Home > NRC Library > ADAMS Public Documents
FOIA/PA-2004-0307 - Resp 1 - Partial.
Accession Number: ML042960166
Date Released: Tuesday, October 19, 2004
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML042960170 - FOIA/PA-2004-0307 - Resp 1 - Partial. (14 page(s), 10/8/2004)
- ML032830027 - Palo Verde, Units 1, 2, and 3 - Response to RAI to Proposed Amendments to Technical Specifications 3.2.4, 3.3.1, and 3.3.3. (17 page(s), 9/18/2003)
- ML041670642 - Augmented Inspection Team Charter; Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Complete Loss of Offsite Power and Multiple Mitigating System Failures. (5 page(s), 6/15/2004)
- ML041760260 - Palo Verde Nuclear Generating Station - Information Regarding PVNGS Offsite Power Grid Reliability. (4 page(s), 6/17/2004)
- ML042020061 - IR 05000528-04-012; IR 05000529-04-012; and IR 05000530-04-012; June 14 through July 12, 2004, and completed on June 18, 2004; Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Augmented Inspection. (68 page(s), 7/16/2004)
- ML042960590 - Palo Verde Transmission System graph. (1 page(s), 10/8/2004)
- ML042960591 - Map, "Common Western Oasis Map." (1 page(s), 10/8/2004)
- ML042960212 - Engineering White Paper, "13.8kV Breaker Failures during Loss of Switchyard Event on 6/14/04." (2 page(s), 10/8/2004)
- ML042960215 - 40EP-9EO10, Rev. 32, Standard Appendices, "Appendix 51, Electric Plant Single Line Diagram." (1 page(s), 10/8/2004)
- ML042960592 - Drawing, G-33300, " Westwing 230KV Switchyard Bay 1-9 One Line Diagraw." (7 page(s), 10/8/2004)
- ML042960220 - Chart begining with Hydrogen, H2. Chart beginning with Hydrogen, H2. (1 page(s), 10/8/2004)
- ML042960225 - Westwing T1 Bank, Westwing T4 Bank and Westwing T10 Bank. (2 page(s), 10/8/2004)
- ML042960593 - Personnel Statement. (7 page(s), 10/8/2004)
- ML042960232 - PVTS-01, Revision 8, "SRP Approved Version Palo Verde Transmission System Interchange Scheduling and Congestion Management Procedure." (54 page(s), 10/8/2004)
- ML042960277 - Palo Verde, Units 1, 2 and 3, Response to NRC Request for Additional Information Regarding Proposed Amendment to Technical Specifications (TS) 3.8.1, AC Sources - Operating and 3.3.7, Diesel Generator (DG) - Loss of Voltage Start (LOVS). (20 page(s), 7/16/1999)
- ML042960594 - Letter from Robert Smith to Nancy Bruce, Steve Kessler, Harvey Leake, Stephen Pease re: records of final report for 2002 Palo Verde Hassayampa Operating Study. (73 page(s), 6/5/2002)
- ML042960278 - Email from James C. Hsu to Harvey Leake, subject: PV2 UFSAR Final 112603. (15 page(s), 12/4/2003)
- ML042960280 - Licensing Document Change Request, Log No. 2003F040, Palo Verde, Units 1, 2 and 3, UFSAR. (11 page(s), 3/9/2004)
- ML042960283 - Log Date and Entry Form for 6/14/2004 - 6/15/2004. (7 page(s), 6/14/2004)
- ML042960285 - Palo Verde LOOP Event 6/14/04 Sequence of Events. (1 page(s), 6/14/2004)
- ML042960596 - Palo Verde Nuclear Generating Station, Sequence of Event on Monday, June 14, 2004. (4 page(s), 6/14/2004)
- ML042960597 - June 14, 2004 Event Palo Verde Switchyard Voltage. (5 page(s), 6/14/2004)
- ML042960291 - 06/14/2004 Problem Identification Report regarding all three units at Palo Verde experienced automatic reactor trips coinciding with a grid disturbance. (9 page(s), 6/14/2004)
- ML042960295 - E-mail from, Steven Kesier to Panos Paramithas re: Statue report - WAPA Liberty/Westwing and SRP Agua Fria/Westwing 230kv lines. (3 page(s), 6/15/2004)
- ML042960346 - Problem Identification Report. (3 page(s), 6/15/2004)
- ML042960350 - Event Log - 2004-06-14 - Transmission & Sub-Transmission System Events. (4 page(s), 6/15/2004)
- ML042960353 - Email from Steven Kesler to Panos Paramithas and Harvey Leake, subject: Digital pictures of the Failed AR Relay. (5 page(s), 6/16/2004)
- ML042960363 - Email from Steven Kesler to Panos Paramithas and Harvey Leake, subject: Additional Digital Pictures of the Failed AR Relay. (3 page(s), 6/16/2004)
- ML042960373 - Email from Panos Paramithas to Donald Straka, subject: FW: Status report - WAPA Liberty/Westwing and SRP Agua Fria/Westwing 230kv lines. (6 page(s), 6/16/2004)
- ML042960402 - Pv Unit 1 Archived Operator Log. (4 page(s), 6/14/2004)
- ML042960407 - E-mail from G. Michael, APSC, to Mel Fields and Troy Pruett, NRC, re: materials for APS offsite power discussion. (11 page(s), 6/17/2004)
- ML042960415 - E-mail from G. Michael, APSC, to Mel Fields and Troy Pruett, NRC, re: materials for APS Offsite Power Discussion. (3 page(s), 6/17/2004)
- ML042960423 - Problem Identification Report - CRDR initiated to provide a significant investigation of the 06/14/04 loss of offsite power initiating event, specifically the phase C-to-ground fault of the Westwing liberty line. (8 page(s), 6/16/2004)
- ML042960427 - Archive Retrieval - 1 PT Trend. (10 page(s), 6/18/2004)
- ML042960221 - E-mail from George Skinner to Anthony Gody re Report Input. (1 page(s), 6/24/2004)
- ML042960226 - Fax - Offsite Power 13.8kv Breaker Action Plan, Revision 2. (5 page(s), 6/24/2004)
- ML042960228 - E-mail from George Skinner to Anthony Gody re: Additional Report Input. (1 page(s), 6/25/2004)
- ML042960234 - Licensee e-mail to "Dave" (1 page(s), 10/8/2004)
- ML042960235 - Final Results for Palo Verde. (1 page(s), 10/8/2004)
- ML042960240 - Page Heading starts with "Palo Verde, Danger Will Robinson: If you change cell locations you may break the V." (10 page(s), 10/8/2004)
- ML042960241 - List of files: Page Heading start with Name, Size Modified, Comment. (2 page(s), 10/8/2004)
- ML042960245 - Graph, botton title says, PVNGS Outage 061404 - System Operations Update - GWH. (1 page(s), 10/8/2004)
- ML042960598 - Handwritten note to "Dwight" USAR and GDC-17 Items on Offsite Power Requirement..... (13 page(s), 10/8/2004)
- ML042960289 - Palo Verde Offsite Power Supply Compliance with GDC 17. (2 page(s), 10/8/2004)
- ML042960251 - Palo Verde Nuclear Generating Station Standard Appendices. Page 425 of 1,037. (1 page(s), 10/8/2004)
- ML042960600 - Revision 10 to Procedure 40EP-9EO07, "Palo Verde Nuclear Generating station Loss of Offsite Power/Loss of Forced Circulation." Pages 1-12 of 52. (12 page(s), 10/8/2004)
- ML042960253 - Palo Verde Transmission System graph. (4 page(s), 10/8/2004)
- ML042960258 - Page starts with "The Nuclear Regulatory Commission's Management Directive 8.;3, "Incident Investigation Program." (1 page(s), 10/8/2004)
- ML042960260 - Page starts with " Risk Significance of the Event..... (2 page(s), 10/8/2004)
- ML042960263 - 0803 Gas Turbine Generator 1 energizing NAN S07. (1 page(s), 10/8/2004)
- ML042960266 - Note from Robert Buell from INEEL to "Don." (2 page(s), 10/8/2004)
- ML042960279 - Drawing 13-E-MAA-001, Rev. 21, "Main Single Line Diagram." (1 page(s), 4/2/2004)
- ML042960273 - Graph Titled, "Palo Verde 500 Voltage." (1 page(s), 6/14/2004)
- ML042960286 - PNO-IV-04-012 - Palo Verde - Complete Loss of Offsite Power. (1 page(s), 6/14/2004)
- ML042960298 - Palo Verde, Unit 2 Recovery Curves. (1 page(s), 6/14/2004)
- ML042960307 - Palo Verde Nuclear Generating State Sequence of Events on Monday, June 14, 2004. (5 page(s), 6/14/2004)
- ML042960602 - Palo Verde Nuclear Generating Station Sequence of Events on Monday, June 14, 2004. (7 page(s), 6/14/2004)
- ML042960311 - E-mail regarding APS letter on PVNGS Offsite Power Grid Reliability. (1 page(s), 6/17/2004)
- ML042960314 - APS letter to Document Control Desk re: Information on PVNGS Offsite Power Grid Reliability. (4 page(s), 6/17/2004)
- ML042960318 - APS Phone Call with NRC - Agenda. (1 page(s), 6/14/2004)
- ML042960319 - Information Needed for Risk Analysis of Loss of Offsite Power Events (2 page(s), 6/17/2004)
- ML042960323 - E-mail from David Loveless to Dom Marksberry re: Input for LOOP analysis. (1 page(s), 6/17/2004)
- ML042960325 - E-mail from Gerald Sowers, PVNGS, to David Loveless, NRC RIV re: PVNGS Electrical Single Line. (1 page(s), 6/22/2004)
- ML042960371 - Electrical Sequence of Events. (4 page(s), 6/24/2004)
- ML042960385 - 06/24/2004 E-mail from David Loveless to Millard Wohl, Subject: Re: Palo Verde LOOP. (1 page(s), 6/24/2004)
- ML042960401 - 06/25/2004 E-mail from Gerard D'Aunoy to David P. Loveless, Subject: PVNGS Base Model. (1 page(s), 6/25/2004)
- ML042960408 - 06/25/2004 E-mail from Steve Kesler to Thomas Koshy, Subject: RE: Electronic Copy of Palo Verde Switchyard Voltage. (2 page(s), 6/25/2004)
- ML042960416 - 06/25/2004 E-mail from Mark A. Hulet to David P. Loveless, Subject: PVNGS LOOP Event 6/14/04 PRA Information. (1 page(s), 6/25/2004)
- ML042960420 - 06/28/2004 E-mail from David Loveless to Don Marksberry, Subject Re: S/U transformer soak times. (1 page(s), 6/28/2004)
- ML042960426 - 06/28/2004 E-mail from David Loveless to Don Marksberry, Subject Re: Last questions and concerns. (1 page(s), 6/28/2004)
- ML042960431 - 06/29/2004 E-mail from David Loveless to Tony Gody, Subject: ACT: time line additions. (5 page(s), 6/29/2004)
- ML042960437 - 06/29/2004 E-mail from Gerald W. Sowers to David P. Loveless, Subject Gas Turbine Failures. (2 page(s), 6/29/2004)
- ML042960474 - 06/29/2004 E-mail from Gerald Sowers to David P. Loveless, Subject Gas Turbine Failures. (2 page(s), 6/29/2004)
- ML042960441 - 06/29/04 E-mail from Arizona Public Service Co. to Timothy McConnell, Subject: GTG#1 Operating Instructions. (1 page(s), 6/29/2004)
- ML042960447 - 06/29/2004 E-mail from Robert F Buell to Don Marksberry, Subject: Palo Verde Model. (2 page(s), 6/29/2004)
- ML042960411 - 06/30/2004 E-mail from Gerald Sowers to David Loveless, Subject: FW: Gas Turbine Failures. (2 page(s), 6/30/2004)
- ML042960419 - 07/01/2004 E-mail from David Loveless to Don Marksberry, Subject: Re: EOPs. (1 page(s), 7/1/2004)
- ML042960421 - 07/06/2004 E-mail from Chuck Paulk to Tony Gody, Subject: Re: Fwd: FW: Westwing Oil Sample Results. (1 page(s), 7/6/2004)
- ML042960424 - 07/06/2004 E-mail from Chuck Paulk to Tony Gody, Subject: Re: Fwd: FW: Westwing Oil Sample Results. (1 page(s), 7/6/2004)
- ML042960425 - 07/09/2004 E-mail from Jim Melfi to Check Paulk, Nancy Salgado; Timothy McConnell and Troy Pruett, Subject: FYI - Some pictures from the phoenix transformer fire. (5 page(s), 7/9/2004)
- ML042960604 - Drawing, "Transmission System." (1 page(s), 10/8/2004)
- ML042960429 - Photos. "Severed Clevis.jph," "73-SRP-Y-Clevis.jph" and "73-WAPA-Y-Clevis.j." (3 page(s), 10/8/2004)
- ML042960433 - Background, on 6/15/04, Work Mech #2715799 issued to troubleshoot the reason for the RCP Bearing Oil Lift Pump 2M-RCN-P02B tripping the overload heaters, Electrical Maintenance dispatched to investigate. (1 page(s), 6/15/2004)
- ML042960439 - Unit 1 Letdown/NC FSL-613 Issue. (2 page(s), 10/8/2004)
- ML042960444 - NRC URI's ERO Issues. (2 page(s), 10/8/2004)
- ML042960608 - Drawing 13-E-WAA-001, Rev. 21, "Main Single Line Diagram." (1 page(s), 10/8/2004)
- ML042960450 - "Discussion and Proposed Resolution of NRC AIT URI (unresolved issue) Relating to Charging Pump "E" Operation (Unit 2 6/14/04 LOOP Trip)." (3 page(s), 7/2/2004)
- ML042960453 - "Discussion and Proposed Resolution of NRC AIT URI (unresolved issue) Concerning Tech Spec Tracking During the Following EOP Use (Unit 2 6/14/04 LOOP Trip)." (3 page(s), 7/2/2004)
- ML042960457 - 2EPKAF11 and 2EPKCF13 Battery Discharge on 06/14/2004. (2 page(s), 6/14/2004)
- ML042960461 - Preliminary Root Cause of Failure Analysis Emergency Diesel Generator 2A Failure to Carry Load. (2 page(s), 6/14/2004)
- ML042960327 - Preliminary Sequence of Events 6/14/2004 PVNGS LOOP. (1 page(s), 6/14/2004)
- ML042960329 - West Wing Oil Sample Results. (1 page(s), 6/18/2004)
- ML042960330 - Attachment C, CRDR 2715727 SWMS Attached Media for Unit 1 Trip. (14 page(s), 6/22/2004)
- ML042960331 - Attachment C, CRDR 2715659 SWMS Attached Media for Unit 3 Trip. (19 page(s), 6/22/2004)
- ML042960334 - Attachment C, CRDR 2715659 SWMS Attached Media for Unit 2 Trip. (12 page(s), 6/22/2004)
- ML042960335 - 06/23/2004 E-mail from Don Straka to Anthony Gody, Subject: FW: Standard Trip Evaluations for the Unit 1 Trip on June 14, 2004. (1 page(s), 6/23/2004)
- ML042960336 - 06/23/2004 E-mail from Don Straka to Anthony Gody, Subject: FW: Standard trip evaluations for the Unit 2 Trip on 06/14/04 - CRDR 2715709. (1 page(s), 6/23/2004)
- ML042960337 - 06/23/2004 E-mail from Don Straka to Anthony Gody, Subject: FW: Standard trip evaluations for the Unit 3 Trip on 06/14/04. (1 page(s), 6/23/2004)
- ML042960339 - 06/24/2004 E-mail from Don Straka to Anthony Gody and Chuck Paulk, Subject: Teleconference Call 6/24/04. (1 page(s), 6/24/2004)
- ML042960340 - 06/24/2004 E-mail from Don Straka to Anthony Gody, Subject: FW: DRAFT Integrated Timeline of Three Unit LOOP on 6/14/04 - As Requested by NRC on 6/24/04. (1 page(s), 6/24/2004)
- ML042960341 - 06/24/2004 E-mail from Don Straka to Anthony Gody, Subject: AIT public exit date. (1 page(s), 6/24/2004)
- ML042960342 - 06/25/2004 E-mail from Don Straka to Anthony Goody, subject: FW: AIT RFIs from Paulk. (2 page(s), 6/25/2004)
- ML042960343 - "Evaluation of CVCS Soft Parts due to High Temperature Letdown Event." (2 page(s), 6/28/2004)
- ML042960358 - 06/28/04 E-mail from D. Straka Regarding Unit 2 Trip/EDG 2A Loss of Voltage. (1 page(s), 6/28/2004)
- ML042960361 - 06/28/04 E-mail from D. Straka Regarding AIT "Open" Action Items and the Full RFI Listing. (1 page(s), 6/28/2004)
- ML042960367 - 06/29/04 E-mail from D. Straka Regarding AIT RFI Open Items Teleconference. (1 page(s), 6/29/2004)
- ML042960370 - 06/29/04 E-mail from D. Straka Regarding AIT2004.xis. (10 page(s), 6/29/2004)
- ML042960379 - AIT 2004.xis. (12 page(s), 10/8/2004)
- ML042960382 - AIT 2004 open.xls. (1 page(s), 10/8/2004)
- ML042960388 - 06/29/04 E-mail from D. Straka Regarding NRC AIT Exit Meeting. (1 page(s), 6/29/2004)
- ML042960390 - 07/01/04 E-mail from D. Straka Regarding Generator MEL WM. (1 page(s), 7/1/2004)
- ML042960394 - 07/01/04 E-mail from D. Straka Regarding RFI Number 117. (1 page(s), 7/1/2004)
- ML042960396 - 07/01/04 E-mail from D. Straka Regarding Switchyard Voltage. (1 page(s), 7/1/2004)
- ML042960355 - E-mail from D. Straka Regarding Current Information on Testing Performance for Unit 1 ADV 185. (2 page(s), 10/18/2004)
- ML042960360 - Report Regarding Voltage Regulator Cabinet. (2 page(s), 7/1/2004)
- ML042960366 - "Discussion and Proposed Resolution of NRC AIT URI (unresolved issue) Relating to MSIS Impact on AF-A Operability (6/14/04 Three Unit LOOP Trip)." (2 page(s), 7/2/2004)
- ML042960368 - 07/02/04 E-mail from D. Straka Regarding EDG 2A Preliminary Root Cause of Failure Analysis. (1 page(s), 7/2/2004)
- ML042960374 - 07/02/04 E-mail from D. Straka Regarding Testing Performed for Unit 1 ADV 185. (3 page(s), 7/2/2004)
- ML042960383 - 07/02/04 E-mail from D. Straka Regarding AIT URI - Thermal Induced Vibration of Unit 1 Aux Feed f/wpiping. (1 page(s), 7/2/2004)
- ML042960389 - Report Regarding Problem Identification. (8 page(s), 7/2/2004)
- ML042960393 - Draft Preliminary Root Cause of Failure Analysis 13.8kV Breaker Failures During Losss of Switchyard Event. (10 page(s), 7/5/2004)
- ML042960399 - 07/06/04 E-mail from D. Straka Regarding NRC Response for Review. (1 page(s), 7/6/2004)
- ML042960403 - 07/06/04 E-mail from D. Straka Regarding AIT Teleconference Call on 07/07/04. (1 page(s), 7/6/2004)
- ML042960406 - 07/06/04 E-mail from D. Straka Regarding TSC DG Final AIT Issue Reponse. (1 page(s), 7/6/2004)
- ML042960434 - 07/06/04 E-mail from D. Straka Regarding NRC AIT URI Response to CH-E Operation AIT Charging Pump Issue. (1 page(s), 7/6/2004)
- ML042960442 - 07/06/04 E-mail from D. Straka Regarding NRC AIT URI for EOP vs TS. (1 page(s), 7/6/2004)
- ML042960448 - 07/06/04 E-mail from D. Straka Regarding MSIS Procedure - Loss of Aux Feed Drains Issue. (1 page(s), 7/6/2004)
- ML042960454 - 07/06/04 E-mail from D. Straka Regarding Oil Lift Pump. (1 page(s), 7/6/2004)
- ML042960460 - 07/06/04 E-mail from D. Straka Regarding 13.8kV Breaker Failure to Close Preliminary ERCFA/NRC Update. (2 page(s), 7/6/2004)
- ML042960469 - 07/06/04 E-mail Regarding Oil Lift Pump. (2 page(s), 7/6/2004)
- ML042960473 - 07/06/04 E-mail from D. Straka Regarding Westwing Oil Sample Results. (3 page(s), 7/6/2004)
- ML042960480 - 07/06/04 E-mail Regarding Oil Lift Pump. (2 page(s), 7/6/2004)
- ML042960485 - 07/06/04 E-mail Regarding OPS Night Order - Emergency Planning Information. (1 page(s), 7/6/2004)
- ML042960491 - 07/06/04 E-mail Regarding Unit 1 Letdown T-Mod Write-Up. (1 page(s), 7/6/2004)
- ML042960483 - E-mail from D. Straka Regarding AIT Issues Response for the 13.8 kV Breakers. (1 page(s), 10/18/2004)
- ML042960488 - 07/06/04 E-mail Regarding Train E Charging Pump Issues - Response. (1 page(s), 7/6/2004)
- ML042960496 - Palo Verde LOOP Risk Assessment. (2 page(s), 10/18/2004)
- ML042960499 - Slide 1, Augmented Inspectin Team Exit Meeting with Palo Verde Nuclear Generation Station. (32 page(s), 10/18/2004)
- ML042960503 - Slides 1-15, Augmented Inspection Team Exit Meeting with Palo Verde Nuclear Generation Station on 06/14/04. (18 page(s), 6/14/2004)
- ML042960506 - Augmented Inspection Team Exit Meeting with Palo Verde Nuclear Generation Station. (15 page(s), 10/18/2004)
- ML042960508 - Augmented Inspection Team Charter; Palo Verde Nuclear Generating Station, Units 1, 2 and 3, Complete Loss of Offsite Power and Multiple Mitigating System Failures. (3 page(s), 6/15/2004)
- ML042960512 - 06/15/04 E-mail Regarding Draft Charter for Palo Verde AIT. (4 page(s), 6/15/2004)
- ML042960513 - Palo Verde Nuclear Generating Station Augmented Team Inspection Briefing, 06/16/04. (1 page(s), 6/16/2004)
- ML042960517 - 0617/04 Phone Call with NRC - Agenda. (4 page(s), 6/17/2004)
- ML042960521 - 06/21/04 E-mail Regarding Briefing Material. (1 page(s), 6/21/2004)
- ML042960526 - 07/12/04 Meeting Notice with Arizona Public Service Co., to Present the NRC Augmented Inspection Team Findings Following the 06/14/04, Loss-of-Offsite Power Event. (4 page(s), 6/29/2004)
- ML042960528 - 06/15/04 E-mail Regarding Palo Verde AIT. (1 page(s), 6/15/2004)
- ML042960535 - 06/17/04 E-mail Regarding Input for LOOP Analysis. (3 page(s), 6/17/2004)
- ML042960539 - Safety Guide 6, "Independence Between Redundant Standby (Onsite) Power Sources and Between Their Distribution Systems." (2 page(s), 8/10/1971)
- ML042960540 - Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Re: Offsite Power Grid Reliability. (3 page(s), 7/16/2004)
- ML042960546 - Palo Verde - AIT Exit. (3 page(s), 10/18/2004)
- ML042960549 - PVNGS Updated FSAR, LDCR 02-F023, Revision 12. (13 page(s), 6/30/2003)