Guide
Number |
Title |
Revision Number |
Publish
Date |
Additional
Information |
1.21 |
Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste
- HISTORY
- 01/2021 – DG-1377 issued as proposed Revision 3
- 09/2019 – Periodic Review performed recommended revising
- 03/2015 – Periodic Review of Revision 2 – Issues identified for future consideration
- 10/2008 – DG-1186 issued as proposed Revision 2
- 12/1971 – Atomic Energy Commission issued Safety Guide 21, "Measuring and Reporting of Effluents from Nuclear Power Plants," which is the predecessor of RG 1.21, Rev. 1
|
3 |
09/2021 |
|
2 |
06/2009 |
|
1 |
06/1974 |
|
0 |
12/1971 |
|
1.22 |
Periodic Testing of Protection System Actuation Functions (Safety Guide 22) |
0 |
02/1972 |
Periodic Review – March 2022 No Action
Reviewed in 2012 – No issues identified |
1.23 |
Meteorological Monitoring Programs for Nuclear Power Plants
- HISTORY
- DG-1164, Third Proposed Revision 1, published 10/2006
- Draft ES 926-4, Second Proposed Revision 1, entitled "Meteorological Measurement Program for Nuclear Power Plants," published 04/1986
- Draft SS 926-4, First Proposed Revision 1, entitled "Meteorological Programs In Support of Nuclear Power Plants," published 09/1980
- Revision 0, entitled "Onsite Meteorological Programs," was issued as Safety Guide 23
|
1 |
03/2007 |
Periodic Review – March 2023 Considerations
Reviewed in 2013 – No issues identified |
0 |
02/1972 |
|
1.24 |
Assumptions Used for Evaluating the Potential Radiological Consequences of a Pressurized Water Reactor Radioactive Gas Storage Tank Failure (Safety Guide 24) |
0 |
03/1972 |
Reviewed in 2016 – Issues identified for future consideration |
1.25 |
Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Storage Facility for Boiling and Pressurized Water Reactors (Safety Guide 25)
(Withdrawn – See 81 FR 89510, 12/12/2016) |
W |
12/2016 |
|
0 |
03/1972 |
|
1.26 |
Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants
- HISTORY
- DG 1371, Proposed Revision 6, published 04/2021
- DG-1314, Proposed Revision 5, published 04/2015
- DG-1152, Proposed Revision 4, published 11/2006
- Revision 3 was issued for public comment on 02/1976
|
6 |
12/2021 |
|
5 |
02/2017 |
|
4 |
03/2007 |
|
3 |
02/1976 |
|
2 |
06/1975 |
|
1 |
09/1974 |
|
0 |
03/1972 |
|
1.27 |
Ultimate Heat Sink for Nuclear Power Plants
|
3 |
11/2015 |
|
2 |
01/1976 |
|
1 |
03/1974 |
|
0 |
03/1972 |
|
1.28 |
Quality Assurance Program Criteria (Design and Construction)
- HISTORY
- DG-1403, Proposed Revision 6, published 04/2023
- DG-1326, Proposed Revision 5, published 03/2017
- DG-1215, Proposed Revision 4, published 07/2009
- Prior to the issuance of Revision 4, RG 1.28 was entitled “Quality Assurance Program Requirements (Design and Construction)”
|
6 |
09/2023 |
|
5 |
10/2017 |
|
4 |
06/2010 |
|
3 |
08/1985 |
|
2 |
02/1979 |
|
1 |
03/1978 |
|
0 |
06/1972 |
|
1.29 |
Seismic Design Classification for Nuclear Power Plants
|
6 |
07/2021 |
|
5 |
07/2016 |
|
4 |
03/2007 |
|
3 |
09/1978 |
|
2 |
02/1976 |
|
1 |
08/1973 |
|
0 |
06/1972 |
|
1.30 |
Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment (Safety Guide 30)
|
1 |
04/2024 |
|
0 |
08/1972 |
Periodic Review September 2022 – Revise
Periodic Review December 2018 – Revise |
1.31 |
Control of Ferrite Content in Stainless Steel Weld Metal
|
4 |
10/2013 |
Reviewed in 2016 – No issues identified |
3 |
04/1978 |
|
2 |
05/1977 |
|
1 |
06/1973 |
|
0 |
08/1972 |
|
1.32 |
Criteria for Power Systems for Nuclear Power Plants
|
DG |
08/2024 |
DG-1420 |
3 |
03/2004 |
Reviewed in 2017 – No issues identified |
2 |
02/1977 |
|
1 |
03/1976 |
|
0 |
08/1972 |
|
1.33 |
Quality Assurance Program Requirements (Operation)
- HISTORY
- DG-1300, Quality Assurance Program Requirements (Operations), published 02/2013
- Draft RS 902-4, Second Proposed Revision 3, published 11/1980
- Draft RS 902-4, First Proposed Revision 3, published 08/1979
|
3 |
06/2013 |
Periodic Review – July 2023
Considerations |
2 |
02/1978 |
|
1 |
01/1977 |
|
0 |
11/1972 |
|
1.34 |
Control of Electroslag Weld Properties
|
1 |
03/2011 |
Reviewed in 2016 – No issues identified |
0 |
12/1972 |
|
1.35 |
Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments
(Withdrawn – See 80 FR 52067, 08/27/2015)
|
W |
08/2015 |
|
3 |
07/1990 |
|
2 |
01/1976 |
|
1 |
06/1974 |
|
0 |
02/1973 |
|
1.35.1 |
Determining Prestressing Forces for Inspection of Prestressed Concrete Containments
|
0 |
07/1990 |
Reviewed in 2015 – Issues identified for future consideration |
1.36 |
Nonmetallic Thermal Insulation for Austenitic Stainless Steel
|
1 |
05/2015 |
|
0 |
02/1973 |
|
1.37 |
Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants
(Withdrawn – See 79 FR 38963, 07/09/2014)
|
W |
07/2014 |
|
1 |
03/2007 |
|
0 |
03/1973 |
|
1.38 |
Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants
(Withdrawn – See 75 FR 54921, 09/09/2010) |
W |
09/2010 |
|
2 |
05/1977 |
|
1 |
10/1976 |
|
0 |
03/1973 |
|
1.39 |
Housekeeping Requirements for Water-Cooled Nuclear Power Plants
(Withdrawn – See 75 FR 70044, 11/16/2010) |
W |
11/2010 |
|
2 |
09/1977 |
|
1 |
10/1976 |
|
0 |
03/1973 |
|
1.40 |
Qualification of Continuous Duty Safety-Related Motors for Nuclear Power Plants
|
1 |
02/2010
|
Reviewed in 2016 – No issues identified |
0 |
03/1973 |
|