Home > NRC Library > ADAMS Public Documents
Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project.
Accession Number: ML021820383
Date Released: Wednesday, July 10, 2002
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML021760733 - Part 1 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project. (196 page(s), 6/14/2002)
- ML021820281 - Part 2 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 1, Helium & Lead Tank Cooling Water Lines. (199 page(s), 6/14/2002)
- ML021770501 - Part 3 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 3, Reactor Building 2nd Floor Above 2 Meters. (209 page(s), 6/14/2002)
- ML021820297 - Part 4 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Attachment 6.14 Survey Download Data Sheet. (249 page(s), 6/14/2002)
- ML021770562 - Part 5 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 7, Reactor Building Ventilation. (252 page(s), 6/14/2002)
- ML021770531 - Part 6 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 9, Unaffected Asphalt & Concrete Yard Areas. (155 page(s), 6/14/2002)
- ML021820352 - Part 7 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 12, Process Equipment Room Below 2 Meters. (183 page(s), 6/14/2002)
- ML021820353 - Part 8 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 14, Yard Open Land Areas. (246 page(s), 6/14/2002)
- ML021770600 - Part 9 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 15, Air Compressor Room. (239 page(s), 6/14/2002)
- ML021780180 - Part 10 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Section 10, Package 16 MCC Panel Area Direct & Removable Beta Results. (193 page(s), 6/14/2002)
- ML021820365 - Part 11 of 11, Georgia Institute of Technology, Transmittal of Final Survey Report, Georgia Tech Research Reactor (GTRR) D&D Project, Final Survey Package 19, Bismuth Leak Area. (212 page(s), 6/14/2002)