Home > NRC Library > ADAMS Public Documents
Clinton Power Station, Revision 21 to Updated Safety Analysis Report
Accession Number: ML20105A242
Date Released: Wednesday, August 5, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20105A243 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report. (21 page(s), 3/31/2020)
- ML20105A244 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Cover Sheet and List of Effective Pages. (50 page(s), 3/31/2020)
- ML20105A245 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (181 page(s), 3/31/2020)
- ML20105A246 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 2, Site Characteristics. (547 page(s), 3/31/2020)
- ML20105A247 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 2, Figure 2.1-2, Part 1 of 2. (119 page(s), 3/31/2020)
- ML20105A248 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 2, Figure 2.5-1, Part 2 of 2. (671 page(s), 3/31/2020)
- ML20105A249 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems. (843 page(s), 3/31/2020)
- ML20105A250 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5. (59 page(s), 3/31/2020)
- ML20105A251 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5. (13 page(s), 3/31/2020)
- ML20105A252 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 (27 page(s), 3/31/2020)
- ML20105A253 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 (20 page(s), 3/31/2020)
- ML20105A255 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 4, Reactor. (131 page(s), 3/31/2020)
- ML20105A256 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (227 page(s), 3/31/2020)
- ML20105A258 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Control Systems. (803 page(s), 3/31/2020)
- ML20105A259 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 8, Electric Power. (146 page(s), 3/31/2020)
- ML20105A260 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems. (440 page(s), 3/31/2020)
- ML20105A261 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (54 page(s), 3/31/2020)
- ML20105A262 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management. (158 page(s), 3/31/2020)
- ML20105A263 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 12, Radiation Protection. (141 page(s), 3/31/2020)
- ML20105A264 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations. (34 page(s), 3/31/2020)
- ML20105A265 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 14, Initial Test Program. (160 page(s), 3/31/2020)
- ML20105A267 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 16, Technical Specifications (1 page(s), 3/31/2020)
- ML20105A268 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Chapter 17, Quality Assurance (2 page(s), 3/31/2020)
- ML20105A269 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Appendix A, Glossary (14 page(s), 3/31/2020)
- ML20105A270 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures (38 page(s), 3/31/2020)
- ML20105A271 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Appendix C, Computer Programs (225 page(s), 3/31/2020)
- ML20105A273 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report (218 page(s), 3/31/2020)
- ML20105A275 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, Appendix E, FIgures Part 2 of 2 (22 page(s), 3/31/2020)
- ML20105A277 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, CPS Operational Requirements (167 page(s), 3/31/2020)
- ML20105A278 - Clinton Power Station, Revision 21 to Updated Safety Analysis Report, CPS TSB (846 page(s), 3/31/2020)