Home > NRC Library > ADAMS Public Documents
FOIA/PA-2003-0018 - Resp 1 - Partial.
Accession Number: ML030920050
Date Released: Thursday, February 13, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML030850175 - FOIA/PA-2003-0018 - Resp 1 - Partial. (13 page(s), 2/5/2003)
- ML021440452 - Transmittal of Davis-Besse Nuclear Power Station Risk Assessment of Control Rod Drive Mechanism Nozzle Cracks. (18 page(s), 11/1/2001)
- ML021070811 - Davis-Besse NRC Augmented Inspection Team Exit Meeting Slides - April 5, 2002 (21 page(s), 4/5/2002)
- ML021130029 - Davis-Besse Confirmatory Action Letter Response - Root Cause Analysis Report. (184 page(s), 4/18/2002)
- ML021230320 - FirstEnergy Nuclear Operating Company Responses to NRC Questions on the Preliminary Probable Cause Summary Report Dated March 22, 2002. (12 page(s), 4/30/2002)
- ML021340306 - Sensitivity Study of PWR Reactor Vessel Breaks. (12 page(s), 5/10/2002)
- ML021430409 - Supplemental Information in Resonse to NRC Question Number 24 on the preliminary Probable Cause Summary Report dated March 22, 2002. (23 page(s), 5/15/2002)
- ML021750219 - FENOC - Confirmatory Action Letter: Response to Request for Additional Information Related to Davis-Besse Safety Significance Assessment. (16 page(s), 6/12/2002)
- ML021860072 - Technical Basis for RPV Upper Head Penetration Inspection Plan (22 page(s), 6/20/2002)
- ML021750035 - Davis-Besse, Unit 1, RAI, Safety Significance Assessment, Reactor Pressure Vessel Head Degradation. (5 page(s), 6/24/2002)
- ML022030457 - FirstEnergy Nuclear Operating Co., Response to 06/24/2002 Staff Request for Additional Information re: Davis-Besse Nuclear Power Station Safety Significance Assessment. (49 page(s), 7/12/2002)
- ML022040177 - Attachment to 7/24/2002 meeting summary for reactor vessel head and penetration inspection plan, presentation slides from NEI and EPRI MRP. (24 page(s), 7/24/2002)
- ML022340653 - 08/23/2002 Public Meeting Between NRC and NEI to Discuss Bulletin 2002-02 Slides. (22 page(s), 8/22/2002)
- ML030850185 - Preliminary Responses to NRC Staff Comments & Questions on Davis Besse Safety Significance Assessment. (34 page(s), 2/5/2003)
- ML030850188 - Sectioned physical specimen showing penetration of clad layer into base metal (scanned by S.Long, NRR, from specimen provided by E. Hackett, RES). (1 page(s), 2/5/2003)
- ML030850195 - E-mail D. Simpkins, RIII, to C. Lipa, RIII, et al., Re: Captured images from Davis-Besse Nozzle 3 penetration. (12 page(s), 3/7/2002)
- ML030850199 - FENCO various pictures of Nozzles 1, 2, and 3 from S. Long's computer. (14 page(s), 3/10/2002)
- ML030850203 - E-mail S. Long, NRR, to B. Wetzel, NRR, Re: Fwd Davis Besse & INES Rating w/att e-mal 03/14/02 S. Long, NRR, to B. Wetzel, NRR, Re: Lochbaum's e-mail Dropped Acid at Davis Besse. (4 page(s), 3/14/2002)
- ML030850206 - Powerpoint file named pictures-NRC 032902 ppt from S. Long"s computer. (2 page(s), 3/16/2002)
- ML030850221 - E-mail S. Long, NRR, to R. Barrettt, NRR, Re: Carbon steel Test Results. (1 page(s), 3/19/2002)
- ML030850224 - File named Public brf risk sld.wpd from S. Long's (NRR) computer. (3 page(s), 3/20/2002)
- ML030850227 - E-mail S. Long, NRR, to G. Lanik, RES, Boric Acid Corrosion. (1 page(s), 3/20/2002)
- ML030850233 - Framatome ANP report to FENOC Liquid Penetrant Examination. (5 page(s), 3/24/2002)
- ML030850236 - Picture file named Safety Significance Determination Files Shaded Finite Element Model. PDF from S. Long's (NRR) computer provided by FENCO. (1 page(s), 3/28/2002)
- ML030850240 - E-mail M. Leisure, First Energy, to D. Pickett, NRR, Re: Fwd: Verifying some Davis Besse PRA information. (3 page(s), 3/29/2002)
- ML030850243 - E-mail S. Long, NRR, to F. M. Reinhart & J. Chung, NRR, Re: Davis-Besse. (1 page(s), 4/10/2002)
- ML030850245 - E-mail S. Long, NRR, to J. Chung, NRR, Re: Davis-Besse. (1 page(s), 4/11/2002)
- ML030850451 - E-mail S. Long, NRR, to S. Burgess, RIII, Re: Fwd: Questions to Region 3 SRA on Davis Besse, w/att e-mail 04/15/02 S. Long, NRR, to J. Chung, NRR, et al. (5 page(s), 4/15/2002)
- ML030850456 - E-mail S. Long, NRR, to F. M. Reinhart & J. Chung, NRR, Re: CRDM Briefing. (1 page(s), 4/15/2002)
- ML030850484 - E-mail S. Long, NRR, to Beth Wetzel, NRR, Re: Meeting with NEI/MRP. (1 page(s), 4/15/2002)
- ML030850489 - E-mail S. Long, NRR, to M. Parker, RIII, Fwd: Re: Questions to Region 3 SRA on Davis Besse. (1 page(s), 4/15/2002)
- ML030850494 - E-mail S. Long, NRR, to Beth Wetzel, NRR et al, Fwd: Re: Questions to Region 3 Davis Besse. (1 page(s), 4/16/2002)
- ML030850506 - E-mail S. Long, NRR, to M. Johnson, NRR, P. Wilson, NRR, Fwd: Concdptual Basis for as SDP for Davis Besse Head Cavity. (1 page(s), 4/23/2002)
- ML030850513 - Picture file named Nozzle 46. ppt from S. Long's (NRR) computer provided by FENCO. (7 page(s), 4/24/2002)
- ML030850543 - Memo M. Johnson, NRR, to J. Grobe, RIII, Re: Request for Additional Information Regarding the Degraded Reactor vessel Head at Davis Besse. (4 page(s), 4/25/2002)
- ML030850551 - E-mail M Riemer (M.Riemer), FENCO, to dvp1 (D. Pickett), NRR Re: Safety Significance Determination Files with color Images. (1 page(s), 4/25/2002)
- ML030850554 - E-mail S. Long, NRR, to Prw1, Fwd: Revised Qs for FENOC's Covity Risk Assessment. (1 page(s), 4/25/2002)
- ML030850560 - E-mail S. Long, NRR, to S. Sands, NRR, Fwd: 05/07/02 Meeting Notice, Meeting with First Energy Nuclear Operation Company. (2 page(s), 4/25/2002)
- ML030850565 - E-mail S. Long, NRR, to D. Pickett, NRR, S. Sands, NRR, Fwd: Re: COMSECY responses and Davis-Besse Questions, w/att e-mail 04/26/02 M. Caruso, NRR, to J. Grobe, RIII. (7 page(s), 4/26/2002)
- ML030850572 - Communications re 05/02/2002 meeting, location requested. (1 page(s), 5/2/2002)
- ML030850574 - E-mail S. Long, NRR, to D. Pickett, NRR, Re: Fwd: TIA. (1 page(s), 5/3/2002)
- ML030850577 - Message for Davis-Besse Root Cause Meeting. (1 page(s), 5/6/2002)
- ML030850582 - Internal Panel Meeting May 9, agreement to attend meeting. (1 page(s), 5/8/2002)
- ML030850591 - E-mail D. Pickett, NRR, to A. Mendiola, NRR, et al, Fwd: Davis-Besse TIA 2002-001 (DRS), w/att e-mail. (2 page(s), 5/8/2002)
- ML030850594 - E-mail S. Long, NRR, S. Bloom, NRR, Re: 0350 Panel. (1 page(s), 5/9/2002)
- ML030850599 - Picture file named Cavity Locking Toward Nozzle Eleven. jpg from S. Long's (NRR) computer. (7 page(s), 5/14/2002)
- ML030850600 - Meeting with NEI/MRP. (3 page(s), 5/14/2002)
- ML030850602 - Meeting NEI/MRP. (4 page(s), 5/14/2002)
- ML030850605 - Questions/comments on Davis-Besse safety significance assessment. (2 page(s), 5/15/2002)
- ML030850607 - E-mail S. Long, NRR, to D. Pickett, NRR, Re: TIA 2002-01. (1 page(s), 5/15/2002)
- ML030850609 - E-mail S. Long, NRR, to T. D'Angelo, NRR, Fwd: Q's for Davis-Besse. (1 page(s), 5/15/2002)
- ML030850613 - Meeting on Davis-Besse Risk Assessment. (1 page(s), 5/15/2002)
- ML030850720 - Serial 1-1274 - Supplemental Information in response to NRC Question Number 24 on the Preliminary Probable Cause Summary Report dated March 22, 2002. (25 page(s), 5/15/2002)
- ML030850722 - Responses to Two NRC Questions Following the Root cause Analysis Presentation. (2 page(s), 5/16/2002)
- ML030850727 - Davis-Besse Cavity Pix. (1 page(s), 5/17/2002)
- ML030850736 - PFM Flowchart for Steve Long. (3 page(s), 5/18/2002)
- ML030850739 - Various picture files named DCP 2464, 2466, 2482, 2483, 2485, 2488, 2493, JPG for S. Long's computer. (7 page(s), 5/20/2002)
- ML030850740 - E-mail W. Long, NRR, to D. Pickett, NRR, Re: TIA 2002-01. (1 page(s), 5/20/2002)
- ML030850741 - E-mail S. Long, NRR, to W. Norris, RES, Re; Funding. (1 page(s), 5/20/2002)
- ML030910600 - Slides: Expansion Cooling Modeling Presented by FENCO at public meeting. (19 page(s), 5/22/2002)
- ML030850751 - E-mail S. Long, NRR, to M. Johnson, NRR, Re: Fwd: Two Davis-Besse Items. (1 page(s), 5/23/2002)
- ML030850752 - E-mail re Mike Johnson call and desire to discuss support for their Davis-Besse significance determinat. (1 page(s), 5/23/2002)
- ML030850755 - NRC Questions on Safety Significance (SSA). (4 page(s), 5/23/2002)
- ML030850759 - File named WOR-cladding photo.doc from S. Long's (NRR) computer. (1 page(s), 5/28/2000)
- ML030850762 - Pictures of Davis-Besse Cavity. (1 page(s), 5/28/2002)
- ML030850763 - Davis-Besse head corrosion margin report. (1 page(s), 5/29/2002)
- ML030850764 - E-mail S. Long, NRR, to D. Pickett, NRR, et al., Re: Fwd: NR & Research SSA Questions. (3 page(s), 5/30/2002)
- ML030850768 - Slides: By John Hickling, EPRI, titled Crack growth rate of thick-section Alloy 600 material exposed to PWR primary water. (26 page(s), 5/30/2002)
- ML030860120 - E-mail D. Wuokko, FENOC, to D. Pickett, NRR, Re: Nozzle 3 Cavity Exposed Cladding Area. (3 page(s), 5/30/2002)
- ML030860125 - E-mail S. Long, NRR, to D. Pickett, NRR, M. Johnson, NRR, NRR, Fwd: Probabilistic Calcs for DB (1 page(s), 5/30/2002)
- ML030860128 - E-mail D. Pickett, NRR, to DB Daily call, DB0350, et al, Fwd: Draft Preliminary Responses to NRC RAI on Safety Significance Assessment. (2 page(s), 5/31/2002)
- ML030860144 - E-mail D. Pickett to DB Daily call; DB0350, et al, Fwd: Draft Preliminary Responses to NRC RAI on Safety Significance Assessment. (2 page(s), 5/31/2002)
- ML030860148 - E-mail S. Long, NRR, to M. Kirk, RES, et al, Re: Fwd: ASME Paper on Elasto-Plastic Analysis of Constrained Disk Burst Tests. (3 page(s), 5/31/2002)
- ML030860153 - E-mail S. Long, NRR, to C. Moyer, RES, M.Kirk, RES, W. Cullen, RES, Fwd: Nozzle 3 Cavity Exposed Cladding Area. (4 page(s), 5/31/2002)
- ML030860159 - E-mail M. Marshall, NRR, J. Grobe, RIII, et al, Another Revised Agenda for June 5th ACRS Meeting. (5 page(s), 5/31/2002)
- ML030860161 - E-mail D. Pickett to DB Daily call; DB0350, Fwd: Responses to RIII SSA RAI's. (2 page(s), 6/3/2002)
- ML030860166 - Slides: By Nathaniel Cofie titled Safety Margin Assessment of Davis-Besse Head Wastage Condition. (8 page(s), 6/30/2002)
- ML030860469 - E-mail S. Long, NRR, to D. Snowberger, NRR, FENOC's 1st Risk Assessment. (1 page(s), 6/4/2002)
- ML030860496 - File named ACRS slides for risk considerations. wpd from S. Long, NRR computer. (3 page(s), 6/4/2002)
- ML030860499 - E-mail D. Pickett, NRR, to B, Bass, ORNL, Fwd: Nozzel 3 Grid Area and Nozzel 11. (3 page(s), 6/5/2002)
- ML030860502 - E-mail D. Pickett, NRR, D. Wuokko, FENCO, First Energy Corp., Fwd: Lynchburg on the 13 th. (1 page(s), 6/5/2002)
- ML030860507 - E-mail D. Pickett, NRR, to S. Long, NRR, Re: RES Needs info. (3 page(s), 6/5/2002)
- ML030860508 - E-mail D. Pickett, NRR, to DB Daily call: DB0350, Fwd: Progress on Responses to RIII SSA Questions. (2 page(s), 6/6/2002)
- ML030860511 - E-mail D. Pickett, NRR to DB0350, W. Norris, RES, Fwd: F-ANP on June 17, 2002. (3 page(s), 6/10/2002)
- ML030860515 - E-mail S. Long, NRR to M. Marshall, NRR, Re: EPRI NDE Field Trip. (1 page(s), 6/11/2002)
- ML030860522 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: Trip. (1 page(s), 6/12/2002)
- ML030860527 - E-mail S. Long, NRR, to A. Howell, RIV, Re: Blade article for LLTF and 0350 mtgs. (1 page(s), 6/13/2002)
- ML030910621 - E-mail S. Long, NRR, to D. Pickett, NRR, Re: Fwd: Draft Preliminary Responses to NRC RAI on Safety Significance Assessment. (38 page(s), 6/14/2002)
- ML030860186 - Slides: Nuclear & Environmental Operations, Davis Besse Reactor Vessel Head Examination. (17 page(s), 6/17/2002)
- ML030860192 - Probability of Detecting Leaks in RPV Upper Head Nozzles by Visual Inspections Revision 1 by S. Hunt and M. Flemming, Dominion Engineering. (5 page(s), 6/17/2002)
- ML030860204 - E-mail D. Pickett, NRR, to M. Kirk, W. Norris, Re: Fwd: Only RV Cavity Piece will be on display June 17, 2002. (3 page(s), 6/17/2002)
- ML030860208 - E-mail S. Long, NRR, to D. Snowberger, NRR, Fwd: Conference Room for 0350 Panel Mtg. (1 page(s), 6/19/2002)
- ML030860214 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: Area of exposed clad. (1 page(s), 6/20/2002)
- ML030860215 - E-mail S. Long, NRR, to D. Lochbaum, UCS, What Green. (1 page(s), 6/20/2002)
- ML030860220 - E-mail D. Pickett, NRR to DB Daily call, Re: Fwd: Draft Preliminary Response to NRC RAI on Safety Significance Assessment w/att e-mail 05/31/02 D. Wuokko, FENCO, to D. Pickett, NRR. (2 page(s), 6/22/2002)
- ML030860224 - E-mail S. Long, NRR, to D. Lochbaum, UCS, Re: What Green. (1 page(s), 6/25/2002)
- ML030860232 - E-mail S. Long, NRR, to C. Moyer, RES, Re: Fwd: Draft Agenda. (1 page(s), 6/25/2002)
- ML030860243 - E-mail S. Long, NRR, to D. Snowberger, NRR, Fwd: SCSS search. (3 page(s), 6/25/2002)
- ML030860253 - E-mail S. Long, NRR, to D. Snowberger, NRR, Fwd: second search - High RCS pressure. (3 page(s), 6/25/2002)
- ML030860258 - E-mail S. Long, NRR, to M. Marshall, NRR, Additional Q for MRP. (1 page(s), 6/25/2002)
- ML030860263 - E-mail S. Long, NRR, to J. Chung, NRR, Fwd: Serial 1-1277 - Confirmatory Action Letter: Response to Request for Additional Information Related to DBNPS Safety Significance Assessment. (3 page(s), 6/26/2002)
- ML030860264 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: Stress Strain. (1 page(s), 6/26/2002)
- ML030860270 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: Friday. (1 page(s), 6/27/2002)
- ML030860274 - E-mail S. Long, NRR, to A. Lee, NRR, Count of CRDM Cracks To-Date. (1 page(s), 7/1/2002)
- ML030860277 - E-mail S. Long, NRR, to D. Snowberger, NRR, Fwd: Davis-Besse RPV Head Meeting. (2 page(s), 7/1/2002)
- ML030860280 - E-mail S. Long, NRR, to T. Valentine, NRR, Re: Cracks. (1 page(s), 7/1/2002)
- ML030860284 - E-mail S. Long, NRR, to D. Pickett, NRR, Davis Besse Reactor Cavity. (1 page(s), 7/2/2002)
- ML030860287 - E-mail S. Long, NRR, to D. Pickett, NRR, Re: TIA 2002-1 and Schedules. (1 page(s), 7/8/2002)
- ML030860292 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: Fwd: 07/10/02 conf call time change. (1 page(s), 7/9/2002)
- ML030860296 - E-mail D. Pickett, NRR, to A. Mendiola, NRR, et al, Re: Fwd: Sample Plan Phase 3. (1 page(s), 7/15/2002)
- ML030860298 - E-mail S. Long, NRR, to C. Carpenter, NRR et al, Meeting to Discuss Consistency on CRDM SDP Issues. (1 page(s), 7/16/2002)
- ML030860300 - E-mail S. Long, NRR, to P. Wilson, NRR, Re: Format for Phase 3 Analyses. (1 page(s), 7/17/2002)
- ML030860311 - E-mail S. Long, NRR, to L. Dudes, NRR, Fwd: Davis-Besse TIA 2002-001 (DRS). (1 page(s), 7/17/2002)
- ML030860314 - E-mail S. Long, NRR, to L. Dudes, NRR, Re: DB. (1 page(s), 7/17/2002)
- ML030860319 - E-mail S. Long, NRR, to M. Johnson, NRR, RIII Participation in tomorrow's meeting. (1 page(s), 7/17/2002)
- ML030860324 - E-mail D. Pickett, NRR, to B. Bateman, NRR, Re: Sample Plant Phase 3 Revision date July 15 W/att e-mail 07/18/02 M. Leisure, FENOC, to dvp1 D.Pickett, NRR. (8 page(s), 7/18/2002)
- ML030860327 - E-mail S. Long, NRR, to C. Carpenter, NRR, Fwd: Davis-Besse TIA 2002-001 (DRS). (1 page(s), 7/18/2002)
- ML030860334 - E-mail S. Long, NRR, to M. Johnson, NRR, Fwd: Re: Attend 07/25 panel meeting. (1 page(s), 7/18/2002)
- ML030860340 - E-mail S. Long, NRR, to M. Kirk, RES, Re: Mark. (1 page(s), 7/23/2002)
- ML030860343 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: 0350. (1 page(s), 7/23/2002)
- ML030860344 - E-mail S. Long, NRR, to D. Pickett, NRR, Re: Fwd: FENOC Resonse to RAI Question 1.d, w/att e-mail 07/25/02 M. Riemer, FENOC, to D. Pickett, NRR. (3 page(s), 7/25/2002)
- ML030860348 - E-mail S. Long, NRR, to C. Lipa, RIII, L. Collins, RIII, Fwd: Davis-Besse SDP Status Slides Revised. (1 page(s), 7/25/2002)
- ML030860351 - E-mail S. Long, NRR to D. Pickett, NRR, Re: FENOC Response to RAI Question 1.d. (1 page(s), 9/29/2002)
- ML030860357 - E-mail S. Long, NRR, to L. Dudes, NRR, Re: Status of Risk Analysis. (1 page(s), 7/30/2002)
- ML030910624 - Preliminary FENOC submission titled Responses to NRC Staff Comments and Questions on Davis-Besse Safety Significance Assessment (SIA-W-DB-O1Q301) Submitted April 8, 2002. (36 page(s), 7/31/2002)
- ML030860364 - E-mail S. Long, NRR, to S. Bloom, NRR, 11 o'clock telecon w/Davis-Besse. (1 page(s), 8/1/2002)
- ML030860365 - E-mail S. Long, NRR, to M. Johnson, NRR, Invitation E-mail to Draft D-B SDP Review. (1 page(s), 8/8/2002)
- ML030860369 - E-mail S. Long, NRR, to B. Bateman, NRR, et al, Davis-Besse RPV not to be Encapsulated. (2 page(s), 8/12/2002)
- ML030860372 - E-mail S. Long, NRR, to D. Snowberger, NRR, Re: Davis-Besse. (1 page(s), 8/12/2002)
- ML030860373 - E-mail S. Long, NRR, to D. Snowberger, NRR, et al, Fwd: Draft SDP Review, w/att e-mail 08/12/02 M. Johnson, NRR, to R.Caruso, NRR et al. (2 page(s), 8/12/2002)
- ML030860424 - E-mail S. Long, NRR, to D. Pickett, NRR, Re: TIA Monthly Report. (1 page(s), 8/12/2002)
- ML030860430 - E-mail S. Long, NRR, to W. Shack, ANL, Re: Phone Number for meeting at 1pm. (2 page(s), 8/13/2002)
- ML030860434 - E-mail S. Long, NRR, to W. Cullen, RES, Re: Fwd: SDP Phase III. (1 page(s), 8/13/2002)
- ML030860439 - E-mail D.Wuokko, FFENOC, to JBH1 (J. Hopkins) NRR, Re: Nozzle 46 Information. (1 page(s), 8/14/2002)
- ML030860441 - E-mail S. Long, NRR, to M. Marshall, NRR, Re: EPRI Report on Crack Growth Rates for Primary Water Stress Corrosion Cracking in Thick-Wall Alloy 600 Material. (1 page(s), 8/20/2002)
- ML030860443 - E-mail D. Wuokko, FENOC, to Jbh1, NRC, Re; Draft Plan for Extraction of RVCH Nozzles 2 and 46 Penetration Areas. (6 page(s), 8/20/2002)
- ML030870123 - E-mail S. Long, NRR, to S. Burgess, RIII, Call About D-B SDP. (1 page(s), 8/21/2002)
- ML030870129 - E-mail M.Leisure, FENOC to jbh1 (J. Hopkins) NRR, Re: NRC Request Re: Cavity Mold. (4 page(s), 8/23/2002)
- ML030870135 - E-mail S. Long, NRR, to M. Kirk, RES, et al, Re: Fwd: Instability for Failure Pressure, w/att e-mail 08/27/02 D. Wuokko, FENOC, to jbh1. (2 page(s), 8/27/2002)
- ML030870137 - E-mail S, Long, NRR, to J. Hopkins, NRR, Re: Instabiltiy for failure Pressure. (1 page(s), 8/27/2002)
- ML030870142 - E-mail S. Sands, NRR, to S. Long, NRR, Fwd: Steve Long's Questions on Safety Significance Assessment. (2 page(s), 8/29/2002)
- ML030870147 - E-mail D. Wuokko, FENOC, to sps1 (S. Sands), NRR, Re: Conference Call Re: Containment Sump. (1 page(s), 8/30/2002)
- ML030910632 - Slides: Reactor Pressure Vessel Head Material Degradation by B. Sheron at Penn State University. (28 page(s), 9/30/2002)
- ML030870154 - E-mail S. Long, NRR, to G. Demoss, RES, Fwd: Auailability 4 meeting (Correction) on Application of Probabilistic Fracture Mechanics to RPV Head. (2 page(s), 9/4/2002)
- ML030870158 - E-mail S. Long, NRR, to G Demoss, RES Draft. (1 page(s), 9/4/2002)
- ML030870164 - E-mail S. Long, NRR, to M. Clark-Manahan, NRR, et al., Re: Scheduled - Meeting w/ET on Davis Besse Risk Assessment & SDP Process. (2 page(s), 9/5/2002)
- ML030870169 - E-mail S. Long, NRR, to C. Carpenter, NRR, Re: SPSB Briefing on Davis Besse. (1 page(s), 9/9/2002)
- ML030870181 - E-mail S. Long, NRR, to B. Bateman, NRR, Re: Davis Besse SDP. (1 page(s), 9/10/2002)
- ML030870184 - E-mail M. Leisure, FENCO, to AJM @ nrc.gov (T. Mendiola, NRR), Re: Sample Plan Phase 3. (5 page(s), 9/10/2002)
- ML030870189 - E-mail S. Long, NRR, to drwuokko @ firstenergycorp.com, FENCO, Re: Conference Call Regarding RPV Head Temperature and Sump. (1 page(s), 9/10/2002)
- ML030870192 - E-mail S. Long, NRR, to M. Kirk, RES, Re: Cracks found in D-B Cavity clad and Nozzle #3 J-Groove Weld. (2 page(s), 9/10/2002)
- ML030870200 - E-mail S. Bloom, NRR, to S. Long, NRR, Fwd: Sample Plan Phase 3 Update, w/att e-mail 09/10/02 J. Hopkins, NRR, to B. Bateman, NRR, et al. (30 page(s), 9/11/2002)
- ML030870206 - E-mail S. Long, NRR, to C. Carpenter, NRR, Re: meeting with Kane. (1 page(s), 9/11/2002)
- ML030870212 - E-mail S. Long, NRR, to M. Johnson, NRR, Re: Subjects of MRP Meeting on PFM. (1 page(s), 9/12/2002)
- ML030870214 - E-mail S. Long, NRR, to I. Jumg, NRR, Where are OR Pre-brief and Briefing. (1 page(s), 9/17/2002)
- ML030870218 - E-mail J. Hopkins, NRR, to S, Long, NRR, Re: Fwd: Revision of Licensee Safety Significance Assessment. (2 page(s), 9/18/2002)
- ML030870277 - E-mail D. Wuokko, FENCO, to jbh1 (J. Hopkins ) NRR, Re: RPV Head/hot leg temperature history. (1 page(s), 9/19/2002)
- ML030870281 - E-mail J. Hopkins, NRR, to C. Stephanie, Re: Fwd: Sample Plan Phase 3. (11 page(s), 9/20/2002)
- ML030870298 - E-mail S. Long, NRR, to D. Horner, Platts [@ platts com], Re: 2nd Attempt at getting it right. (3 page(s), 9/20/2002)
- ML030870309 - E-mail S. Long, NRR, to C. Carpenter, NRR, Re: Davis-Besse TIA 2002-001. (1 page(s), 10/8/2002)
- ML030870312 - E-mail S. Long, NRR, to A. Hiser, NRR, et al, Re: Fwd: L. Reactor Coolant System Hot Leg Temperatures, w/att e-mail dtd 10/07/02 D. Wuokko, FENCO, to jbh. (2 page(s), 10/8/2002)
- ML030870318 - E-mail S. Long, NRR, to W. Cullen, RES, Fwd: Sample Plan Phase. (1 page(s), 10/8/2002)
- ML030870321 - E-mail S. Long, NRR, to A Hiser, NRR, Re: Input on PFM meeting summary. (1 page(s), 10/9/2002)
- ML030870324 - E-mail S. Long, NRR, to J. Birmingham, NRR, Re: Input on PFM meeting summary. (1 page(s), 10/9/2002)
- ML030870341 - Slide Presentation, NRC Assessment of Davis-Besse Head Degradation. (16 page(s), 2/5/2003)
- ML030870347 - Davis Besse Unit 1 Technical Specifications Section 2, Safety Limits and Limiting Safety System Settings. (2 page(s), 2/5/2003)
- ML030870350 - The NRC's Significance Determination Process. (1 page(s), 2/5/2003)
- ML030870311 - Letter to H. Bergendahl, First-Energy from C. Lipa, Request for Additional Information Related to the Davis-Besse Nuclear Power Station Safety Significance Assessment. (5 page(s), 5/6/2002)
- ML030870333 - E-mail from T. Nordenberg to A. Mendiola, Request for Additional Information Related to the Davis-Besse Safety Significance. (1 page(s), 5/7/2002)
- ML030870343 - E-mail from C. Lipa to J. Caldwell, Meeting on D-B Risk Analysis and significance Assessment. (1 page(s), 8/1/2002)
- ML030870370 - Davis-Besse Reactor Vessel Head Damage, NRC Update. (6 page(s), 9/30/2002)
- ML030870376 - Preliminary Notification of Event or Unusual Occurrence -- PNO-III-02-036. (2 page(s), 9/10/2002)
- ML030870380 - E-mail from S. Long to T. Steingass, Significance Review. (1 page(s), 5/21/2002)