Item B-3: Event Categorization
DESCRIPTION
There are several inconsistencies in event categorization between the GDC, SRP, Standard Format, and applicant submissions.
There are several inconsistencies in event categorization between the GDC, SRP, Standard Format, and applicant submissions.
Current NRC regulations and practice require that certain operating requirements (Technical Specifications) be made part of each operating license.
Neutron irradiation of reactor pressure vessel weld and plate materials decreases the fracture toughness of the materials.
Following a LOCA in an LWR, combustible gases, principally hydrogen, may accumulate inside the primary reactor containment as a result of: (1) metal-water reaction involving the fuel element cladding; (2) the radi
Nuclear power plant instrumentation and control systems are composed of safety-related protection systems and non-safety-related control systems.
The design criteria and methods for the seismic qualification of mechanical and electrical equipment in nuclear power plants underwent significant changes during the course of the li
In March 1981, this issue was identified as a USI in NUREG-0705.[1]A program was initiated to evaluate the safety adequacy of the decay heat removal (DHR
The complete loss of AC electrical power to the essential and nonessential switchgear buses in a nuclear power plant is referred to as a "Station Blackout." Because many safety systems required for reactor core de
This issue deals with a concern for the availability of adequate recirculation cooling water following a LOCA when long-term recirculation of cooling wa
Pipe cracking has occurred in the heat-affected zones of welds in primary system piping in BWRs since mid-1960. These cracks have occurred mainly in Type 304 stainless steel which is the type used in most