Item B-12: Containment Cooling Requirements (Non-LOCA)
DESCRIPTION
The rationale for normal and postaccident containment cooling will be reviewed to determine the adequacy of the design requirements imposed on the containment ventilation systems.
The rationale for normal and postaccident containment cooling will be reviewed to determine the adequacy of the design requirements imposed on the containment ventilation systems.
The calculations of differential pressure that occur in containment subcompartments from a loss-of-coolant event require a complex fluid dynamic analysis
Some prototype electrical penetration failures have occurred to date. In addition, failures of low voltage penetration modules have occurred at a licensed facility.
This NUREG-0471[1]task will develop more reliable models and associated computer capability than currently available to the
This item has been divided into two parts which have been evaluated separately.
Numerical reliability goals and methods of analysis have not been established by the NRC.
There are several inconsistencies in event categorization between the GDC, SRP, Standard Format, and applicant submissions.