- ML110940254 - FOIA/PA-2011-0115 - Resp 2 - Final. (110 page(s), 3/29/2011)
- ML090820433 - IR 05000423-08-010; on 12/15/2008 - 02/06/2009; Dominion Nuclear Connecticut, Inc. (Dominion); Millstone Power Station, Unit 3 (MP3); Special Inspection Team Report. (27 page(s), 3/23/2009)
- ML090890376 - IR 05000336-09-402, 05000423-09-402; on 02/23/2009 - 02/27/2009; Millstone Power Station; Access Control. (5 page(s), 3/30/2009)
- ML090900030 - IR 05000336-09-006, 05000423-09-006; on 01/12/2009 - 03/06/2009; Millstone Power Station; Component Design Bases Inspection. (49 page(s), 3/31/2009)
- ML090920687 - Millstone, Email dated 3/25/09, RE: Millstone Dry Cask Inspection. (1 page(s), 3/25/2009)
- ML090960641 - Kewaunee, Millstone, Units 1, 2 & 3 and ISFSI, North Anna, Units 1 & 2 and ISFSI, and Surry, Units 1 & 2 and ISFSI - Proof of Financial Protection, Guarantee of Payment of Deferred Premiums and Submission of Annual Financial Report. (337 page(s), 3/26/2009)
- ML090970295 - Millstone, Units 1, 2 & 3 and ISFSI - Submittal of Major Revision 006, Minor Revision 0 to Emergency Plan Procedure MP-26-EPI-FAP07, "Notifications and Communications". (40 page(s), 3/26/2009)
- ML090970397 - Kewaunee; Millstone, Units, 1, 2 & 3; North Anna , Units 1 & 2; Surry, Units 1 & 2 and Associated ISFSIs - Submittal of Dominion's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage... (5 page(s), 4/1/2009)
- ML090980064 - 04/23/2009-Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process. (25 page(s), 4/8/2009)
- ML090980084 - 04/23/2009 Notice of Public Meeting with Dominion Nuclear Connecticut, Inc. Regarding the Safety Performance of the Millstone Power Station for Calendar Year 2008. (5 page(s), 4/8/2009)
- ML091030639 - Kewaunee Power Station, Millstone Power Station, Units 2 and 3, North Anna Power Station, Unit Nos. 1 and 2, and Surry Power Station, Unit Nos. 1 and 2 - Appendix C to Dominion Fleet Report DOM-NAF-2, "Qualification of the Westinghouse WRB-2M CHF. (9 page(s), 4/22/2009)
- ML091050623 - 04/23/2009 NRC & NEAC Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides. (25 page(s), 4/23/2009)
- ML091050660 - 04/23/09 Notice of Public Meeting with Nuclear Energy Advisory Council, to Discuss NRC's Assessment of Safety Performance of Millstone for CY 2008. (5 page(s), 4/15/2009)
- ML091070390 - Press Release-I-09-022: NRC to Discuss Annual Assessment for Millstone Nuclear Plant at Two Public Meetings Set for April 23 in Waterford, Conn. (2 page(s), 4/17/2009)
- ML091170139 - Enclosure 2 - Application for Withholding AW-09-01 with Proprietary Information Notice and One Copy of Affidavit. (9 page(s), 3/23/2009)
- ML091170150 - Enclosure 1- Part 1 of 2 - Report FAI/09-22, "Test Results for the Millstone-3 Gas-Water Transport Tests". (76 page(s), 3/31/2009)
- ML091200167 - Kewaunee; Millstone, Units 1, 2 & 3; North Anna, Units 1 & 2 and Surry Power, Units 1 & 2 - Submittal of Dominion's Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation (ISFSI)... (5 page(s), 4/27/2009)
- ML091260159 - Senior Reactor and Reactor Operator Initial Examinations - (Millstone Power Station, Unit 3). (5 page(s), 5/6/2009)
- ML091280232 - Summary of April 23, 2009, Annual Assessment Meeting with Dominion Nuclear Connecticut, Inc. and the Connecticut Nuclear Energy Advisory Council (NEAC). (3 page(s), 5/7/2009)
- ML091310666 - Millstone, Unit 3 - Third 10-year Interval Inservice Inspection Program and Associated Proposed Alternatives and Relief Requests. (314 page(s), 4/28/2009)
- ML091320460 - Millstone, Units 1, 2 and 3 - 2008 Occupational Radiation Exposure Information. (8 page(s), 4/28/2009)
- ML091320561 - Millstone, Unit 3, 2008 Annual Environmental Protection Plan Operating Report. (13 page(s), 4/27/2009)
- ML091330240 - Millstone Power Station, Units 1, 2 & 3 - 2008 Radioactive Effluent Release Report. (269 page(s), 4/30/2009)
- ML091340064 - IR 05000336-09-002, 05000423-09-002; on 01/01/09 - 03/31/09, Millstone Power Station Integrated Inspection Report and Exercise of Enforcement Discretion. (38 page(s), 5/14/2009)
- ML091340263 - Millstone, Units 1, 2 & 3 and ISFSI - Major Revision 005, Minor Revision 0 to Emergency Plan Procedure, MP-26-EPI-FAP02, "Technical Support Center Activation and Operation". (17 page(s), 4/23/2009)
- ML091350217 - Millstone, Units 1, 2, & 3, 2008 Annual Radiological Environmental Operating Report. (139 page(s), 4/30/2009)
- ML091380503 - Nancy Burton v. USNRC 09-1901-ag - Agency Appeal Pre-Argument Statement (Form C-A). (6 page(s), 5/11/2009)
- ML091380505 - Burton v. USNRC; No. 09-1901-ag - Petition to Review an Order. (10 page(s), 5/6/2009)
- ML091540017 - Millstone, Units 1, 2 & 3 and ISFSI - Major Revision 007, Minor Revision 0, to Emergency Plan Procedure, MP-26-EPI-FAP07, "Notifications and Communications". (41 page(s), 5/27/2009)
- ML091540204 - Comment (1) of Raymond A. West on Behalf of Dominion Resources Services, Inc., on Draft Regulatory Guide DG-1192 - Request for Inclusion of ASME Code Case N-513-3 - (Proposed Revision 16 of Regulatory Guide 1.147, dated October 2007). (3 page(s), 5/29/2009)
- ML091590236 - Millstone, Units 1,2,3 & ISFSI, North Anna, Units 1, 2, & ISFSI, Surry, Units 1, 2, & ISFSI, Kewaunee & ISFSI, Correspondence Distribution Request Change Update. (5 page(s), 6/4/2009)
- ML091600055 - Requalification Program Inspection Millstone Power Station, Unit 3. (5 page(s), 6/5/2009)
- ML091801066 - Kewaunee and ISFSI, Millstone, Units 1, 2, 3 and ISFSI, North Anna, Units 1, 2 and ISFSl, Surry, Units 1 and 2 and ISFSl, SGI and OUO Correspondence Distribution Request Update. (7 page(s), 6/25/2009)
- ML091870823 - Fauske and Associates LLC Letter from Robert E. Henry, 05/22/2009 Re: Response to NRC Request for FAI Proprietary Report (09-44) and Non-Proprietary Version (09-44R) dated 03/20/2009. (9 page(s), 5/22/2009)
- ML091910459 - Enclosure 3 - Fauske and Associates LLC Letter from Robert E. Henry, May 22, 2009 Application for Withholding AW-09-01 with Proprietary Information Notice and One Copy of Affidavit. (9 page(s), 5/22/2009)
- ML092050743 - IR 05000336-09-003 & 05000423-09-003 on 04/01/2009 - 06/30/2009; Millstone Power Station - NRC Integrated Inspection Report. (37 page(s), 7/24/2009)
- ML092180973 - E-mail Regarding Placement of Document in ADAMS for Millstone, Unit 3, Issuance of Amendment No. 59. (29 page(s), 8/3/2009)
- ML092190894 - Surry and North Anna, Units 1 & 2, Millstone, Units 2 and 3 and Kewaunee - Approved Topical Report DOM-NAF-2, Revision 0.1-A. (209 page(s), 8/4/2009)
- ML092250379 - RPM 2.3.4, Revision 002-03, "Inspection and Maintenance Process for Respiratory Protection Equipment". (15 page(s), 8/5/2009)
- ML092370296 - Millstone, Unit 3, Alternative Request IR-3-13 for the Use of Alternative Dissimilar Metal Weld Examination Depth-Sizing Requirements from ASME Code, Section XI. (10 page(s), 8/19/2009)
- ML092390141 - Millstone, Unit 3, Relief Request for Millstone Power Station, Unit 3, Relief Request IR-3-04, Response to Request for Additional Information for Alternative Brazed Joint Assessment Methodology. (128 page(s), 8/24/2009)
- ML092430338 - Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2, Removal of Mixed Vane Grid spacing restriction in appendix B to Fleet Report Dom-NAF-2-Evaluation of 4X4 DNB Test of 15X15 Vantage + with IFMS Using Vipre-D/WRB-1. (11 page(s), 8/28/2009)
- ML092440191 - Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station. (4 page(s), 9/1/2009)
- ML092520069 - Operator Licensing Examination Approval (Millstone Power Station, Unit 3). (4 page(s), 9/4/2009)
- ML092570153 - Acceptance Review Regarding MPS3 RR IR-3-13. (1 page(s), 9/11/2009)
- ML092580382 - Millstone, Unit 3, 30-Day Special Report for Area Temperature Monitoring - Containment Area CS-03 (Pressurizer Cubicle). (5 page(s), 9/4/2009)
- ML092580659 - Millstone Power Station, Units 2 & 3 - Changes to Technical Specification Bases. (385 page(s), 9/9/2009)
- ML092750625 - G20090534/LTR-09-0459/EDATS: SECY-2009-0422- Senator Joseph T. Lieberman Letter RE: Release of Radionuclides by Millstone Power Station. (3 page(s), 10/22/2009)
- ML092780588 - Transnuclear, Inc Part 21 Report re Fasteners on Spent Fuel Storage Devices Not Meeting Standards. (4 page(s), 10/1/2009)
- ML092880401 - September 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Millstone Power Station, Units 2 and 3 (Cover Letter Publicly Available, Enclosures Withheld from Public). (2 page(s), 10/14/2009)
- ML092890142 - NRC Operator Licensing Initial Exam Results, Millstone Nuclear Power Station, Unit No. 3 (Cover letter publicly available, enclosures withheld from public). (4 page(s), 10/9/2009)
- ML092930982 - 2009/10/19-Comment (26) of Mary Lampert, et. al., on Behalf of Pilgrim Watch , on Rules PR-50 and 50, "Enhancements to Emergency Preparedness Regulations." (37 page(s), 10/19/2009)
- ML092960418 - Millstone, Unit 3, Final Operating Exam (Folder 3). (471 page(s), 8/8/2009)
- ML092960560 - Millstone Power Station, Unit Nos. 2 and 3 - Request for Additional Information Regarding Generic letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Tac Nos. MD7845 and MD7846). (6 page(s), 11/6/2009)
- ML093020691 - Request for Supplemental Information for Acceptance Review of Dominion Topical Report re. Mixing Vane Grid Spacing Restriction. (2 page(s), 10/29/2009)
- ML093030285 - 2009/10/28-Comment (55) of C.L. Funderburk on Behalf of Dominion Resources Services, Inc., on Proposed Rule PR 31, regarding Limiting the Quantitiy of Byproduct Material in a Generally Licensed Device. (4 page(s), 10/28/2009)
- ML093060099 - ER 05000423-09-302; September 14-22, 2009; Millstone Power Station, Unit 3; Initial Operator Licensing Examination Report. (10 page(s), 11/2/2009)
- ML093060395 - Transnuclear, Inc. - Submittal of thirty Day Written Report of a Potential Deviation and Failure to Comply Associated with Unsubstantiated Certified Materials Test Reports for Certain Small Parts Utilized in Products Fabricated. (24 page(s), 10/30/2009)
- ML093080517 - Letter, Proposed Implementation Schedule Required by the Title 10 of the Code of Federal Regulation 73.54 for Cyber Security Plans. (3 page(s), 12/14/2009)
- ML093090606 - IR 05000336-09-004, 05000423-09-004; on July 1, 2009 - September 30, 2009; Millstone Power Station Unit 2 and Unit 3; Refueling and Other Outage Activities and Follow-up of Events. (42 page(s), 11/5/2009)
- ML093170166 - Part 1 of 4--Weld Overlay Examination Report 2R19. (80 page(s), 11/12/2009)
- ML093221042 - Millstone Power Station, Unit No. 3 - Issuance of Relief Request IR-3-04 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME1256). (9 page(s), 11/30/2009)
- ML093230003 - Millstone, Unit 3, Request for Additional Information Regarding Third 10-Year Interval Inservice Inspection Program Relief Request IR-3-10. (4 page(s), 12/9/2009)
- ML093240393 - Millstone Power Station, Unit No. 3 - Issuance of Relief Request IR-3-08 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix VIII (TAC ME1260). (7 page(s), 12/24/2009)
- ML093290312 - Millstone, Units 1, 2 & 3 and ISFSI (LBDCRS 09-MP1-001, 09-MP2-020, and 09-MP3-008) - Application for Proposed Change to Emergency Plan. (31 page(s), 11/24/2009)
- ML093310330 - Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry Units 1 & 2, Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2- Supplemental Information. (20 page(s), 11/20/2009)
- ML093550301 - PNO-I-09-007: Millstone Unit 3 Reactor Trip and Shutdown Greater than 72 Hours. (2 page(s), 12/21/2009)
- ML093580156 - Millstone Power Station, Unit No. 3 - Issuance of Relief Requests IR-3-06 and IR-3-07 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC Nos. ME1258 and ME1259). (9 page(s), 2/4/2010)
- ML093620085 - Millstone Power Station Unit 3, License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, "Steam Generator (SG) Program," and TS 6.9.1.7, "Steam Generator Tube Inspection Report" for One-Time Alternate Repair Criteria (H*). (56 page(s), 11/23/2009)
- ML093620086 - WCAP-17071-NP, Rev 0, "H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)". (439 page(s), 4/30/2009)
- ML100070068 - Millstone Power Station, Units 2 and 3 - Request for Additional Information Regarding Generic Letter 2004-02 (TAC Nos. MC4694 and MC4695). (10 page(s), 2/4/2010)
- ML100070073 - USNRC 10CFR Part 21 Notification - Flowserve Figure 848 Disk/Disk Nut Separation. (8 page(s), 11/19/2009)
- ML100070413 - Kewaunee, Millstone, 1, 2 & 3 and ISFSI, North Anna, Units 1 & 2 and ISFSI, Surry, 1 & 2 and ISFI - Nuclear Liability Insurance Endorsement. (35 page(s), 1/6/2010)
- ML100110025 - December 9, 2009 NRC Generic Fundamentals Examination (GFE) Results for Millstone Power Station, Unit 3 (Cover letter publicly available, enclosures withheld from public). (2 page(s), 1/8/2010)
- ML100120018 - 2010 Annual Letter - Generic Fundamentals Examination (GFE) Section, Dated 01/08/10. (6 page(s), 1/8/2010)
- ML100120318 - MPS3 Acceptance Review License Amendment Request Regarding Steam Generator One-Time Alternate Repair Criteria. (2 page(s), 1/12/2010)
- ML100190064 - Millstone, Units 2 & 3, Response to Request for Additional Information Regarding Generic Letter 2008-01, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. (10 page(s), 1/14/2010)
- ML100190513 - Millstone, Unit 3 - Relief Request IR-03-05 Response to Request for Additional Information Regarding Proposed Alternative Related to Inservice Inspection of Weld Overlays For The Third 10-Year Interval. (16 page(s), 1/14/2010)
- ML100330149 - Millstone, Unit 3, Response to Request for Additional Information Regarding Relief Request IR-3-13 Proposed Alternative For Dissimilar Metal Weld Examination Depth-Sizing Requirements (TAC No. ME2125). (11 page(s), 2/1/2010)
- ML100330422 - Millstone Power Station, Unit Nos. 1, 2, and 3 - Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME3106 and ME3107). (7 page(s), 3/19/2010)
- ML100330524 - Millstone, Units 1, 2 and 3, Environmental Assessment and Finding of No Significant Impact. (5 page(s), 3/19/2010)
- ML100350392 - State of Connecticut, Office of Attorney General, Letter Regarding Reduction of Staff at Millstone Nuclear Power Station to be Maintained Full Staff for Emergency Response and Control Room. (3 page(s), 1/21/2010)
- ML100361055 - Dominion Nuclear Connecticut, Inc, Relief Request Ir-3-10 Response to Request for Additional Information Regarding Alternative Examination Criteria for the Visual Examinations of Reactor Coolant System Hot Leg and Cold Leg Nozzle-to-safe End Welds..... (58 page(s), 2/3/2010)
- ML100541851 - LER 09-002-00 for Millstone, Unit 3, Regarding Automatic Reactor Trip. (6 page(s), 2/15/2010)
- ML100570055 - Y020100028/EDATS: NRR-2010-0028 - Richard Blumenthal, Connecticut Attorney General's Letter In Response Ltr Dated 1/21/2010 Regarding Reduction in Staff at Millstone Nuclear Power Station. (2 page(s), 3/10/2010)
- ML100610104 - Millstone Power Station Unit 3 - Response to Request for Additional Information Questions 26, 27 & 29 re Spent Fuel Pool Criticality License Amendment Request. (15 page(s), 3/1/2010)
- ML100610348 - Millstone, Units 2 & 3, Submittal of Technical Specifications 2009 Annual Report. (2 page(s), 2/18/2010)
- ML100630798 - Kewaunee & ISFSI, Millstone, Units 1, 2, 3 & ISFSI, North Anna, Units 1, 2, & ISFSIs, Surry, Units 1, 2, & ISFSIs - Correspondence Distribution Change Update. (4 page(s), 3/4/2010)
- ML100640343 - Millstone, Unit 3, Response to Questions 28 and 30 of Request for Additional Information Regarding a Spent Fuel Pool Criticality License Amendment Request. (28 page(s), 3/5/2010)
- ML100640430 - Millstone Power Station, Unit Nos. 1, 2, and 3-Exemption From The Requirements of 10 CFR Part 73, Section 73.55 (TAC Nos. J00287, ME3106 and ME3107) (8 page(s), 3/26/2010)
- ML100640440 - Millstone Power Station, Unit Nos 1, 2 and 3 Exemption. (6 page(s), 3/26/2010)
- ML100640446 - Millstone Power Station Unit 3-Issuance Relief. (10 page(s), 3/12/2010)
- ML100640456 - Millstone, Unit 3, 10CFR50.55a Relief Request IR-3-14, Update to the Risk-Informed Inservice Inspection Program for the Third 10-Year Inspection Interval. (27 page(s), 3/5/2010)
- ML100670343 - Acceptance Review: Part 73 Exemption Request. (1 page(s), 3/8/2010)
- ML100680118 - Millstone Power Station, Unit 3 - Issuance Of Relief Request IR-3-01 Regarding Use Of American Society Of Mechanical Engineering Code, Section XI, Appendix VIII (TAC No. ME1254). (14 page(s), 4/6/2010)
- ML100750024 - Millstone Power Station, Unit No. 3 - Issuance of Amendment Re: Spent Fuel Pool Criticality (TAC MD8251). (28 page(s), 3/26/2010)
- ML100770358 - Millstone Power Station, Unit No. 3 - Issuance of Amendment Re: Changes to the Steam Generator Inspection Scope and Repair Requirements (TAC ME2978). (33 page(s), 5/3/2010)
- ML100820062 - Millstone, Unit 3, Issuance of Relief Request IR-3-10 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix VIII. (10 page(s), 4/16/2010)
- ML100840738 - Millstone Power Station, Unit No. 3 - Issuance of Relief Requests IR-3-13 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME2125). (8 page(s), 4/15/2010)
- ML100920093 - 10 CFR21 Notification of a Potential Weld Defect. (2 page(s), 3/25/2010)
- ML100970598 - Millstone Power Station, Unit Nos. 1, 2, 3 and Independent Spent Fuel Storage Installation - Proposed Change to the Millstone Power Station Emergency Plan (TAC Nos. JO0287, ME1396 and ME1397). (4 page(s), 4/27/2010)
- ML100980415 - Draft Millstone GL2004-02 Supplemental Responses to Support Public Teleconference on 4/08. (53 page(s), 4/8/2010)
- ML101040042 - Millstone Power Station, Unit No. 3 - Issuance of Relief Request lR-3-11 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC No. ME1263). (8 page(s), 4/29/2010)
- ML101090095 - Press Release-I-10-021: NRC to Hold Open House, Public Meeting on April 22 in Waterford, Conn. to Discuss Annual Assessment of Millstone Nuclear Power Plant. (2 page(s), 4/19/2010)
- ML101100608 - Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, Removal of Mixing Vane Grid Spacing Restriction in Appendix B to Fleet Report DOM-NAF-2-A, Response to Request for Additional Information. (12 page(s), 4/16/2010)
- ML101130187 - Millstone, Unit 3, ASME Section XI Inservice Inspection Program Relief Request for Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval. (175 page(s), 4/19/2010)
- ML101170575 - 04/08/2010-Summary of Teleconference with DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information (TAC Nos. MC4694 and MC4695). (5 page(s), 5/5/2010)
- ML101180386 - Approval of the Center for Nuclear Waste Regulatory Analyses' Fiscal Year 2010 Management Plan - Major Milestone 14002.01.011.030. (2 page(s), 4/28/2010)
- ML101190417 - Westinghouse Electric Co., LLC, LTR-SGMP-10-50 NP-Attachment "Assessment of the Effect of the Location of the Bottom of the Expansion Transition on H." (19 page(s), 4/22/2010)
- ML101300353 - Millstone Power Station, Units 1, 2 & 3 - Submittal of 2009 Radioactive Effluent Release Report. (252 page(s), 4/27/2010)
- ML101310232 - Millstone Power Station, Unit 3 - 2009 Annual Environmental Protection Plan Operating Report. (13 page(s), 4/27/2010)
- ML101310608 - Millstone Power Station, Units 1, 2 and 3 - 2009 Annual Radiological Environmental Operating Report. (137 page(s), 4/28/2010)
- ML101330268 - Millstone, Unit 3 - Core Operating Limits Report, Cycle 14. (28 page(s), 5/6/2010)
- ML101380042 - Millstone Power Station, Unit 3 - Alternative Request IR-3-12 for the Use of ASME Code Cade N-513-2. (7 page(s), 5/28/2009)
- ML101390172 - G20100272/EDATS: OEDO-2010-0343 - David Collins Ltr. re 2.206 - Prevent Restart of Millstone Power Station, Unit 3 (174 page(s), 6/4/2010)
- ML101440348 - 05/24/10 Acknowledgement Ltr to A. McNiece re Safety at the Millstone Nuclear Power Station. (1 page(s), 5/24/2010)
- ML101450184 - Fwd: Teleconference Meeting Thursday 20th 1:00PM Broken Barriers and Accidents Lobbyists and Government Regulations. (3 page(s), 5/20/2010)
- ML101450266 - G20100272/EDATS: OEDO-2010-0343 - Response to 2.206 - Prevent Restart of Millstone Power Station, Unit 3 (3 page(s), 6/4/2010)
- ML101470099 - Millstone, Unit 3 - Issuance of Relief Request IR-3-05 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix VIII. (12 page(s), 6/11/2010)
- ML101471000 - Acceptance Review Regarding MPS3 RR IR-3-14. (1 page(s), 5/27/2010)
- ML101530556 - MPS GL-04-002 Draft RAI Responses/Public Telecon Handouts. (54 page(s), 6/2/2010)
- ML101620034 - Approval to Remove Mixing Vane Grid Restriction in Appendix B of Dominion Fleet Topical Report DOM-NAF-2-A. (6 page(s), 6/21/2010)
- ML101650173 - Acceptance Review Regarding MPS3 RR IR-3-12. (1 page(s), 6/14/2010)
- ML102010384 - LER 08-005-01 for Millstone, Unit 3 Regarding Containment Penetration Not Fully-Closed During Fuel Movement. (6 page(s), 7/7/2010)
- ML102230444 - Kewaunee & ISFSI, Millstone, Units 1, 2, & 3 & ISFSI, North Anna, Units 1, 2 & ISFSIs and Surry, Units 1, 2 & ISFSIs - SGI and OUO Correspondence Distribution Request. (7 page(s), 7/29/2010)
- ML102240063 - Millstone, Unit 3 - License Amendment Request to Relocate Technical Specification 3/4.7.14, Area Temperature Monitoring. (17 page(s), 7/21/2010)
- ML102240069 - Millstone, Unit 3 - Correction to Previously Submitted Correspondence for Cycle 14 Core Operating Limits Report. (28 page(s), 7/29/2010)
- ML102240501 - ME4319-ME4325, Dominion Cyber Security Plan Amendment - Acceptable for Detailed Technical Review. (2 page(s), 8/9/2010)
- ML102310506 - LER 10-003-00 for Millstone Power Station, Unit 3, Secondary Containment Rendered Inoperable Due to Misaligned Dampers. (6 page(s), 7/26/2010)
- ML102390403 - Millstone Units 2 & 3, Changes to Technical Specification Bases. (377 page(s), 8/19/2010)
- ML102390419 - DOM-NAF-2, Rev. 0.2-A, "Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code." (255 page(s), 8/31/2010)
- ML102450072 - Kewaunee, Millstone, Units 1, 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, Associated ISFSIs, Submittal of Security Plan, Training & Qualification Plan, Safeguards Contingency Plan & ISFS Security Program, Revision 9. (5 page(s), 8/31/2010)
- ML102640210 - Millstone, Unit 3 - Response to Request for Additional Information Regarding Generic Letter 2004-02. (24 page(s), 9/16/2010)
- ML102700607 - Millstone, Unit 3, NRC Notification of Reviewed National Pollutant Discharge Elimination System Permit. (93 page(s), 9/23/2010)
- ML102790475 - Acceptance Review: MPS3 LAR Regarding Area Temperature Monitoring. (1 page(s), 10/6/2010)
- ML102850438 - Attachments 2, 3, 5, 7, 8 & 9, to 10-579A, Westinghouse Electric Co. LLC, WCAP-17071-NP, "H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F)," Revision 2, Dated September 2010. (480 page(s), 9/30/2010)
- ML102861810 - Kewaunee, Millstone, Units 1, 2 & 3, North Anna, Units 1 & 2 and Surry , Units 1 & 2 - Associated ISFSIs, Submittal of Security, Training and Qualification Plan, Safeguards Contingency Plan & ISFSI Security Program, Rev. 10. (5 page(s), 10/4/2010)
- ML102930350 - Preliminary Discussion with Millstone. (2 page(s), 10/20/2010)
- ML102940492 - Millstone Power Station, Unit No. 3 - Request for Additional Information Regarding the Update to the Risk Informed Inspection Program for the Third 10-Year Inspection Interval (TAC ME3528). (6 page(s), 11/29/2010)
- ML102950281 - Part 21 Notification - Crack Indications in Marathon Control Rod Blades. (8 page(s), 10/20/2010)
- ML103010558 - Millstone Power Station, Units 2 & 3 - Target Set Inspection 05000336-10-201 & 05000423-10-201. (4 page(s), 10/29/2010)
- ML103070124 - LER 10-004-00, for Millstone Power Station, regarding Inoperable Turbine Driven Auxiliary Feedwater Pump Due to Degraded Relief Valve. (6 page(s), 10/19/2010)
- ML103340357 - IR 05000336-10-502, 05000423-10-502, on 10/18/2010-10/22/2010, Millstone Power Station, Units 2 and 3, Emergency Preparedness Exercise Report. (10 page(s), 11/30/2010)
- ML103340497 - LER 10-002-00 for Millstone, Unit 3, Regarding Automatic Reactor Trip on Lo Lo Steam Generator Level. (6 page(s), 7/15/2010)
- ML103400155 - Anomaly Discovered on Rosemount Model 1152 Differential Pressure Transmitters with Output Code "L" 10-50 mA Electronics. (34 page(s), 12/2/2010)
- ML103550487 - Millstone, Unit 3, Relief Request IR-3-14 Response to Request for Additional Information Regarding Update to the Risk-Informed Inservice Inspection Program for the Third 10-Year Inspection Interval. (11 page(s), 12/16/2010)
- ML103560111 - IR 05000336-10-010, 05000423-10-010, on Millstone Power Station, Units 2 and 3, Engineering Specialist Plant Modifications Inspection. (23 page(s), 12/22/2010)
- ML110070530 - Millstone Power Station Response to NRC Inspection Reports 05000336-10-008 and 05000423-10-011, dated January 6, 2011. (2 page(s), 1/6/2011)
- ML110070642 - Millstone: NRC Office of Investigations Case No. 1-2009-052. (3 page(s), 1/6/2011)
- ML110140343 - Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates. (4 page(s), 1/14/2011)
- ML110250259 - Millstone, Unit 3 - Request for Additional Information Regarding Relief Requests For Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval. (26 page(s), 1/20/2011)
- ML110280208 - Millstone, Unit 3, License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, "Steam Generator (SG) Program," and TS 6.9.1.7, "Steam Generator Tube Inspection Report" for Temporary Alternate Repair Criteria (H*). (31 page(s), 1/20/2011)
- ML110280213 - WCAP-17330-NP, Revision 0, "H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5)." (132 page(s), 11/30/2010)
- ML110330330 - Final Significance Determination for a Security-Related Green Finding [NRC Inspection Report Nos. 05000336/2011403; 05000423/2011403] - Millstone Nuclear Power Station. (4 page(s), 2/1/2011)
- ML110380130 - IR 05000336/201005, 05000423/2010005; 10/1/2010-12/31/2010; Millstone Power Station Unit 2 and Unit 3; Event Follow-up, Other Activities (43 page(s), 2/7/2010)
- ML110450583 - Millstone, Units 1, 2 & 3, North Anna & Surry, Units 1 & 2 - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue. (42 page(s), 2/10/2011)
- ML110550478 - Millstone, Units 1, 2, and 3, North Anna, Units 1 and 2, and Surry, Units 1 and 2 - Acceptance Review of Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue, 10 CFR 26. (1 page(s), 2/24/2011)
- ML110610365 - Acceptance Review: MPS3 SG Temporary ARC. (1 page(s), 3/2/2011)
- ML110620174 - Annual Assessment Letter for Millstone Power Station Unit 2 and Unit 3 (Report 05000336/2010001 and 05000423/2010001). (5 page(s), 3/4/2011)
- ML110630401 - Millstone Power Station-NRC Emergency Preparedness Annual Inspection Report Nos. 05000336-10-501 and 50500423-10-501; NRC Security Annual Inspection Report Nos. 05000336-10-401 and 05000423-10-401. (4 page(s), 3/3/2011)
- ML091120006 - NRC Operator Licensing Initial Exam Results, Millstone Power Station, Unit 2 (Cover Letter Publicly Available; Enclosures Non-Public). (3 page(s), 4/17/2009)
- ML091120062 - Millstone Power Station, Unit 2, Post Exam Comment Miscellaneous References (Folder 1). (31 page(s), 3/31/2009)
- ML091120075 - Millstone Power Station, Unit 2, Post Exam Comment SRO Question #77 References (Folder 1). (185 page(s), 3/31/2009)
- ML091320343 - Millstone, Unit 2, and Independent Spent Fuel Storage Installation, Submittal of Cask Registration for Spent Fuel Storage. (3 page(s), 4/4/2009)
- ML091340133 - 05/26/2009 Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps From the Technical Specifications for Millstone Power Station, Unit No. 2. (4 page(s), 5/15/2009)
- ML091380106 - Millstone Power Station, Unit No. 2 - Weld Overlay Relief Request. (3 page(s), 7/21/2009)
- ML091390160 - ER 05000336/2009301, January 26 - February 24, 2009, Millstone Power Station, Unit 2, Initial Operator Licensing Examination Report. (17 page(s), 5/18/2009)
- ML091410449 - Millstone, Unit 2 - Correction to Date of Letter Serial No. 09-248 Independent Spent Fuel Storage Installation Submittal of Cask Registration for Spent Fuel Storage. (2 page(s), 5/11/2009)
- ML091550244 - Millstone, Unit 2, Relief Requests for Temporary Non-Code Repair of Emergency Diesel Generator Heat Exchangers. (8 page(s), 7/8/2009)
- ML091751014 - Acceptance Review for RR for Temporary Non-Code Repair. (2 page(s), 6/24/2009)
- ML091820272 - Kewaunee, Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry Power, Units 1 & 2, Submittal of 2008 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (31 page(s), 6/30/2009)
- ML091870321 - PNO-I-09-004: Millstone Unit 2 Reactor Trip and Shutdown Greater Than 72 hours. (2 page(s), 7/3/2009)
- ML092080506 - PNO-I-09-004A: Updated - Millstone Unit 2 Reactor Trip and Shutdown Greater than 72 Hours. (1 page(s), 7/27/2009)
- ML092090215 - Millstone, Unit 2, Request RR-89-61 Revision 2, Alternative Repair and Mitigation Requirements for Structural Weld Overlays. (12 page(s), 7/23/2009)
- ML092090216 - WCAP-16896-NP, Rev 2, "Millstone Unit 2 RCS Surge, Spray, Shutdown Cooling, Safety Injection, Charging Inlet, and Letdown/Drain Nozzles Structural Weld Overlay Qualification." (164 page(s), 6/30/2009)
- ML092120094 - Request for Withholding Information From Public Disclosure for Millstone Power Station Unit 2 (TAC No. ME1765). (3 page(s), 8/4/2009)
- ML092390049 - LER 09-001-00, for Millstone Power Station re Reactor Trip Due to High Pressurizer Pressure. (6 page(s), 8/19/2009)
- ML092580015 - Senior Reactor Operator Upgrade Written Retake Examination - Millstone Power Station, Unit 2. (5 page(s), 9/15/2009)
- ML092590055 - Millstone Power Station, Unit 2, Special Report for Seismic Instrumentation. (3 page(s), 9/8/2009)
- ML092590073 - LER 09-002-00 for Millstone Power Station, Unit 2 re: Reactor Coolant System Pressure Boundary Leakage. (5 page(s), 9/8/2009)
- ML092710151 - Millstone, Unit 2, Alternative Request RR-89-67 for the P40A RCP Seal Cooler Return Tubing. (12 page(s), 9/22/2009)
- ML092740662 - Millstone, Unit 2 - Alternative Request RR-89-68 for Use of Code Case N-722-1 for Bare Metal Visual Examination of the RPV Flange Seal Leak-off Line Welds Made of Alloy 600/82/182 Materials. (12 page(s), 10/1/2009)
- ML092870739 - Millstone Power Station, Unit No. 2 - Relief Request RR-89-61, Revision 2, Regarding the Use of Weld Overlays as an Alternative Repair (TAC No. ME1765). (15 page(s), 10/15/2009)
- ML092890573 - Acceptance Letter re: MPS2 Alternative Request RR-89-68 (2 page(s), 10/16/2009)
- ML092890626 - Millstone, Unit 2, Supplement Information to Request RR-89-61 Revision 2, Alternative Repair and Mitigation Requirements for Structural Weld Overlays. (2 page(s), 10/9/2009)
- ML093140625 - Millstone Power Station, Unit No. 2 - Summary of Teleconference Re: Verbal Authorization for Relief Request RR-89-67 (TAC No. ME2296). (3 page(s), 11/17/2009)
- ML093210168 - Millstone Power Station, Unit 2 - Core Operating Limits Report, Cycle 20. (14 page(s), 11/6/2009)
- ML093560847 - LER 09-003-00, Millstone, Unit 2 re Two Independent Diesel Generators Rendered Inoperable Due to Common Cause. (6 page(s), 12/4/2009)
- ML093570237 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-89-67 Regarding the Repair of Reactor Coolant Pump Seal Cooler Return Tubing and Weld (TAC No. ME2296). (10 page(s), 4/26/2010)
- ML100250286 - LER 09-004-00 for Millstone, Unit 2, Regarding Overdue ASME Code Required Inservice Test Did Not Meet Acceptance Criteria. (6 page(s), 1/11/2010)
- ML100470870 - Millstone Station, Unit 2 Retake - NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (4 page(s), 11/20/2009)
- ML100470905 - Millstone Station, Unit 2, Draft - Outlines (Folder 2). (20 page(s), 11/20/2009)
- ML100470918 - Millstone Station, Unit 2 - Draft Written Exam. (105 page(s), 11/20/2009)
- ML100490358 - Millstone, Unit 2, Startup Test Report for Cycle 20. (16 page(s), 2/2/2010)
- ML100501163 - Millstone, Unit 2, Inservice Inspection Program - Owner's Activity Report for Refueling Outage 19. (7 page(s), 2/4/2010)
- ML100560359 - LER 09-005-00 for Millstone Power Station, Unit 2 re: Both Containment Air Lock Doors Open in Mode 1. (6 page(s), 1/29/2010)
- ML100610136 - Notification of Individual Examination Results for Applicants on Written Retake Upgrade Examination Conducted on 01/29/10. (3 page(s), 3/1/2010)
- ML100670463 - Millstone Station, Unit 2 - Final Written Examination with Answer Key (401-5 Format). (76 page(s), 1/15/2010)
- ML100670496 - Millstone Station, Unit 2 - Final Outlines (Folder 3). (12 page(s), 1/15/2010)
- ML100670507 - Millstone Station, Unit 2, Actual Handouts to Applications (Folder 3). (4 page(s), 1/15/2010)
- ML100900200 - Millstone, Unit 2, Relief Requests RR-04-02, Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel, and RR-04-03, Alternative Evaluation Criteria for Code Case N-513-2, Temporary Acceptance of Flaws in.... (10 page(s), 3/30/2010)
- ML101250043 - LER 10-001-00, for Millstone Power Station, Unit 2, regarding Reactor Trip. (5 page(s), 4/26/2010)
- ML101340166 - Acceptance Review: MPS2 Relief Request RR-04-03. (1 page(s), 5/14/2010)
- ML101340174 - Acceptance Review: MPS2 Relief Request RR-04-02. (1 page(s), 5/14/2010)
- ML102010293 - LER 09-003-01 for Millstone - Unit 2 Regarding Two Independent Diesel Generators Rendered Inoperable Due to Common Cause. (6 page(s), 7/7/2010)
- ML102010413 - Millstone Power Station, Unit 2 - Response to Request for Additional Information re Generic Letter 2004-02. (21 page(s), 7/8/2010)
- ML102220527 - Millstone, Unit 2 - Fourth 10-Year Interval Inservice Inspection Program. (124 page(s), 8/5/2010)
- ML102240064 - Millstone, Unit 2 - License Amendment Request to Revise Technical Specification 3/4.9.3.1, "Decay Time". (13 page(s), 7/21/2010)
- ML102310456 - Acceptance Review Regarding MPS2 10-Year ISI Relief Requests. (1 page(s), 8/19/2010)
- ML102310507 - LER 10-002-00, Millstone Power Station, Unit 2 re Manual Reactor Trip on High Steam Generator Water Level. (6 page(s), 7/20/2010)
- ML102730207 - Acceptance Review: MPS2 LAR Regarding Decay Time. (1 page(s), 9/30/2010)
- ML102780086 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-89-68 Regarding Use of American Society of Mechanical Engineering Code Case N-722-1 (TAC No. ME2309). (7 page(s), 10/27/2010)
- ML102940440 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-04-02 Regarding Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel (TAC No. ME3691). (8 page(s), 12/3/2010)
- ML103300048 - Millstone Power Station Unit 2, Independent Spent Fuel Storage Installation, Submittal of Cask Registration for Spent Fuel Storage. (3 page(s), 11/15/2010)
- ML103410252 - Millstone, Unit 2 - Reply to a Notice of Violation EA 10-175, Inspection Report 05000336-10-008. (8 page(s), 12/6/2010)
- ML103550446 - Millstone Power Station, Unit No. 2 - Issuance of Relief Request RR-04-06 Regarding Use of Performance Demonstration Initiative Qualified Procedures, Personnel and Equipment (TAC No. ME4474). (7 page(s), 1/18/2011)
- ML103640257 - Millstone Power Station, Unit 2 - Issuance of Relief Request RR-04-08 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition (TAC ME4476). (8 page(s), 1/18/2011)
- ML110390483 - LER 10-002-00 for Millstone, Unit 2 Regarding Reactor Trip on Low Condenser Vacuum. (6 page(s), 1/27/2011)
- ML100070559 - D. Heacock ltr. re: Millstone Unit 1 - 25 Day Response to NRC Order Imposing Increased Controls (EA-09-204) and Order Imposing Fingerprinting and Criminal History Records Check. (3 page(s), 1/20/2010)
- ML102090071 - Millstone, Unit 1 - Revised Power Reactor Security Rule. (4 page(s), 8/2/2010)
- ML103010073 - 11/01/10 Meeting Notice Milestone Power Station Revised 10 CFR 73.55. (4 page(s), 10/28/2010)
- ML103370571 - Notification of Potential Part 21 on GE-Hitachi Nuclear Energy Americas, LLC, Crack Indication in Marathon Control Rod Blades. (10 page(s), 12/1/2010)
- ML103420582 - 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1. (120 page(s), 6/23/2009)
- ML103430127 - Letter to Mr. David Heacock re: Millstone - Unit 1 - Request for Withholding Information from Public Disclosure, Submittal of Proprietary and Non-Proprietary Information on 2008 Decommissioning Cost Update. (4 page(s), 12/20/2010)
- ML110070175 - Request for Technical Assistance on Request for Exemption form Certain Requirements of 10 CFR 73.55 for Millstone Power Station, Unit 1. (3 page(s), 1/11/2011)
- ML110341619 - D. Heacock ltr. re: Change in NRC Staff Project Manager for Millstone Power Station Unit 1. (1 page(s), 2/8/2011)