Item A-9: ATWS (former USI)
DESCRIPTION
The technical report on ATWS for water-cooled reactors (WASH-1270)[1]discussed the probability of an ATWS event as well as a
The technical report on ATWS for water-cooled reactors (WASH-1270)[1]discussed the probability of an ATWS event as well as a
As a result of the GE testing program for the MARK III pressure-suppression containment program, new containment loads associated with a postulated LOCA were identified in 1975 which h
During testing for an advanced BWR containment system design (MARK III), suppression pool hydrodynamic loads were identified which had not been considere
During the conduct of a large scale testing program for an advanced design BWR pressure suppression containment system (MARK III), new suppression pool hydrodynamic loads associated wi
This item was originally identified in NUREG-0371[1]and was later declared a USI in NUREG-0510.
This item was originally identified in NUREG-0371[1]and was later declared a USI in NUREG-0510.
Prior to 1978, operating experience with PWR steam generators was characterized by extensive corrosion and mechanically-induced degradation of the steam
On May 7, 1975, the NRC was informed by VEPCO that an asymmetric loading on the reactor vessel supports resulting from a postulated reactor coolant pipe r
The issue was raised after the occurrence of various incidents of water hammer that involved steam generator feedrings and piping, emergency core cooling
This section contains all Task Action Plan items documented in NUREG-0371 [1]and NUREG-0471