Item A-10: BWR Feedwater Nozzle Cracking (former USI)
DESCRIPTION
Inspections of operating BWRs conducted up to April 1978 revealed cracks in the feedwater nozzles of 20 reactor vessels. Most of these BWRs contained 4 nozzles with diameters ranging from 10 in. to 12 in.