Home > NRC Library > ADAMS Public Documents
Peach Bottom Atomic Power Station, Units 2 and 3, Submittal of Revision 29 to Updated Final Safety Analysis Report and Rev. 24 to Fire Protection Program - Redacted Files (EPID: L-2023-LRO-0038)
Accession Number: ML23172A253
Date Released: Friday, June 30, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23172A262 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 7, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23172A270 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23172A275 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix A, Table of Contents - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23172A280 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 9, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23172A281 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23172A284 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix C, Table of Contents - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A013 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 thru 4 - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A015 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Sections 1 thru 10 - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A016 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures - Redacted Rev1 (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A017 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 thru 23 - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A020 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 6, Core Standby Cooling Systems - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A023 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 12, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A025 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix R, Second License Renewal UFSAR Supplement, Pages R-1 to R-89 - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A029 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 8, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A033 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A037 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix A, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A038 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix M , Containment Report - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A040 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A043 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A045 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A048 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A049 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix A, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A052 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix J, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A055 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix E, Station Atmospheric Release Limit Calculations - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A056 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 thru 24 - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A057 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A058 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Chapter 10, Figures - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)
- ML23173A059 - Peach Bottom Atomic Power Station, Units 2 & 3, Revision 29 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted (EPID: L-2023-LRO-0038) (4/10/2023)