- ML103090022 - IR 05000423-10-011, on 07/19/2010-09/22/2010, Millstone Power Station, Unit 3, Fire Protection (Letter Only). (4 page(s), 11/4/2010)
- ML103090613 - IR 05000336-10-008, 05000423-10-008, and 05000336-10-009, on 07/19/2010 - 09/22/2010, Millstone Power Station, Units 2 and 3, Triennial Fire Protection and Millstone Power Station, Unit 2; Temporary Instruction 2515/181 Inspection. (43 page(s), 11/5/2010)
- ML103120114 - Senior Reactor and Reactor Operator Initial Examinations - Millstone Unit 2. (4 page(s), 11/8/2010)
- ML103120242 - 11/18/2010 Notice of Teleconference with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station, Unit No. 3 Generic Letter 2004-02 Supplemental Response (TAC No. MC4695). (4 page(s), 11/8/2010)
- ML103130038 - Millstone, Unit 3 - End of Cycle 13 Steam Generator Tube Inspection Report. (26 page(s), 10/28/2010)
- ML103130418 - IR 05000336-10-402 & 05000423-10-402, on 08/16/2010 - 09/28/2010, Millstone Power Station, Units 2 and 3 - NRC Security Inspection Report Preliminary Greater than Green Finding. (7 page(s), 11/9/2010)
- ML103160422 - Kewaunee, Millstone, North Anna, Surry Scope of Systems Clarification. (5 page(s), 11/10/2010)
- ML103210040 - B. Watson Memo re: Summary of November 1, 2010 Meeting with Millstone on 73.55 Compliance. (3 page(s), 11/19/2010)
- ML103230004 - Millstone Power Station Unit 3 Withdrawal of Alternative Request IR-3-12 for the Use of ASME Code Case N-513-2. (2 page(s), 11/18/2010)
- ML103230045 - Millstone, Unit 2 - Withdrawal of Relief Request RR-04-03 for the Use of ASME Code Case N-513-2. (2 page(s), 11/18/2010)
- ML103230380 - Millstone Power Station, Unit No. 3 - Withdrawal of Relief Request IR-3-12 Regarding the Use of American Society of Mechanical Engineering Code Case N-513-2 (TAC No. ME3932). (2 page(s), 11/22/2010)
- ML103230557 - Millstone Power Station, Unit No. 2 Withdrawal of Relief Request RR-04-03 Regarding the Use of American Society of Mechanical Engineering Code Case N-513-2 (TAC No. ME3692). (2 page(s), 12/2/2010)
- ML103270357 - Dominion Fleet (Kewaunee, Millstone 2 & 3, North Anna 1 & 2, Surry 1 & 2) Nuclear Plants – Email - Cyber Security Plan (License Amendment (TAC NO. ME4319, ME4320,4321, ME4322, 4323, AND ME4324, 4325). (2 page(s), 11/22/2010)
- ML103300048 - Millstone Power Station Unit 2, Independent Spent Fuel Storage Installation, Submittal of Cask Registration for Spent Fuel Storage. (3 page(s), 11/15/2010)
- ML103330550 - Millstone Power Station, Unit No. 3 - Potential Notice Of Enforcement Discretion For The Turbine Driven Auxiliary Feedwater Pump (TAC No. ME4543). (2 page(s), 12/15/2010)
- ML103340357 - IR 05000336-10-502, 05000423-10-502, on 10/18/2010-10/22/2010, Millstone Power Station, Units 2 and 3, Emergency Preparedness Exercise Report. (10 page(s), 11/30/2010)
- ML103340497 - LER 10-002-00 for Millstone, Unit 3, Regarding Automatic Reactor Trip on Lo Lo Steam Generator Level. (6 page(s), 7/15/2010)
- ML103370002 - Millstone, Unit 1 - Decommissioning Trust Fund Disbursement, Thirty-Day Written Notification. (3 page(s), 12/1/2010)
- ML103400155 - Anomaly Discovered on Rosemount Model 1152 Differential Pressure Transmitters with Output Code "L" 10-50 mA Electronics. (34 page(s), 12/2/2010)
- ML103410111 - Millstone, Unit 1, 2008 Decommissioning Cost Update. (3 page(s), 12/1/2010)
- ML103410252 - Millstone, Unit 2 - Reply to a Notice of Violation EA 10-175, Inspection Report 05000336-10-008. (8 page(s), 12/6/2010)
- ML103420582 - 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1. (120 page(s), 6/23/2009)
- ML103430127 - Letter to Mr. David Heacock re: Millstone - Unit 1 - Request for Withholding Information from Public Disclosure, Submittal of Proprietary and Non-Proprietary Information on 2008 Decommissioning Cost Update. (4 page(s), 12/20/2010)
- ML103470588 - Millstone, Unit 2: Reactor Pressure Vessel Head Leak-Off Line. (1 page(s), 12/13/2010)
- ML103470650 - Millstone 3 Draft Response to GL2004-02 RAI No. 6. (25 page(s), 12/13/2010)
- ML103480106 - Millstone, Unit 1 - Response to Revised Power Reactor Security Rule Request for Exemption from 10 CFR 73.55. (2 page(s), 12/9/2010)
- ML103480762 - November 8, 2010 Summary of Teleconference w/ DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information (TAC No. MC4695). (4 page(s), 1/12/2011)
- ML103490464 - Millstone Power Station, Unit 3, Reply to a Notice of Violation EA 10-227, Inspection Report 05000423-10-011. (2 page(s), 12/6/2010)
- ML103510320 - Millstone Power Station, Unit No. 2 - 30-Day Report of Emergency Core Cooling System Model Change (TAC No. ME4273). (3 page(s), 12/20/2010)
- ML103550446 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-04-06 Regarding Use of Performance Demonstration Initiative Qualified Procedures, Personnel and Equipment (TAC No. ME4474). (7 page(s), 1/18/2011)
- ML103550487 - Millstone, Unit 3, Relief Request IR-3-14 Response to Request for Additional Information Regarding Update to the Risk-Informed Inservice Inspection Program for the Third 10-Year Inspection Interval. (11 page(s), 12/16/2010)
- ML103560111 - IR 05000336-10-010, 05000423-10-010, on Millstone Power Station, Units 2 and 3, Engineering Specialist Plant Modifications Inspection. (23 page(s), 12/22/2010)
- ML103570323 - Meeting Notice - Millstone Power Station Units 2 and 3, on January 6, 2011. (5 page(s), 12/23/2010)
- ML103620562 - Millstone, Unit 3, Remaining Response to Request for Additional Information Regarding Generic Letter (GL) 2004-02. (24 page(s), 12/20/2010)
- ML103640257 - Millstone Power Station, Unit 2 - Issuance of Relief Request RR-04-08 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC ME4476). (8 page(s), 1/18/2011)
- ML110070175 - Request for Technical Assistance on Request for Exemption form Certain Requirements of 10 CFR 73.55 for Millstone Power Station, Unit 1. (3 page(s), 1/11/2011)
- ML110070530 - Millstone Power Station Response to NRC Inspection Reports 05000336-10-008 and 05000423-10-011, dated January 6, 2011. (2 page(s), 1/6/2011)
- ML110070642 - Millstone: NRC Office of Investigations Case No. 1-2009-052. (3 page(s), 1/6/2011)
- ML110140343 - Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates. (4 page(s), 1/14/2011)
- ML110140357 - NRC Investigation Report No. 1-2010-024 and 1-2010-028; Millstone Power Station. (5 page(s), 1/14/2011)
- ML110180091 - 02/01/11 Notice of Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station Licensing Activities. (4 page(s), 1/19/2011)
- ML110250259 - Millstone, Unit 3 - Request for Additional Information Regarding Relief Requests For Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval. (26 page(s), 1/20/2011)
- ML110270149 - Millstone Power Station, Unit 2 - Request for Additional Information Regarding Examination Criteria for Weld Overlays (TAC No. ME4475). (4 page(s), 2/14/2011)
- ML110280208 - Millstone, Unit 3, License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, "Steam Generator (SG) Program," and TS 6.9.1.7, "Steam Generator Tube Inspection Report" for Temporary Alternate Repair Criteria (H*). (31 page(s), 1/20/2011)
- ML110280213 - WCAP-17330-NP, Revision 0, "H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5)." (132 page(s), 11/30/2010)
- ML110310682 - 02/15/2011 - Revised Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station Licensing Activities. (4 page(s), 2/1/2011)
- ML110330330 - Final Significance Determination for a Security-Related Green Finding [NRC Inspection Report Nos. 05000336/2011403; 05000423/2011403] - Millstone Nuclear Power Station. (4 page(s), 2/1/2011)
- ML110341619 - D. Heacock ltr. re: Change in NRC Staff Project Manager for Millstone Power Station Unit 1. (1 page(s), 2/8/2011)
- ML110380130 - IR 05000336/201005, 05000423/2010005; 10/1/2010-12/31/2010; Millstone Power Station Unit 2 and Unit 3; Event Follow-up, Other Activities (43 page(s), 2/7/2010)
- ML110390483 - LER 10-002-00 for Millstone, Unit 2 Regarding Reactor Trip on Low Condenser Vacuum. (6 page(s), 1/27/2011)
- ML110390664 - Request for Withholding Information From Public Disclosure for Millstone Power Station, Unit No. 3 (TAC No. ME2978). (5 page(s), 2/28/2011)
- ML110450178 - Kewaunee, Millstone, Units 1, 2 & 3, and North Anna, Units 1 & 2 - Nuclear Property Insurance Coverage. (3 page(s), 2/14/2011)
- ML110450583 - Millstone, Units 1, 2 & 3, North Anna & Surry, Units 1 & 2 - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue. (42 page(s), 2/10/2011)
- ML110530367 - Press Release-I-11-003: NRC Begins Special Inspection at Millstone Unit 2 Nuclear Plant. (1 page(s), 2/22/2011)
- ML110540393 - Millstone Power Station, Unit Nos. 2 and 3 - Closeout of Generic Letter 2008-01,"Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray System" (TAC NOS. MD7845 and MD7846). (4 page(s), 3/2/2011)
- ML110550478 - Millstone, Units 1, 2, and 3, North Anna, Units 1 and 2, and Surry, Units 1 and 2 - Acceptance Review of Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue, 10 CFR 26. (1 page(s), 2/24/2011)
- ML110600734 - Kewaunee, Unit 1, Millstone, Units 1, 2 & 3, Surry, Units 1 & 2, North Anna, Units 1 & 2, Submittal of Fitness-For-Duty Program, Annual Performance Data Report for 2010. (31 page(s), 2/28/2011)
- ML110610207 - Millstone, Unit 2, Relief Request RR-04-07: Response to Request for Additional Information Regarding Proposed Alternative for Examination Criteria of Weld Overlays. (5 page(s), 3/1/2011)
- ML110610365 - Acceptance Review: MPS3 SG Temporary ARC. (1 page(s), 3/2/2011)
- ML110620174 - Annual Assessment Letter for Millstone Power Station Unit 2 and Unit 3 (Report 05000336/2010001 and 05000423/2010001). (5 page(s), 3/4/2011)
- ML110630359 - Kewaunee, Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan. (6 page(s), 3/7/2011)
- ML110630401 - Millstone Power Station-NRC Emergency Preparedness Annual Inspection Report Nos. 05000336-10-501 and 50500423-10-501; NRC Security Annual Inspection Report Nos. 05000336-10-401 and 05000423-10-401. (4 page(s), 3/3/2011)
- ML110660110 - Millstone, Units 2 and 3 - Notification of Project Manager Assignment. (2 page(s), 3/10/2011)
- ML110700161 - E-Mail: Draft MPS2 RAIs RR-04-05. (1 page(s), 3/10/2011)
- ML110700507 - Millstone Power Station, Unit 2 - Request for Additional Information Regarding Pressure Testing Requirements for Service Water System Buried Piping Systems (TAC No. ME4472). (3 page(s), 3/16/2011)
- ML110700585 - Request for Additional Information Relief Request RR-04-05 Use of Alternative Pressure Testing Requirements for Service Water System Buried Piping Segments. (2 page(s), 3/10/2011)
- ML110750440 - February 15, 2011, Millstone Public Meeting Summary. (1 page(s), 3/15/2011)
- ML110750462 - Millstone Self Assessment Summary. (1 page(s), 3/15/2011)
- ML110750573 - Draft - Summary of February 15, 2011, Meeting with Dominion Nuclear Connecticut, Inc. Discussing Millstone Power Station, Unit Nos. 2 and 3 Licensing Activities. (7 page(s), 3/15/2011)
- ML110810752 - E-mail for Draft RAIs for Millstone Unit 2 RR-04-04. (3 page(s), 3/22/2011)
- ML110811179 - Draft RAI RR-04-04 - Use of Alternative Pressure Testing Criteria for the System Leakage Test Conducted at or Near the End of the Inspection Interval on Class 1 Piping Millstone Power Station, Unit No. 2. (2 page(s), 3/22/2011)