Home > NRC Library > ADAMS Public Documents
Retransmittal of Hematite Decommissioning Plan and Supporting Documents.
Accession Number: ML062430570
Date Released: Friday, December 8, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML062430574 - Retransmittal of Hematite Decommissioning Plan and Supporting Documents. (1 page(s), 8/25/2006)
- ML062430576 - Submittal of Hematite Decommissioning Plan and Supporting Documents. (9 page(s), 6/19/2006)
- ML062430600 - DO-04-004, Rev. 3, "Hematite Decommissioning Plan," Chapter 1 - 16. (232 page(s), 4/30/2006)
- ML062430601 - DO-04-004, Rev. 3, "Hematite Decommissioning Plan," Appendix A, Boring Logs, Part 1 of 2. (50 page(s), 4/30/2006)
- ML062430602 - DO-04-004, Rev. 3, "Hematite Decommissioning Plan," Appendix A, Boring Logs, Part 2 of 2. (52 page(s), 4/30/2006)
- ML062430606 - DO-04-004, Rev. 3, "Hematite Decommissioning Plan," Appendix B, Slug Tests and Pump Tests. (289 page(s), 4/30/2006)
- ML062430608 - DO-04-010, Rev. 1, "Hematite Radiological Characterization Report." (775 page(s), 4/30/2006)
- ML062430609 - DO-04-012, Rev. 3, "Derivation of Site Specific Soil DCGLs for Westinghouse Electric Company Hematite Facility (Resident Gardener)." (509 page(s), 4/30/2006)
- ML062430612 - "Geophysical Survey at the Westinghouse Hematite Facility." (82 page(s), 2/28/2005)
- ML062430615 - "Determination of Distribution Coefficients for Radionuclides of Concern at the Westinghouse Hematite Facility, Rev. 0." (252 page(s), 8/25/2006)
- ML062430617 - "Gamma Survey Data Evaluation Report, Rev 1." (87 page(s), 5/31/2004)
- ML062430619 - DO-02-001, Rev. 0.2, "Hematite Former Fuel Cycle Facility Decommissioning - Historical Site Assessment." (68 page(s), 12/31/2005)
- ML062430622 - DO-05-005, Rev. 0, "Hematite Site Surrogate Evaluation." (82 page(s), 10/31/2005)
- ML062430625 - Westinghouse Former Fuel Cycle Facility D&D Project, "Site-Specific Soil Parameters," Chapter 1 - Appendix E. (284 page(s), 9/15/2003)
- ML062430631 - Westinghouse Former Fuel Cycle Facility D&D Project, Site-Specific Soil Parameters, Rev. 1," Appendix F - H. (86 page(s), 1/31/2003)