Forwards info & drawings re Category 1 masonry walls,in response to 800721 ltr.Calculations encl.
Accession Number: ML19321B282
Date Released: Wednesday, September 30, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19321B281 - Forwards info & drawings re Category 1 masonry walls,in response to 800721 ltr.Calculations encl. (79 page(s), 7/29/1980)
- ML20260E998 - "Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 2,026 Ft." (1 page(s), 11/5/1979)
- ML20260F073 - "Architectural:CMU Wall Penetrations,Control Bldg, Communication Corridor & Radwaste Bldg." (1 page(s), 3/12/1980)
- ML20260F014 - "Architectural:CMU Wall Penetrations,Control Bldg." (1 page(s), 8/19/1979)
- ML20260E987 - "Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 1,974 Ft." (1 page(s), 4/4/1979)
- ML20260F004 - "Architectural:CMU Wall Penetrations,Auxiliary Bldg." (1 page(s), 4/14/1979)
- ML20260F008 - "Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 2,047 Ft,6 Inches." (1 page(s), 4/4/1979)
- ML20260F147 - "Architectural Elevator 1:Communication Corridor Plans, Sections & Details." (1 page(s), 2/26/1980)
- ML20260F134 - "Architectural:Control Bldg,Stair C-1,Plans & Section." (1 page(s), 8/24/1978)
- ML20260F090 - "Architectural:Control Bldg & Communication Corridor Floor Plan,Elevations 2,073 Ft,6 Inches & Roof Plan,Elevation 2,087 Ft,2 Inches." (1 page(s), 4/4/1979)
- ML20260F053 - "Architectural:CMU Wall Penetrations,Control Bldg & Communication Corridor." (1 page(s), 3/29/1979)
- ML20260F139 - "Architectural:Communication Corridor,Stair CC-1,Plans & Section." (1 page(s), 1/7/1980)
- ML20260F079 - "Architectural:Control & Diesel Generator Bldgs & Communication Corridor,Floor Plans,Elevations 2,032 & 2,047 Ft." (1 page(s), 4/4/1979)
- ML20260F112 - "Architectural:Access Control & Control Room Areas,Interior Elevations." (1 page(s), 4/19/1979)
- ML20260F116 - "Architectural:Control Bldg & Communication Corridor, Miscellaneous Details & Stairs C-2,CC-2 & CC-3." (1 page(s), 3/7/1979)
- ML20260F063 - "Architectural:Control & Diesel Generator Bldgs & Communication Corridor,Floor Plans,Elevations 1,974 & 1,984 Ft." (1 page(s), 9/11/1978)
- ML20260F024 - "Architectural:CMU Wall Penetrations,Control Bldg & Communication Corridor." (1 page(s), 1/23/1980)
- ML20260F049 - "Architectural:Auxiliary Bldg,Elevator2,Plans & Sections." (1 page(s), 10/4/1978)
- ML20260F030 - "Architectural:Auxiliary Bldg,Stairs A-1 & A-1A,Plans & Sections." (1 page(s), 10/4/1978)
- ML20260F104 - "Architectural:Access Control Floor Plan,Elevation 1,984 Ft." (1 page(s), 8/29/1978)
- ML20260F120 - "Architectural:Hot Lab Equipment & Furniture Layout, Elevations & Details,Elevation 1,984 Ft." (1 page(s), 9/15/1978)
- ML20260F069 - "Architectural:Control & Diesel Generator Bldgs & Communication Corridor,Floor Plans,Elevations 2,000 & 2,016 Ft." (1 page(s), 4/4/1979)
- ML20260F125 - "Architectural:Computer Room & Control Room Detailed Floor Plans,Elevation 2,047 Ft,6 Inches." (1 page(s), 1/28/1980)
- ML20260F083 - "Architectural:General Masonry Details." (1 page(s), 1/28/1980)
- ML20260E991 - "Architectural:Auxiliary & Reactor Bldg Floor Plan, Elevation 2,000 Ft." (1 page(s), 4/4/1979)
- ML20260F057 - "Architectural:CMU Wall Penetrations,Control Bldg & Communication Corridor." (1 page(s), 3/5/1980)
- ML20260F039 - "Architectural:Auxiliary Bldg,Stair A-2,Plans & Sections." (1 page(s), 10/4/1978)
- ML20260F044 - "Architectural:CMU Wall Penetrations,Control Bldg & Communication Corridor." (1 page(s), 3/13/1980)
- ML20260F019 - "Architectural:Auxiliary & Reactor Bldg Floor Plans, Elevations 1,988 Ft,1,989 Ft & 2,013 Ft,6 Inches." (1 page(s), 4/4/1979)
- ML20260F032 - "Architectural:CMU Wall Penetrations,Control Bldg & Communication Corridor." (1 page(s), 3/29/1979)
- ML20260F095 - "Architectural:General Masonry Details." (1 page(s), 10/22/1979)