Home > NRC Library > ADAMS Public Documents
FOIA/PA-2002-0184 - Resp 1 - Final
Accession Number: ML020950217
Date Released: Wednesday, April 10, 2002
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML020950084 - FOIA/PA-2002-0184 - Resp 1 - Final (5 page(s), 4/2/2002)
- ML020950094 - Differing Proffessional View (DPV) - 2000-01 re restart of Indian Point 2 due to state of emergency preparedness. (1 page(s), 3/30/2000)
- ML020950096 - E-mail from W. Lanning to D. Silk (1 page(s), 4/3/2000)
- ML020950100 - E-mail from W. Lanning to G. Pangburn & B. Fewell subject: DPV Regarding Restart of IP2 Memo (1 page(s), 4/3/2000)
- ML020950105 - E-mail from N. McNamara to D. Silk & W. Lanning subject: Re IP2 DPV (1 page(s), 4/6/2002)
- ML020950109 - Differing Professional View (DPV) Regarding Therestart of Indian Point Unit 2 Due to the State of Emergency Preparedness (13 page(s), 3/30/2000)
- ML020950126 - NUREG/BR-0161, Revision 1, NRC's Differing Professional Views and Opinions Process. (2 page(s), 4/2/2002)
- ML020950114 - E-mail from B. Holian to D. Silk, H. Miller & B. Fewell Re: DPV Withdrawn (1 page(s), 5/5/2000)
- ML020950116 - E-mail from D. Silk t B. Holian, N. McNamara, & J. B. Fewell Re: DPV Withdrawn (1 page(s), 5/4/2000)
- ML020950120 - E-mail from H. Miller to B. Holian, R. Conte, R. Bores & W. Lanning Re: Coordination with FEMA - IP-2 (1 page(s), 4/20/2000)
- ML020950131 - E-mail from D. Silk to B. Holian, N. McNarama & P. Eselgroth Re: IP2 emergency preparedness Issues (1 page(s), 3/30/2000)
- ML020950140 - E-mail fro R. Conte to B. Holian, D. Silk & McNarama Re: IP2 EP Discussions (18 page(s), 3/24/2000)
- ML020950144 - E-mail from R. Conte to R. Blough, b. Holian & D. Brass Re: EP Restart Issue (2 page(s), 3/24/2000)
- ML020950149 - E-mail from R. Conte to R. Blough, B. Holian & D. Silk Re: EP Restart Issue (2 page(s), 3/24/2000)
- ML020950153 - E-mail from D. Silk to R. Conte Subject: IP2 EP "Followup" Inspection. (1 page(s), 3/23/2000)
- ML020950163 - E-mail fro B. Holian from R. Crlenjak & W. Lanning Subject: EP at IP2 (1 page(s), 3/21/2000)
- ML020950171 - E-mail from W. Raymond to N. McNarama Subject: Accountability Drill Results (1 page(s), 3/30/2000)
- ML020950189 - Directive Transmittal - Subject: Transmittal of Directive 10.159, " Differing Professional View of Opinions" (1 page(s), 8/15/1998)
- ML020950197 - IR 05000247/2000-006, Indian Point 2, inspection on 05/15/2000 - 06/02/2000 re onsite exercise conducted on June 1, 2000. (27 page(s), 7/14/2000)
- ML020950201 - Handwritten notes (2 page(s), 3/29/2000)
- ML020950204 - Handwritten notes (3pages) (3 page(s), 3/28/2000)
- ML020950160 - Handwritten notes (4 pages) (4 page(s), 3/27/2000)
- ML020950168 - Handwritten notes (2 pages) (2 page(s), 4/2/2002)
- ML020950191 - Preliminary root cause investigation form Con-Ed SL1 Investigation & LER (22 page(s), 3/21/2002)
- ML020950729 - LER 00-001-00, Indian Point Unit, 2 - Manual Reactor Trip Following Steam Generator Tube Rupture dtd 03/17/2000 (13 page(s), 3/17/2002)
- ML020950207 - E-mail from D. Silk to B. Holian, P. Eselgroth, R. Conte, R. Crlenjak & S. Barber Subject: Fwd DPV re: Restart of Indian Point (2 page(s), 3/1/2002)
- ML020950209 - E-mail from R. Conte to B. Holian, C. Miskey, D. Silk P. Eselgroth, R. Crlenjak, & S. Barber Subject: Fwd: DPV re Restart of Indian Point (1 page(s), 3/1/2002)
- ML020950211 - E-mail from S. Barber to D. Silk Subject: Fwd: DPV re Restart of Indian Point (1 page(s), 3/4/2002)