Home > NRC Library > ADAMS Public Documents
Letter Transmitting "Salem Generating Station Unit No. 1 Initial Groundwater Investigation Report & Remedial Investigation Work Plan Addendum."
Accession Number: ML040500559
Date Released: Friday, February 27, 2004
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML040500560 - Letter Transmitting "Salem Generating Station Unit No. 1 Initial Groundwater Investigation Report & Remedial Investigation Work Plan Addendum." (2 page(s), 2/2/2004)
- ML040510112 - "Salem Generating Station Unit No. 1 Initial Groundwater Investigation Report & Remedial Investigation Work Plan Addendum." (138 page(s), 1/31/2004)
- ML040500563 - Drawing No. 2, "Station Layout." (1 page(s), 11/11/2003)
- ML040500564 - Drawing No. 3, "Regional Cross Sections." (1 page(s), 9/26/2003)
- ML040500565 - Drawing No. 4, "Surface Elevation Clay, Confining - Unit." (1 page(s), 11/20/2003)
- ML040500567 - Drawing No. 5, "Cross Section A-A'." (1 page(s), 9/26/2003)
- ML040500568 - Drawing No. 6, "Cross Section B-B'." (1 page(s), 9/26/2003)
- ML040500569 - Drawing No. 7, "Facility Cross Section C-C'." (1 page(s), 9/26/2003)
- ML040500571 - Drawing No. 8, "Facility Cross Section D-D'." (1 page(s), 9/26/2003)
- ML040500572 - Drawing No 9, "Facility Cross Section E-E'." (1 page(s), 9/26/2003)
- ML040500574 - Drawing No. 10, "Groundwater Contour Map Shallow Water Table Aquifer June 26, 2003." (1 page(s), 9/26/2003)
- ML040500575 - Drawing No. 11, "Boring Locations Supplemental Groundwater Investigation (August 2003)." (1 page(s), 9/26/2003)
- ML040500578 - Drawing No. 12, "Tritium Results - Supplemental Groundwater Investigation (August 2003) Draft." (1 page(s), 9/26/2003)
- ML040500580 - Drawing No. 13, "Proposed Monitoring Well Locations." (1 page(s), 9/26/2003)