Home > NRC Library > ADAMS Public Documents
Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Cover Letter and Information on Enclosures
Accession Number: ML22152A025
Date Released: Tuesday, June 7, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22151A212 - Wolf Creek Generating Station Submittal of Revision 35 to Updated Safety Analysis Report. (10 page(s), 5/18/2022)
- ML22151A151 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Cover Sheet (1 page(s), 5/18/2022)
- ML22151A138 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 1, Introduction And General Description Of The Plant (200 page(s), 5/18/2022)
- ML22151A155 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 2, Site Characteristics (1746 page(s), 5/18/2022)
- ML22151A148 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 2, Figures (804 page(s), 5/18/2022)
- ML22151A139 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (1583 page(s), 5/18/2022)
- ML22151A149 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 4, Reactor (260 page(s), 5/18/2022)
- ML22151A154 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System And Connected Systems (224 page(s), 5/18/2022)
- ML22151A156 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features (669 page(s), 5/18/2022)
- ML22151A153 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 7, Instrumentation And Controls (485 page(s), 5/18/2022)
- ML22151A152 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 8, Electric Power (140 page(s), 5/18/2022)
- ML22151A150 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems (991 page(s), 5/18/2022)
- ML22151A136 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 10, Steam And Power Conversion System (160 page(s), 5/18/2022)
- ML22151A141 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management (192 page(s), 5/18/2022)
- ML22151A157 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 12, Radiation Protection (153 page(s), 5/18/2022)
- ML22151A143 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations (75 page(s), 5/18/2022)
- ML22151A144 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 14, Initial Test Program (204 page(s), 5/18/2022)
- ML22151A140 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 15, Accident Analysis (610 page(s), 5/18/2022)
- ML22151A146 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications (1 page(s), 5/18/2022)
- ML22151A137 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 17, Quality Assurance (6 page(s), 5/18/2022)
- ML22151A142 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 (250 page(s), 5/18/2022)
- ML22151A147 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 2 of 2 (205 page(s), 5/18/2022)
- ML22151A145 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, List of Table of Contents (86 page(s), 5/18/2022)
- ML22152A176 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted (47 page(s), 5/18/2022)
- ML22152A175 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 2, Figures (11 page(s), 5/18/2022)
- ML22152A174 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 5, Figures (6 page(s), 5/18/2022)
- ML22152A168 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 6, Figures (10 page(s), 5/18/2022)
- ML22152A171 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 7, Figures (21 page(s), 5/18/2022)
- ML22152A169 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 8, Figures (11 page(s), 5/18/2022)
- ML22152A170 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 9, Figures (130 page(s), 5/18/2022)
- ML22152A172 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 10, Figures (48 page(s), 5/18/2022)
- ML22152A173 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 11, Figures (12 page(s), 5/18/2022)
- ML22152A177 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 12, Figures - Redacted (12 page(s), 5/18/2022)
- ML22152A178 - Wolf Creek Generating Station Revision 35 to Updated Safety Analysis Report, Chapter 18, Figures (1 page(s), 5/18/2022)
- ML22152A181 - Wolf Creek Generating Station, M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Cover Through Appendix B6 (530 page(s), 5/18/2022)
- ML22152A185 - Wolf Creek Generating Station, M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Appendices B7 Though B13 (401 page(s), 5/18/2022)
- ML22152A182 - Wolf Creek Generating Station, M-6630-00017A, Attachments C to Appendix G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations (345 page(s), 5/18/2022)
- ML22152A183 - Wolf Creek Generating Station, M-6630-00017A, Appendix G3D to Attachment H, Structural Steel Fireproofing Data, Page G3D-1 of G3D-50 to G5A-63 of G5A-63 (179 page(s), 5/18/2022)
- ML22152A207 - Wolf Creek Quality Program Manual, Rev. 12 (98 page(s), 5/18/2022)
- ML22152A205 - Wolf Creek Quality Program Manual, Rev. 13 (98 page(s), 5/18/2022)
- ML22152A202 - Wolf Creek Generating Station, E-IF9900, Post-Fire Safe Shutdown Operator Manual Actions, Rev. 10 (116 page(s), 5/18/2022)
- ML22152A193 - Wolf Creek Generating Station, E-1F9905, Revision 11, Fire Hazard Analysis (281 page(s), 5/18/2022)
- ML22152A195 - Wolf Creek Generating Station, E-1F9910, Revision 17, Post-Fire Safe Shutdown Area Analysis (2097 page(s), 5/18/2022)
- ML22152A200 - Wolf Creek Generating Station, E-1F9915, Revision 15, Design Basis Document for OFN RP-017, Control Room Evacuation (247 page(s), 5/18/2022)
- ML22152A198 - Wolf Creek Generating Station, Calculation No. XX-E-013, Revision 4, Post-Fire Safe Shutdown (PFSSD) Analysis (305 page(s), 5/18/2022)
- ML22152A208 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis (11 page(s), 5/18/2022)
- ML22152A192 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis (13 page(s), 5/18/2022)
- ML22152A201 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis (24 page(s), 5/18/2022)
- ML22152A203 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis (20 page(s), 5/18/2022)
- ML22152A206 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN006, Post-Fire Safe Shutdown (PFSSD) Analysis (21 page(s), 5/18/2022)
- ML22152A196 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis (29 page(s), 5/18/2022)
- ML22152A197 - Wolf Creek Generating Station, CCN No. XX-E-013, Revision 4, Sequence No. CN008, Post-Fire Safe Shutdown (PFSSD) Analysis (27 page(s), 5/18/2022)
- ML22152A194 - Wolf Creek Generating Station, EQSD-I, Revision 15, Equipment Qualification Design Basis Document (313 page(s), 5/18/2022)
- ML22152A204 - Wolf Creek Generating Station, EQSD-I, Revision 16, Equipment Qualification Design Basis Document (323 page(s), 5/18/2022)
- ML22152A199 - Wolf Creek Generating Station, EQSD-II, Revision 33, EQ Program Master List (Table 1) Plus Mild Environment SR Electrical Equipment List (Table 2) (134 page(s), 5/18/2022)