Home > NRC Library > ADAMS Public Documents
FOIA/PA-2005-0208 Resp 1 - Partial.
Accession Number: ML051450445
Date Released: Tuesday, May 31, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML051450446 - FOIA/PA-2005-0208 - Resp 1 - Partial. (10 page(s), 5/20/2005)
- ML043090220 - IR 05000336-04-007, 05000423-04-007; 07/01/2004 - 09/30/2004; Millstone Power Station, Unit 2 and Unit 3; Permanent Plant Modifications, Post-Maintenance Testing, Event Followup, Other Activities. (59 page(s), 10/29/2004)
- ML051080484 - PNO-I-05-17: Alert declared at Millstone 3 due to a Main Steam Safety Valve not reseating after an SI actuation on low main steam line pressure. (3 page(s), 4/18/2005)
- ML031320609 - IR 05000336-03-002 & IR 05000423-03-002, on 12/29/02 - 03/29/03, Dominion Nuclear Connecticut, Inc, Millstone Power Station, Unit 2; Other Activities & Millstone Power Station, Unit 3; Surveillance Testing. (56 page(s), 5/12/2003)
- ML023160326 - IR 05000336-02-005 & 05000423-02-005; Dominion Nuclear Connecticut, Inc.; 06/30-09/28/02; Millstone; Units 2 & 3. Maintenance Rule Implementation, Personnel Performance During Non-Routine Plant Evolutions. (82 page(s), 11/12/2002)
- ML011650268 - IR 05000336-01-04; on 04/01-05/12/01; Dominion Nuclear Connecticut, Inc., Millstone Nuclear Power Station; Unit 2. Maintenance Risk Assessments and Emergent Work Evaluation, Cross-cutting Issues, Licensee Identified Violations. (35 page(s), 6/12/2001)
- ML011130145 - LER 001-002-00 for Millstone Nuclear Power Station Units 2 and 3 Re Incomplete Post-Maintenance Testing for Containment Isolation Valves. (5 page(s), 4/16/2001)
- ML011770314 - LER 01-002-01 for Millstone Nuclear Power Station, Units 2 and 3 regarding Incomplete Post-Maintenance Testing for Containment Isolation Valves. (5 page(s), 6/18/2001)
- ML051450448 - Main Steam Safety Valve Testing, Reference Procedure SP 2730B. (22 page(s), 3/17/2005)
- ML051450452 - Letter from Terry Barnes to Dominion Nuclear Re Certification of Compliance/Conformance. (4 page(s), 2/14/2005)
- ML051450453 - Engineering Evaluation M#-EV-98-0183, "MSSV Set Pressure Test Validation." (5 page(s), 12/30/1998)
- ML051450455 - Main Steam Safety Values Testing; Work Order M2 02 07951. (59 page(s), 3/24/2003)
- ML051450459 - Troubleshooting Sheet - UAC 4 Distorted Output. (3 page(s), 3/7/2005)
- ML051450463 - 1566-2 Hydroset Calibration Certification. (2 page(s), 4/19/2002)
- ML051450466 - Action Request Report. (9 page(s), 4/5/2005)
- ML051450470 - U2 & U3 Main Steam Safety Valve Set Pressure Confirmation Uses Vendor M&TE, That MPS Did Not Validate the Vendors V&V Process. (2 page(s), 4/5/2005)
- ML051450478 - Test information. (4 page(s), 5/20/2005)
- ML051450494 - Main Steam Safety Valve Set Pressure Test Validation. (4 page(s), 12/23/2004)
- ML051450497 - Sequence of Events MP2 Reactor Trip, March 15, 2004. (8 page(s), 3/15/2004)
- ML051450499 - Millstone Condition Report CR-04-02514. (5 page(s), 10/8/2004)
- ML051450501 - Millstone Condition Report CR-04-02514. (6 page(s), 9/27/2004)
- ML051450503 - Handwritten Notes related to CR-04-02514. (1 page(s), 5/20/2005)
- ML051450504 - Management Readiness Review Prior to U2 Reactor Startup. (3 page(s), 3/17/2004)
- ML051450506 - Handwritten Note Re Millstone. (2 page(s), 4/8/2005)
- ML051450508 - CR-05-03129; 2-MS-241 Failed As-Found Set Pressure Testing of 2730B. (1 page(s), 4/12/2005)
- ML051450511 - Handwritten notes re SORC Meeting for Startup. (1 page(s), 3/19/2004)
- ML051450513 - Branch 6, Management Directive 8.3 Check Sheet for 3/6/04 Millstone Unit 2 Turbine Trip. (2 page(s), 5/20/2005)
- ML051450517 - Branch 6, Management Directive 8.3 Check Sheet for 3/15/04 Millstone Unit 2 Turbine Trip. (2 page(s), 5/20/2005)
- ML051450519 - Millstone Unit 2 -MD 8.3 Evaluation - March 15, 2004 Trip. (1 page(s), 3/22/2004)
- ML051450521 - Email Re: MD 8.3 Review for Deterministic Aspects for Both Millstone Unit 2 Trips. (1 page(s), 3/22/2004)
- ML051450523 - Partial draft of IR for Millstone Units 2 & 3 (IR 2005-002). (3 page(s), 5/20/2005)
- ML051450505 - Fax containing an email and report re CR-04-9086. (10 page(s), 12/17/2004)
- ML051450512 - Draft Findings Re Safety Valves - IR 2005-02. (2 page(s), 5/20/2005)
- ML051450516 - Draft exit notes for third quarter 2004 resident inspector IR. (2 page(s), 5/20/2005)
- ML051450522 - Technical Evaluation for Evaluation of Pressure Entering the Enclosure Building Filtration Region On Main Steam Safety Valve Lift Millstone Unit 2. (6 page(s), 12/22/2004)
- ML051450524 - Handwritten notes re Millstone Unit 3. (6 page(s), 4/17/2005)
- ML051450531 - Rev. 0, Event Review Team Timeline - March 2003 MP-2 Reactor Trip. (15 page(s), 3/17/2003)
- ML051450533 - Event Notification Report for April 26, 2005. (2 page(s), 4/26/2005)
- ML051450537 - PNO-I-05-017: Alert Declared at Millstone 3 Due to Main Steam Safety Valve Not Reseating After an SI Actuation on Low Main Steam Line Pressure. (2 page(s), 4/18/2005)
- ML051450539 - Email Re: Action: MD 8.3 Review for Millstone Scram with Complications. (1 page(s), 4/18/2005)
- ML051450540 - Alert Declared at Millstone Unit 3 on Sunday. (3 page(s), 4/19/2005)