Home > NRC Library > ADAMS Public Documents
Turkey Point Units 6 & 7, Submittal of Tier 1 and Integrated Final Safety Analysis Report, Revision 0.
Accession Number: ML19003A318
Date Released: Tuesday, February 19, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19003A292 - Turkey Point Units 6 & 7, Submittal of Tier 1 and Integrated Final Safety Analysis Report, Revision 0. (18 page(s), 12/21/2018)
- ML19003A296 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant. (440 page(s), 12/21/2018)
- ML19003A298 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Table of Contents. (50 page(s), 12/21/2018)
- ML19003A299 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Site Characteristics. (10 page(s), 12/21/2018)
- ML19003A300 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.1, Geography and Demography. (40 page(s), 12/21/2018)
- ML19003A301 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.2, Nearby Industrial, Transportation, and Military Facilities. (61 page(s), 12/21/2018)
- ML19003A302 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.3, Meteorology. (161 page(s), 12/21/2018)
- ML19003A304 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering. (44 page(s), 12/21/2018)
- ML19003A306 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.2, Floods. (40 page(s), 12/21/2018)
- ML19003A307 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.3, Probable Maximum Flood on Streams and Rivers. (2 page(s), 12/21/2018)
- ML19003A308 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.4, Potential Dam Failures. (2 page(s), 12/21/2018)
- ML19003A309 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.5, Probable Maximum Surge and Seiche Flooding. (26 page(s), 12/21/2018)
- ML19003A311 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.6, Probable Maximum Tsunami Hazards. (184 page(s), 12/21/2018)
- ML19003A312 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.7, Ice Effects. (7 page(s), 12/21/2018)
- ML19003A313 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.8, Cooling Water Canals and Reservoirs. (2 page(s), 12/21/2018)
- ML19003A314 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.9, Channel Diversions. (4 page(s), 12/21/2018)
- ML19003A315 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.10, Flooding Protection Requirements. (1 page(s), 12/21/2018)
- ML19003A317 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.11, Low Water Considerations. (7 page(s), 12/21/2018)
- ML19003A319 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Groundwater. (87 page(s), 12/21/2018)
- ML19003A320 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Appendix 2AA, Transducer Data. (19 page(s), 12/21/2018)
- ML19003A321 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Appendix 2BB - Aquifer Pumping Test Results. (96 page(s), 12/21/2018)
- ML19003A322 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Appendix 2CC, Groundwater Model Development and Analysis. (119 page(s), 12/21/2018)
- ML19003A323 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Figures 201-225. (30 page(s), 12/21/2018)
- ML19003A324 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Figures 226-247. (35 page(s), 12/21/2018)
- ML19003A325 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.12, Figures 248-End. (12 page(s), 12/21/2018)
- ML19003A326 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.13, Accidental Releases of Radioactive Liquid Effluents in Ground and Surface Waters. (45 page(s), 12/21/2018)
- ML19003A327 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.14, Technical Specification and Emergency Operation Requirements. (1 page(s), 12/21/2018)
- ML19003A328 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.4.15, Combined License Information. (1 page(s), 12/21/2018)
- ML19003A329 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology, and Geotechnical Engineering. (7 page(s), 12/21/2018)
- ML19003A330 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Basic Geologic and Seismic Information. (259 page(s), 12/21/2018)
- ML19003A331 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 201-228. (31 page(s), 12/21/2018)
- ML19003A332 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 229-252. (24 page(s), 12/21/2018)
- ML19003A333 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 253-278. (30 page(s), 12/21/2018)
- ML19003A344 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 279-303. (25 page(s), 12/21/2018)
- ML19003A345 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 304-322. (21 page(s), 12/21/2018)
- ML19003A334 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 323-367. (55 page(s), 12/21/2018)
- ML19003A335 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.1, Figures 368-End. (30 page(s), 12/21/2018)
- ML19003A336 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.2, Vibratory Ground Motion. (269 page(s), 12/21/2018)
- ML19003A337 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.3, Surface Faulting. (18 page(s), 12/21/2018)
- ML19003A338 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.4, Stability of Subsurface Materials and Foundations. (205 page(s), 12/21/2018)
- ML19003A339 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.5, Stability of Slopes. (3 page(s), 12/21/2018)
- ML19003A340 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.5.6, Combined License Information. (2 page(s), 12/21/2018)
- ML19003A341 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Appendix 2.5AA, Potential for Carbonate Dissolution and Karst Development at the Turkey Point Units 6 & 7 Site. (42 page(s), 12/21/2018)
- ML19003A342 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 2, Section 2.6, References. (1 page(s), 12/21/2018)
- ML19003A347 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Table of Contents. (33 page(s), 12/21/2018)
- ML19003A348 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.1, Conformance with Nuclear Regulatory Commission General Design Criteria. (29 page(s), 12/21/2018)
- ML19003A349 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.2, Classification of Structures, Components, and Systems. (94 page(s), 12/21/2018)
- ML19003A350 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.3, Wind and Tornado Loadings. (6 page(s), 12/21/2018)
- ML19003A351 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.4, Water Level (Flood) Design. (24 page(s), 12/21/2018)
- ML19003A352 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.5, Missile Protection. (18 page(s), 12/21/2018)
- ML19003A353 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.6, Protection Against the Dynamic Effects Associated with the Postulated Rupture of Piping. (50 page(s), 12/21/2018)
- ML19003A354 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.7, Seismic Design. (121 page(s), 12/21/2018)
- ML19003A355 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures. (181 page(s), 12/21/2018)
- ML19003A356 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems and Components. (161 page(s), 12/21/2018)
- ML19003A357 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.10, Seismic and Dynamic Qualification of Seismic Category I Mechanical and Electrical Equipment. (7 page(s), 12/21/2018)
- ML19003A358 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. (57 page(s), 12/21/2018)
- ML19003A360 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3A, HVAC Ducts and Duct Supports. (3 page(s), 12/21/2018)
- ML19003A361 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3B, Leak-Before-Break Evaluation of the AP1000 Piping. (40 page(s), 12/21/2018)
- ML19003A362 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3C, Reactor Coolant Loop Analysis Methods. (4 page(s), 12/21/2018)
- ML19003A363 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3D, Methodology for Qualifying AP1000 Safety-Related Electrical and Mechanical Equipment. (107 page(s), 12/21/2018)
- ML19003A364 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3E, High-Energy Piping in the Nuclear Island. (10 page(s), 12/21/2018)
- ML19003A366 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3F, Cable Trays and Cable Tray Supports. (3 page(s), 12/21/2018)
- ML19003A367 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3G, Nuclear Island Seismic Analyses. (75 page(s), 12/21/2018)
- ML19003A368 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3H, Auxiliary and Shield Building Critical Sections. (78 page(s), 12/21/2018)
- ML19003A369 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3I, Evaluation for High Frequency Seismic Input. (72 page(s), 12/21/2018)
- ML19003A370 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3JJ, Soil Structure Interaction Soil Profiles and Input Motions. (115 page(s), 12/21/2018)
- ML19003A371 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3KK, Site Specific Seismic Evaluation Report (Part 1). (132 page(s), 12/21/2018)
- ML19003A372 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 3, Appendix 3KK, Site Specific Seismic Evaluation Report (Part 2). (99 page(s), 12/21/2018)
- ML19003A373 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 4, Reactor. (192 page(s), 12/21/2018)
- ML19003A374 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (197 page(s), 12/21/2018)
- ML19003A375 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (277 page(s), 12/21/2018)
- ML19003A377 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (185 page(s), 12/21/2018)
- ML19003A378 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 8, Electric Power. (91 page(s), 12/21/2018)
- ML19003A379 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (585 page(s), 12/21/2018)
- ML19003A380 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion. (139 page(s), 12/21/2018)
- ML19003A382 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (223 page(s), 12/21/2018)
- ML19003A387 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 12, Radiation Protection. (198 page(s), 12/21/2018)
- ML19003A388 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 13, Conduct of Operation. (82 page(s), 12/21/2018)
- ML19003A389 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 14, Initial Test Program. (195 page(s), 12/21/2018)
- ML19003A406 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 15, Accident Analyses. (641 page(s), 12/21/2018)
- ML19003A407 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 16, Technical Specifications. (54 page(s), 12/21/2018)
- ML19003A408 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 17, Quality Assurance. (36 page(s), 12/21/2018)
- ML19003A409 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 18, Human Factors Engineering. (82 page(s), 12/21/2018)
- ML19003A410 - Turkey Point Units 6 & 7, Revision 0 to Integrated Final Safety Analysis Report, Chapter 19, Probabilistic Risk Assessment. (389 page(s), 12/21/2018)
- ML19003A411 - Turkey Point Units 6 & 7, Integrated Final Safety Analysis Report Tier 1, Rev. 0. (561 page(s), 12/21/2018)