Home > NRC Library > ADAMS Public Documents
FOIA/PA-2008-0046 - Resp 1 - Partial.
Accession Number: ML080240390
Date Released: Monday, February 4, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML080390543 - FOIA/PA-2008-0046 - Resp 1 - Partial. (10 page(s), 1/10/2008)
- ML003721347 - SUBMITTAL OF CROSSFLOW TOPICAL REPORT "-A" APPROVED VERSION (6 page(s), 6/2/2000)
- ML003721447 - SUBMITTAL OF CROSSFLOW TOPICAL REPORT "-A" APPROVED VERSION {ENCLOSURE CONTAINS PROPRIETARY INFORMATION} (6 page(s), 6/2/2000)
- ML020230131 - Description of CrossflowXT Ultrasonic Flow Measurement System (Enclosure 1-P Contains Westinghouse Proprietary Class 2 Material). (11 page(s), 1/18/2002)
- ML032170565 - Extension of Crossflow Signal Conditional Unit Re-Calibration Period. (9 page(s), 7/31/2003)
- ML032720938 - Westinghouse - Affidavit & Non-Proprietary Meeting Slides - Crossflow root cause meeting September 26, 2003 (TAC No. MB1365). (44 page(s), 9/15/2003)
- ML032521438 - Westinghouse - Technical Bulletin TB-03-6 , Crossflow Ultrasonic Flow Measurement System SIgnal Issues, dtd 09/05/2003. (4 page(s), 9/5/2003)
- ML033421289 - Westinghouse - NSAL 03-12 - 12/05/03 Crossflow Ultrasonic Measurement System. (7 page(s), 12/5/2003)
- ML040350592 - CROSSFLOW Ultrasonic Flow Measurement System, X-Beam Modification (Proprietary/Non-Proprietary). (9 page(s), 2/2/2004)
- ML041840089 - Westinghouse Review of Information Contained in NRC Letter and Attachment Regarding the Westinghouse/AMAG CROSSFLOW Ultrasonic Flow Meter (Proprietary Final Report). (1 page(s), 6/29/2004)
- ML041840090 - Westinghouse Review of Information Contained in NRC Letter and Attachment Regarding the Westinghouse/AMAG CROSSFLOW Ultrasonic Flow Meter (Proprietary Final Report) - Attachment 1. (1 page(s), 6/29/2004)
- ML043000155 - Westinghouse Owners Group - Comparison of CROSSFLOW and ASME Flow Section Feedwater Flow Measurement at Kewaunee Nuclear Power Plant. (8 page(s), 10/20/2004)
- ML043520132 - Westinghouse Owners Group - Assurance that CROSSFLOW Technology, Installation, and Operation Maintain Design and Licensing Basis (Proprietary.) (27 page(s), 12/10/2004)
- ML052070341 - Westinghouse Owners Group - Cover Letter and Affidavit - Information Copy of CROSSFLOW Ultrasonic Flow Meter User Guidelines - WCAP-16437-P (TAC No. MC1913). (10 page(s), 7/19/2005)
- ML052560455 - Westinghouse - NON-Proprietary Meeting Slides 9/12/05, CROSSFLOW (TAC No. MC1913) (34 page(s), 9/12/2005)
- ML061010244 - LTR-NRC-06-13 NP-Attachment "CROSSFLOW Ultrasonic Flow Measurement System - NRC Status Meeting," March 29, 2006, Rockville, MD. (54 page(s), 3/29/2006)
- ML061510102 - Presentation Materials Used at April 28, 2006 CROSSFLOW Meeting. (7 page(s), 5/24/2006)
- ML061570128 - "Projected Content for CROSSFLOW Topical Report Revision" (Proprietary/Non-proprietary). (7 page(s), 5/30/2006)
- ML061570129 - CENPD-397-P-A, Rev. 1, Project Content for Crossflow Topical Report Revision. (11 page(s), 5/31/2006)
- ML061570162 - LTR-PS-06-24 NP-Attachment Statistical Comparison of CROSSFLOW Test Data to Other High Precision Flow Instrumentation. (22 page(s), 5/31/2006)
- ML061570145 - LTR-NRC-06-35 NP-Attachment, "CROSSFLOW Ultrasonic Flow Measurement System Standard and Non-Standard Installations." (7 page(s), 5/31/2006)
- ML061570114 - IR 03012795-06-001, on 05/23/26, Intermet-Archer Creek Foundry, Lynchburg, VA, Form 591M Part 1. (1 page(s), 5/23/2006)
- ML061570161 - Statistical Comparison of CROSSFLOW Test Data to Other High Precision Flow Instrumentation (Proprietary/Non-proprietary). (7 page(s), 6/1/2006)
- ML061570168 - Transmittal of Applied Research Laboratory/Pennsylvania State University Investigations Concerning the CROSSFLOW Technology (Proprietary). (7 page(s), 6/1/2006)
- ML061580091 - Transmittal of Response to NRC Draft Status Report on CROSSFLOW Ultrasonic Flowmeter (Proprietary). (7 page(s), 6/2/2006)
- ML040350598 - WCAP-16163-NP, Revision 0, "Improved Flow Measurement Accuracy Using Crossflow Ultrasonic Flow Measurement Technology." (20 page(s), 1/31/2004)
- ML071280797 - Discussion of the CROSSFLOW Ultrasonic Flow Measurement System Topical Report Safety Evaluation. (25 page(s), 5/1/2007)
- ML071280804 - CROSSFLOW Utility Users' Perspective on NRC Review. (3 page(s), 5/1/2007)
- ML071580119 - Proposed Alternate Approach to Complete Suspension of CROSSFLOW Topical Report Approval. (9 page(s), 6/4/2007)
- ML071770313 - Y20070139 - Proposed Alternate Approach to Complete Suspension of Crossflow Topical Report Approval. (11 page(s), 6/4/2007)
- ML080250137 - Flow Error Calculation Explanation. (1 page(s), 1/10/2008)
- ML080250151 - Byron Unit 1, Graphs. (3 page(s), 1/10/2008)
- ML080250161 - An AMAG Analogy - Attachment 1. (5 page(s), 1/10/2008)
- ML080250168 - AMAG Time Line. (1 page(s), 1/10/2008)
- ML080250179 - Perform Disposition Review of RIS 2007-24. (8 page(s), 1/10/2008)
- ML080250184 - AMAG Loop Corrosion Factor vs. date for Byron Unit 2. (1 page(s), 1/10/2008)
- ML080250190 - AMAG Corrosion Factor for Reactor Coolant loop vs. Date for Byron Unit 1. (1 page(s), 1/10/2008)
- ML080250196 - AMAG Feedwater Measurement Primer. (11 page(s), 1/10/2008)
- ML080250209 - Apparent Cause Evaluation Quality Checklist. (1 page(s), 1/10/2008)
- ML080250444 - RIS 2007-24 AMAG/Crossflow Issue. (16 page(s), 1/10/2008)
- ML080250452 - Licensee Analysis Report. (36 page(s), 1/10/2008)
- ML080250465 - 10 CFR 50.59 Safety Evaluation Form Tracking No. 6G-00-0079 Rev. 1 for Byron Units 1 & 2. (27 page(s), 12/27/1999)
- ML080250471 - 10 CFR 50.59 Safety Evaluation Form Tracking No. 6G-00-0079 for Byron Units 1 & 2. (23 page(s), 12/27/1999)
- ML080250475 - AR 00659060, "Trending on Unit 1 FW Flow Ratio." (5 page(s), 8/9/2007)
- ML080250480 - Byron, Units 1 and 2 - Startup Report for Mid-Cycle Power Uprate. (19 page(s), 8/8/2001)
- ML080250484 - AR 00091771, "Unexplained Differences Between Byron & Braidwood." (49 page(s), 1/22/2002)
- ML080250485 - AR 00091771 "Unexplained Differences Between Byron & Braidwood." (4 page(s), 1/22/2002)
- ML080250488 - Apparent Cause Evaluation Content. (2 page(s), 9/13/2002)
- ML080250489 - E-mail From P. Rebstock to M. Chawla Re: ByronTP: Bases for Concern Regarding Byron Thermal Power Operating Point. (4 page(s), 1/8/2003)
- ML080280114 - Letter from J. Zwolinski to J. Skolds dated 1/22/03, Re: Licensed Thermal Power - Byron Station, Unit 1. (4 page(s), 1/22/2003)
- ML080280123 - Byron, Thermal Power Measurement. (7 page(s), 1/24/2003)
- ML080280154 - Byron Station, Unit 1, Licensed Thermal Power Limit Verification. (18 page(s), 2/5/2003)
- ML080280164 - 01/24/2003 Summary of Meeting with Exelon Generation Company, LLC., Byron Station, Unit 1 to Discuss the License Power Limit. (4 page(s), 2/26/2003)
- ML080280172 - Agenda for Steve Reynold's Visit to Byron. (2 page(s), 3/10/2003)
- ML080280174 - Licensed Thermal Power, Byron Station, Unit 1 - Request for Additional Information. (5 page(s), 7/8/2003)
- ML080280176 - Byron, Unit 1, Licensed Thermal Power Limit Verification. (3 page(s), 8/11/2003)
- ML080280180 - Timeline on Byron Thermal Power Issue from P. Lougheed (RIII) to A. Stone (RIII), et al. (1 page(s), 8/20/2003)
- ML080280186 - Byron, Unit 1, Power/AMAG Issue Update from P. Snyder (NRR) to A. Stone (RIII), et al. (1 page(s), 8/27/2003)
- ML080280190 - U1 Overpower? from P. Snyder (RIII) to A. Stone (RIII). (1 page(s), 8/28/2003)
- ML080280317 - Re: U1, Overpower? from A. Stone (RIII) to Branch Inspectors (RIII). (1 page(s), 8/28/2003)
- ML080280328 - Event Number: 40117. (1 page(s), 8/29/2003)
- ML080280333 - Bwd AMAG-addtl Info from N. Shah (RIII) to A. Stone (RIII), et al. (1 page(s), 9/2/2003)
- ML080280336 - Email from P. Snyder (RIII) to N. Shah (RIII), Subject: Re: Bwd AMAG-addtl Info. (1 page(s), 9/2/2003)
- ML080280341 - Byron Overpower?/Westinghouse Letter NSAL 03-6 from P. Snyder (NRR) to A. Stone (RIII), et al. (1 page(s), 9/3/2003)
- ML080280349 - TB-03-00, CROSSFLOW Ultrasonic Flow Measurement System Signal Issues from charles.m.molnar@us.westinghouse.com to bjb@dnrc.qov, et al, No Attachment. (1 page(s), 9/5/2003)
- ML080280356 - CROSSFLOW Ultrasonic Flow Measurement System Signal Issues. (4 page(s), 9/5/2003)
- ML080280367 - 09/18/2003 Notice of Public Meeting With Exelon Generation Co., LLC., to Discuss Concerning Byron, Units 1 Thermal Power Issue. (6 page(s), 9/9/2003)
- ML080280377 - FWD: OR Events Prebriefing/Briefing - September 16 & 17, 2003 from A. Stone (RIII) to Branch Inspectors (RIII). (1 page(s), 9/11/2003)
- ML080280400 - Byron Station Thermal Power Measurement. (30 page(s), 9/18/2003)
- ML080390544 - Braidwood/Byron AMAG Investigation of Organizational Effectiveness and Decision Making. (35 page(s), 9/22/2003)
- ML080280598 - FYI: New Westinghouse NSAL from Nirodh Shah (RIII) to R. Skokowski (RIII), P. Snyder (NRR). (1 page(s), 10/16/2003)
- ML080280580 - Assignment Report 00173510 CAPR to Revise Procedure and Initiate New Procedure. (2 page(s), 10/17/2003)
- ML080280585 - Public Meeting to Discuss Operation Above the Licensed Thermal Power Limits at the Byron Station. (6 page(s), 10/20/2003)
- ML080280591 - Re: Information you Requested During Friday's Visit from A. Stone (RIII) to R. Skokowski (RIII), et al. (1 page(s), 10/28/2003)
- ML080280594 - Byron Public Meeting Notice. (6 page(s), 11/18/2003)
- ML080280603 - NRC Question, Regarding AMAG Common Header Installation. (2 page(s), 12/12/2003)
- ML080280606 - CR 19852 - AMAG-Westinghouse Letter CAE-03-107 Not Accurate. (3 page(s), 12/23/2003)
- ML080280611 - Email from A. Stone (RIII) to S. Ray (RIII) Subject: Re: AMAG Status at Braidwood. (1 page(s), 12/29/2003)
- ML080280613 - Email from A. Stone (RIII) to Peter Snyder; R. Skokowski (RIII), Subject: Followup from Visit. (1 page(s), 1/14/2004)
- ML080290157 - Email from Ann Marie Stone (RIII) to Richard Skokowski (RIII) Subject: Re: Follow Up from Visit. (1 page(s), 1/14/2004)
- ML080290164 - Email from G. Dick (NRR) to R. Skokowski (RIII) Fwd: Conference Call with IEMA re: AMAG Issues at Byron and Braidwood. (1 page(s), 1/28/2004)
- ML080290239 - AR 00678322: NRC Suspends Topical Report for Use of CROSSFLOW (AMAG). (2 page(s), 10/1/2007)
- ML080290187 - 50.59 on Sodium Tracer Test E-mail From S. Ray (RIII) to R. Skokowski (RIII), et al. (1 page(s), 1/30/2004)
- ML080290202 - Byron Bulletin: Feedwater Tracer Test Planned with Safety as Top Priority. (2 page(s), 2/4/2004)
- ML080290206 - AR 00200745 - Feedwater Flow Tracer Test Preliminary Results. (6 page(s), 2/10/2004)
- ML080290218 - AMAG at Braidwood from S. Ray (RIII) to Skokowski, R. (RIII), et al. (1 page(s), 2/10/2004)
- ML080290222 - Re: AMAG at Braidwood from A. Stone (RIII) to G. Dick (NRR), et al (1 page(s), 2/10/2004)
- ML080290229 - AMAG at Braidwood from P. Snyder to S. Ray. (1 page(s), 2/10/2004)
- ML080290231 - Westinghouse Technical Bulletin: Information Regarding Recent CROSSFLOW Ultrasonic Flow Measurement System Performance Observations, TB-04-4. (5 page(s), 2/12/2004)
- ML080290369 - Actions from Initial Byron Tracer Test Results. (2 page(s), 2/17/2004)
- ML080290372 - Re: Review of Exelon's Implementation of the AMAG UFMs from G. Dick. (2 page(s), 2/23/2004)
- ML080290375 - Latest on AMAG at Braidwood. (1 page(s), 2/24/2004)
- ML080290381 - Re: Latest at AMAG at Braidwood from A. Stone (RIII) to C. Pederson. (1 page(s), 2/24/2004)
- ML080290388 - Unit 2 FW Flow Indication as a Result of 1996 AMAG Cal Test. (3 page(s), 2/24/2004)
- ML080290393 - Synopsis of PORC Review of FW Tracer Test Results. (1 page(s), 2/26/2004)
- ML080290408 - Supplemental One to Licensee Event Report (LER) 454-2003-003-00, "Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination". (5 page(s), 3/31/2004)
- ML080290415 - Letter from Chris Crane, Exelon Chief Nuclear Officer to Exelon Employees, dated 4/8/04, "INPO Classifies Overpower Condition as Significant,". (1 page(s), 4/8/2004)
- ML080290422 - Y020040131 - Westinghouse Conclusions Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Events. (4 page(s), 6/18/2004)
- ML080290426 - FYI: Palo Verde's UFM Problem. (2 page(s), 7/15/2004)
- ML080290611 - Fwd: FYI: Palo Verde's UFM Problem from G. Dick (NRR) to P. Snyder (NSIR). (1 page(s), 7/16/2004)
- ML080290617 - UFM Saga Continues... From P. Snyder to G. Dick (NRR), et al. (1 page(s), 7/16/2004)
- ML080290621 - Email from S. Shields (NRR) to OPEX Daily Report - Braidwood, et al, Subject: DIER - Daily Industry Event Report for Monday, July 19, 2004. (1 page(s), 7/16/2004)
- ML080290627 - Closeout of TIA on Byron 1 Overpower from George Dick (NRR) to Rich Skokowski (RIII). (1 page(s), 11/24/2004)
- ML080390545 - Closure Memo for Byron Overpower Issue. (2 page(s), 12/23/2004)
- ML080290655 - Email from D. Passehl (RIII) to R. Skokowski (RIII); Subject: 01 Report 3-2003-034 Byron (Unsubstantiated). (1 page(s), 1/11/2005)
- ML080290662 - Re: Do you have any violations drafted on the AMAG issue at Byron? from: A. Stone (Rill) to D. Passehl (Rill). (1 page(s), 2/28/2005)
- ML080290666 - Fwd: Re: Do You have Any Violations Drafted on the AMAG Issue at Byron? from D. Passehl to R. Skokowski. (1 page(s), 3/1/2005)
- ML080290669 - Email from Dave Passehl (RIll) to Thomas Tongue (RIIl); Subject: Tom, please check the allegation files on the AMAG issue for draft NCV writeups. (1 page(s), 3/7/2005)
- ML080290674 - EA-ELEC08-001, Rev. 12, "Uncertainty Calculation for Secondary Calorimetric Heat Balance." (23 page(s), 4/12/2005)
- ML080300231 - Re: AMAG from Nirodh Shah (RIll) to Richard Skokowski (RIll). (1 page(s), 4/27/2005)
- ML080300239 - Application for Withholding Proprietary Information from Public Disclosure, Supporting Material for NRC Meeting Regarding Crossflow Ultrasonic Flow Measurement System Status. (6 page(s), 8/18/2005)
- ML080300249 - CA023795 GAP Analysis Needed for AMAG CROSSFLOW User Guidelines. (10 page(s), 5/18/2006)
- ML080300254 - CA023796 GAP Analysis Needed for AMAG CROSSFLOW User Guidelines. (4 page(s), 5/18/2006)
- ML080300260 - Caldon Experience in Nuclear Feedwater Flow Measurement. (23 page(s), 8/30/2006)
- ML080300263 - CA027407 Due to AMAG Accuracy Concerns, Reactor Power Should be Limited to 99.7%. (2 page(s), 10/18/2006)
- ML080300268 - Email from N. Shah (RIll) to D. Kimble, et al (RIII), Subject: Jim C. is interested in LaSalle flowrate and Bwd/By AMAG background info with attachment (Attachment has excerpts from multiple documents). (10 page(s), 2/1/2007)
- ML080300283 - CAP048767 "Feedwater correction factor not able to be updated." (2 page(s), 4/2/2007)
- ML080300293 - CAP048900 "Feedwater correction factor cannot be put into service." (1 page(s), 4/7/2007)
- ML080300298 - CAP050122 - P-1 check at 75% power exceeded mismatch limits in 2 of the 5 calculations. (89 page(s), 6/1/2007)
- ML080300395 - AR 676460, "Caldon/FW Ratio Reaches 0.999," (4 page(s), 9/27/2007)
- ML080300402 - NRC Regulatory Issue Summary 2007-24, "NRC Staff Position on Use of the Westinghouse Crossflow Ultrasonic Flow Meter for Power Uprate or Power Recovery." (5 page(s), 2/27/2007)
- ML080300409 - Email from Caldwell to Anne Boland et al Re: Fwd: Press Release - NRC Publishes Regulatory Issue Summary on Feedwater Flow Meter Issues. (4 page(s), 9/27/2007)