Home > NRC Library > ADAMS Public Documents
01/09/2008-01/11/2008 Summary of Cat. 3 Public Meeting Between the Nuclear Regulatory Commission Staff, International Researchers and Industry Participants on Assessing Leak Before Break in Primary Water Stress Corrosion Cracking Susceptible Components.
Accession Number: ML080220461
Date Released: Monday, January 28, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML080180469 - 01/09/2008-01/11/2008 Summary of Cat. 3 Public Meeting Between the Nuclear Regulatory Commission Staff, International Researchers and Industry Participants on Assessing Leak Before Break in Primary Water Stress Corrosion Cracking Susceptible Components. (3 page(s), 1/24/2008)
- ML080220514 - 01/09/2008-01/11/2008 List of Attendees - LBB in PWSCC Systems, Hilton Hotel, Rockville MD. (2 page(s), 1/24/2008)
- ML080220396 - 01/09/2008-01/11/2008 Comparison of Leak Rates from Alloy 82/182 Butt Weld Cracks for Leak-Before-Break Assessment. (22 page(s), 1/10/2008)
- ML080220452 - 01/09/2008-01/11/2008 Current PWSCC in LBB System Research Program. (10 page(s), 1/9/2008)
- ML080220482 - 01/09/2008-01/11/2008- NRC Weld Residual Stress Model Validation Program. (13 page(s), 1/10/2008)
- ML080220583 - 01/09/2008-01/11/2008 AEGIS Weld Inlay Isolation of PWSCC Susceptiable Material. (21 page(s), 1/10/2008)
- ML080230597 - 01/09/2008-01/11/2008- Statistical Initiation and Crack Growth Models for Stress Corrosion Cracking. (14 page(s), 1/10/2008)
- ML080240200 - 01/09/2008-01/11/2008 Probabilistic Fracture Mechanics Assessment for Leak-Before-Break. (8 page(s), 1/10/2008)
- ML080240366 - 01/09/2008-01/11/2008 Regulatory Aspects on the Application of the LBB Concept for Swedish Nuclear Power Plants. (38 page(s), 1/11/2008)
- ML080240350 - 01/09/2008-01/11/2008 SCC Crack Growth Rates for Nickel-Base Alloys in PWR Primary Water. (62 page(s), 1/9/2008)
- ML080240376 - 01/09/2008-01/11/2008 Dissimilar Metal Weld Residual Stress Issues Affecting PWSCC. (18 page(s), 1/11/2008)
- ML080240387 - 01/09/2008-01/11/2008 Future Improvements to Leak Rate Analyses. (12 page(s), 1/11/2008)
- ML080240402 - 01/09/2008-01/11/2008 Developmental Efforts for the PRO-LOCA (Piping PFM) Code. (20 page(s), 1/11/2008)
- ML080240240 - 01/09/2008-01/11/2008 Evaluation of Overlaid Welds for Critical Flaw Size and Leak Rate in LBB Assessment. (22 page(s), 1/11/2008)
- ML080240278 - 01/09/2008-01/11/2008 NRC/Industry LBB Assessment. (6 page(s), 1/11/2008)
- ML080240318 - 01/09/2008-01/11/2008 Accurate Critical Crack Size Calculations in DM Welds. (23 page(s), 1/11/2008)
- ML080240341 - 01/09/2008-01/11/2008 Arbitrary Surface Crack Growth due to PWSCC and its Inclusion on PFM Codes. (10 page(s), 1/11/2008)
- ML080240453 - 01/09/2008-01/11/2008 Advanced FEA Evaluation of Growth of Postulated Circumferential PWSCC Flaws in Pressurizer Nozzle Dissimilar Metal Welds (MRP-216). (47 page(s), 1/10/2008)
- ML080240471 - 01/09/2008-01/11/2008 EPRI Welding Residual Stress Measurement and Model Validation Project. (22 page(s), 1/10/2008)
- ML080240464 - 01/09/2008-01/11/2008 LBB Applications to CANDU Piping. (25 page(s), 1/11/2008)
- ML080240478 - 01/09/2008-01/11/2008 NDE Activities on Dissimilar Metal Welds at EPRI. (28 page(s), 1/9/2008)
- ML080240480 - 01/09/2008-01/11/2008 MSIP, A Proven Technique to Enhance Leak Before Break in Susceptible Reactor Vessel Nozzle Welds. (30 page(s), 1/9/2008)
- ML080240500 - 01/09/2008-01/11/2008 Preliminary LBB Process Flow Diagram. (7 page(s), 1/9/2008)
- ML080240522 - 01/09/2008-01/11/2008 Modeling Process and Uncertainty Treatment Used in the PTS Re-Evaluation Project. (48 page(s), 1/11/2008)
- ML080250135 - 01/09/2008-01/11/2008 Using NDE to Manage LBB in Dissimilar Metal Welds Susceptible to PWSCC. (21 page(s), 1/11/2008)
- ML080250141 - 01/09/2008-01/11/2008 An Industry-Developed Technical Basis for Demonstrating Leak Before Break in Susceptible Piping Materials. (31 page(s), 1/19/2008)
- ML080240496 - 01/09/2008-01/11/2008 Evaluation of the MSIP for PWSCC Mitigation. (25 page(s), 1/9/2008)
- ML080240438 - 01/09/2008-01/11/2008 Attributes of Weld Overlays for Lowering Pipe Rupture Probability. (28 page(s), 1/11/2008)
- ML080240506 - 01/09/2008-01/11/2008 Evaluating Pipe Rupture Probability In PWSCC Susceptible Weldments. (28 page(s), 1/11/2008)
- ML080240510 - 01/09/2008-01/11/2008 Characterization of the Number and Sizes of Flaws in Reactor Pressure Vessel Welds. (27 page(s), 1/11/2008)