Skip to main content

Occupational Health (Division 8): Regulatory Guides 8.21 - 8.40

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 8, "Occupational Health," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number

Title

Revision No.

Issue
Date

Additional Information

8.21

Health Physics Surveys for Byproduct Material at NRC-Licensed Processing and Manufacturing Plants

(Withdrawn -- See 89 FR 5, 01/02/2024)

W

01/2024

 

1

10/1979

Periodic Review – July 2023 - Withdraw

Periodic Review – March 2023
Revise
 
Periodic Review - October 2012 - Considerations

0

05/1978

 

8.22

Bioassay at Uranium Mills

2

05/2014

Periodic Review – May 2024
- No Action

1

08/1988

 

0

07/1978

 

8.23

Radiation Safety Surveys at Medical Institutions

(Withdrawn -- See 83 FR 38729, 08/07/2018)

W

08/2018

 

1

01/1981

Reviewed in 2017 – Withdraw

0

02/1979

 

8.24

Health Physics Surveys During Enriched Uranium-235 Processing and Fuel Fabrication

2

06/2012

Periodic Review 2022 – No Action

1

10/1979

 

0

11/1978

 

8.25

Air Sampling in the Workplace

1

06/1992

Reviewed in 2017 – No issues identified

0

08/1980

 

8.26

Applications of Bioassay for Fission and Activation Products

0

09/1980

Reviewed in 2018 – Issues identified for future consideration

8.27

Radiation Protection Training for Personnel at Light-Water-Cooled Nuclear Power Plants

0

03/1981

Reviewed in 2017 – Issues identified for future consideration

8.28

Audible-Alarm Dosimeters

0

08/1981

Reviewed in 2018 – Revise

8.29

Instruction Concerning Risks from Occupational Radiation Exposure

1

02/1996

Reviewed in 2017 – Revise

0

07/1981

 

8.30

Health Physics Surveys in Uranium Recovery Facilities

1

05/2002

Periodic Review July 2019 – Considerations

Periodic Review April 2014 – Considerations

Periodic Review September 2011 – No Action

0

06/1983

 

8.31

Information Relevant to Ensuring that Occupational Radiation Exposures at Uranium Recovery Facilities Will Be as Low as Is Reasonably Achievable

1

05/2002

Periodic Review
October 2022
Consideratons

Periodic Review
October 2012 – No Action

0

05/1983

 

8.32

Criteria for Establishing a Tritium Bioassay Program

0

07/1988

Reviewed in 2017 – Issues identified for future consideration

8.33

Quality Management Program
(Withdrawn -- See 77 FR 33253, 06/05/2012)

W

06/2012

 

0

10/1991

 

8.34

Monitoring Criteria and Methods To Calculate Occupational Radiation Doses

1

08/2022

 

0

07/1992

Reviewed in 2017 – Revise

8.35

Planned Special Exposures

1

08/2010

Reviewed in 2015 – No issues identified

0

06/1992

 

8.36

Radiation Dose to the Embryo/Fetus

0

07/1992

Reviewed in 2017 – Revise

8.37

ALARA Levels for Effluents from Materials Facilities

0

07/1993

Reviewed in 2018 – No issues identified

8.38

Control of Access to High and Very High Radiation Areas of Nuclear Plants

1

05/2006

Reviewed in 2016 – No issues identified

0

06/1993

 

8.39

Release of Patients Administered Radioactive Materials

DG

04/2023

DG-8061 - Proposed Revision 2

1

04/2020

 

0

04/1997

Periodic Review May 2017 – Revise
 
Periodic Review November 2011 – No Action

8.40

Methods for Measuring Effective Dose Equivalent from External Exposure

0

07/2010

Periodic Review in 2025 – Reviewed with no issues identified

Periodic Review in 2015 – Reviewed with issues identified for future consideration

Page Last Reviewed/Updated Wednesday, February 18, 2026

Page Last Reviewed/Updated Wednesday, February 18, 2026