First partial response to FOIA request for documents.App A documents encl.Addl records re request contained in FOIA-87-214 under name of Conner.
Accession Number: ML20154C370
Date Released: Tuesday, June 16, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20154C367 - First partial response to FOIA request for documents.App A documents encl.Addl records re request contained in FOIA-87-214 under name of Conner. (4 page(s), 5/10/1988)
- ML20154E066 - Ack receipt of 700817 ltr informing NRC of stpes taken in response to violations noted in 700721 ltr. (1 page(s), 8/25/1970)
- ML20154E666 - Forwards Insp Rept 50-275/70-01 on 700302-05.Nonconformance noted. (2 page(s), 4/3/1970)
- ML20154D575 - Forwards insp rept conduct on 710412-14.No noncompliance noted.Excavation work for Unit 2 commenced in early Apr. Const activities associated w/containment bldg expected to start during June 1971. (15 page(s), 5/6/1971)
- ML20154F104 - Forwards Insp Rept 50-275/69-02 on 690311.No noncompliance noted.Schedule for start of const of containment bldg reasonable.Util to stress QA-QC programs. (2 page(s), 3/21/1969)
- ML20154F135 - Insp Rept 50-275/69-02 on 690311.No nonconformance noted. Major areas inspected:onsite organization & personnel & direct observations of status of const activities. (5 page(s), 3/3/1969)
- ML20154E634 - Forwards 690916 insp rept of util main ofc.No nonconformance noted.Visit was to review QC procedures re const of containment bldg & other Class I civil structures. (1 page(s), 10/10/1969)
- ML20154E597 - Informs of apparent deficiency identified during 700302-05 insp involving item not in conformance w/statements in PSAR Section 5.1.2.3(c).Requests comments within 30 days re item & steps taken to correct or minmize recurrences. (2 page(s), 4/7/1970)
- ML20154E684 - Insp Rept 50-275/70-01 on 700302-05.Nonconformance noted. Major areas inspected:Attachment C containment,followup record review & observation of work re concrete,rebar & liner of containment bldg. (41 page(s), 4/3/1970)
- ML20154E762 - Forwards Insp Rept 50-275/69-07 on 690916.No nonconformance noted. (1 page(s), 10/10/1969)
- ML20154E392 - Forwards Insp Rept 50-275/70-02 on 700623-26.Nonconformance noted re radiographic exam of welds in containment bldg liner. (2 page(s), 7/16/1970)
- ML20154F073 - Insp Repts 50-275/69-03 & 50-237/69-05 on 690328.No nonconformance noted.Major areas inspected:QA-QC re primary coolant sys components for the plants. (16 page(s), 4/11/1969)
- ML20154E871 - Insp Rept 50-275/69-06 on 690626-27.No nonconformance noted. Major areas inspected:status of const,major contract awards, contract specs,QA,site evaluation,meteorological data collecting stations & breakwater. (12 page(s), 7/11/1969)
- ML20154E188 - Responds to NRC 700721 ltr re deficiency in preparation of fabrication of containment structure.Weld reinforcement examined & excessive reinforcement grounded to ASME Code requirements & radiographed. (2 page(s), 8/17/1970)
- ML20154D528 - Discusses insp rept conducted on 710623-25.Major areas inspected:QA/QC,methods & procedures for certifying vendor certification & use of safety rept analysis change procedure.Corrective action will be examined in future insp. (2 page(s), 7/19/1971)
- ML20154E600 - Forwards recent insp rept of activities at plant. Item of nonconformance w/PSAR requirements re testing of steel being used for containment liner identified during insp. (2 page(s), 4/3/1970)
- ML20154D869 - Insp Rept 50-275/70-03 on 700706.No nonconformance noted. Major areas inspected:initial review of util operation & startup organization,safety committtee & training activities. (16 page(s), 7/16/1970)
- ML20154E958 - Forwards Insp Rept 50-275/69-04 on 690430.QA-QC program for const of plant not yet formulated & implemented.Util does not intend to have Westinghouse approve containment bldg design as indicated in PSAR. (2 page(s), 5/13/1969)
- ML20154E143 - Forwards licensee response to NRC ltr & CDN re 700623-26 insp. (1 page(s), 8/25/1970)
- ML20154D736 - Forwards Insp Rept 50-275/70-04 on 700915-16.No nonconformance noted. (1 page(s), 10/16/1970)
- ML20154E908 - Insp Rept 50-275/69-05 on 690506-07.Nonconformance noted. Major areas inspected:review of QA-QC programs maintained re plant reactor primary piping & welding & radiography problem areas. (9 page(s), 5/13/1969)
- ML20154F123 - Forwards Insp Rept 50-275/69-01 on 690207.No nonconformance noted. (1 page(s), 3/3/1969)
- ML20154F001 - Forwards Insp Rept 50-275/69-03 & 50-237/69-05 on 690328. Info provides reasonable assurance that activities of util, Westinghouse & ESCO re pipe fittings mfg by ESCO of quality consistent w/requirements of PSAR. (2 page(s), 4/14/1969)
- ML20154E809 - Forwards Insp Rept 50-275/69-06 on 690626-27.No noncompliance noted.Licensee plans to install breakwater to facilitate const of plant seawater intake structure. Data collecting stations operable & satisfactorily kept. (2 page(s), 7/10/1969)
- ML20154E356 - Forwards Insp Rept 50-275/70-02 on 700623-26.Item of nonconformance noted re radiographic exam of welds in containment bldg liner.Const schedule for facility slipped by approx 4 months. (2 page(s), 7/16/1970)
- ML20154E785 - Insp Rept 50-275/69-07 on 690916.No nonconformance noted. Major areas inspected:review of const organization & relationships between util,prime const contractor & several subcontractors & currently developed QC procedures. (14 page(s), 10/10/1969)
- ML20154F024 - Forwards Insp Repts 50-275/69-03 & 50-237/69-05 on 690328. No nonconformance noted. (1 page(s), 4/14/1969)
- ML20154E821 - Forwards Insp Rept 50-275/69-06 on 690626-27.No nonconformance noted.Meteorological data collecting stations inspected & found operable & satisfactorily maintained. (2 page(s), 7/11/1969)
- ML20154E431 - Insp Rept 50-275/70-02 on 700623-26.Nonconformance noted. Major areas inspected:steam generator supports,liquid holdup tanks & gas decay tanks,receiving & storage of reactor vessel & previously identified deficiencies. (31 page(s), 7/17/1970)
- ML20154E258 - Confirms 700721 telcon re issuance of draft CDN.Insertion of word "liner" after "containment bldg" in second line of item description suggested. (1 page(s), 7/22/1970)
- ML20154D594 - Forwards insp rept conducted on 701201-03.No nonconformance noted.QA investigation re previous observation of possible inadequate technique in performing liquid holdup tank timely & comprehensive.W/o encl. (2 page(s), 12/29/1970)
- ML20154F145 - Forwards Insp Rept 50-275/68-01 of meeting on 680523.Site preparation visit not planned. (1 page(s), 5/29/1968)
- ML20154F390 - Forwards Insp Rept 50-275/70-04 on 700915-16.No nonconformance noted.Major areas inspected:NDE testing procedures & techniques,capability of NDT inspectors & evaluation of welding of containment liner. (2 page(s), 10/16/1970)
- ML20154E977 - Insp Rept 50-275/69-04 on 690430.Nonconformance noted.Major areas inspected:QA-QC program for const of plant. (6 page(s), 5/13/1969)
- ML20154F094 - Forwards Insp Rept 50-275/69-02 on 690311.No nonconformance noted. (1 page(s), 3/21/1969)
- ML20154D846 - Insp Rept 50-275/70-04 on 700915-16.No nonconformance noted. Major areas inspected:QA/QC review for fabrication & erection of steam generator supports & review status of previously reported deficiencies. (22 page(s), 10/16/1970)
- ML20154E577 - Responds to 700407 ltr requesting comments on apparent deficiency in testing matl being used for containment liner plate.Review of project QA procedures in engineering, purchasing & insp continuing. (3 page(s), 5/7/1970)
- ML20154D294 - Forwards Insp Rept 50-275/71-02 on 710623-25.No safety problem or deficiency noted.Review of util & Westinghouse QA procedures planned.Util to provide adequate documentation showing castings meet design requirements. (2 page(s), 7/22/1971)
- ML20154D855 - Forwards Insp Rept 50-275/70-03 on 700706.No nonconformance noted. (2 page(s), 7/16/1970)
- ML20154D647 - Forwards Insp Rept 50-275/70-05 on 701201-03.No nonconformance noted. (2 page(s), 12/29/1970)
- ML20154D452 - Insp Rept 50-275/71-02 on 710723-25 & 30.No enforcement action noted.Major areas inspected:unresolved items, unusual occurrences,design changes,status of const, procedures & records & review of QC sys for components. (7 page(s), 7/22/1971)
- ML20154E878 - Forwards Insp Rept 50-275/69-05 on 690506-07.Nonconformance noted.Problems re reactor ECCS piping appear to have been satisfactorily resolved. (2 page(s), 5/12/1969)
- ML20154E967 - Forwards Insp Rept 50-275/69-04 on 690430.Nonconformance noted.Util has not yet formulated & implemented a formal QA-QC program for plant const.Plans for implementing schedule for June 1969 noted. (2 page(s), 5/13/1969)
- ML20154D425 - Forwards Insp Rept 50-275/71-02 on 710723-25 & 30. No enforcement action noted. (1 page(s), 7/22/1971)
- ML20154E484 - Ack receipt of 700507 ltr informing NRC of steps taken to correct items noted in 700407 ltr.Corrective actions will be reviewed during next insp. (1 page(s), 5/13/1970)
- ML20154F153 - Forwards Insp Rept 50-275/68-01 on 680523. (1 page(s), 5/29/1968)
- ML20154F156 - Insp Rept 50-275/68-01 on 680523.No nonconformance noted. Major areas inspected:util proposed schedule for constructing plant proposed plans for assuring plant constructed in conformance w/design specs. (3 page(s), 5/29/1968)
- ML20154F116 - Forwards Insp Rept 50-275/69-01 on 690207.No problems noted.QA-QC control program will be ready for implementation at least 1 month prior to commencing const.Site visit scheduled for 690311. (2 page(s), 3/3/1969)
- ML20154E507 - Forwards licensee reply to NRC ltr & CDN from 700302 insp. (1 page(s), 5/13/1970)
- ML20154E240 - Informs of apparent deficiency re horizontal liner plate seam welds w/finished surface not in accordance w/ requirements of Paragraph UW-51,per insp on 700623-26. Comments requested within 30 days. (4 page(s), 7/21/1970)