The requested meeting could not be found.
- Welcome and Help
- Important Information for Attendees
- NRC Public Meetings (NUREG/BR-0297, Revision 1)
By default, this page lists all upcoming meetings (From date = today). You can search via keywords as well as date ranges for past or upcoming meetings. Click Reset to return the list to all upcoming meetings.
Displaying 1 - 20 of 25
Meeting to discuss upcoming license amendment requests regarding Calvert Cliffs Nuclear Power Plant
Participation: Closed
Meeting Canceled
The purpose of this meeting is for the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) to discuss TVA's plans for subsequent license renewal for Watts Bar Nuclear Plant, Units 1 and 2.
Participation: Closed
Affirmation Session (Public Meeting) (Tentative) a) Direct Final Rule: Exemptions from Material Licensing (Tentative) b) Constellation Energy Generation, LLC (Christopher M. Crane Clean Energy Center); Appeal of LBP-26-6 (Ruling on Intervention Petition) (Tentative)
Participation: Open
The purpose of this meeting for Standard Nuclear to present on their planned design for the Standard Fresh Fuel Container.
Participation: Partially Closed
The purpose of this meeting between the U.S. Nuclear Regulatory Commission (NRC) and DTE Electric Company (DTE) is to discuss a proposed license amendment to revise the site’s emergency plan.
Participation: Observation Meeting
Members of the public may listen to the oral argument on a listen-only telephone line by dialing: (301) 576-2978 and entering passcode 626 023 098#. After successful entry of the passcode, you will hear the following message: “You are not allowed to unmute. To raise your hand…
Participation: Open
Members of the public may listen to the oral argument on a listen-only telephone line by dialing: (301) 576-2978 and entering passcode 626 023 098#. After successful entry of the passcode, you will hear the following message: “You are not allowed to unmute. To raise your hand…
Participation: Open
This pre-application meeting between NRC and University of Utah will discuss two license amendment requests: changing the pH Limit and changing the fuel inspection periodicity.
Participation: Observation Meeting
The purpose of the meeting is to discuss Susquehanna Nuclear, LLC's (Susquehanna, the licensee) plan to submit a proposed license amendment request to revise the the facility's currently approved Emergency Plan Emergency Action Level (EAL) scheme, which is based on the…
Participation: Observation Meeting
For the NRC staff and Framatome Representatives to hold pre-submittal discussions on the ANP-10348, Revision 0, Fluence Methodologies for Subsequent License Renewal, topical report supplement.
Participation: Closed
As a part of the preapplication review phase, NRC plans to discuss the readiness review for Alva Energy's Topical Report R-26-001-P-TR-00 regarding balance of plant concepts for large extended power uprates.
Participation: Closed
The purpose of the meeting is for Robatel Technologies, LLC to present to the U.S. Nuclear Regulatory Commission and discuss the proposed Letters of Authorization and Amendment requests to the Model No. RT-100 Packaging, Certificate of Compliance No. 9365.
Participation: Partially Closed
The U.S. Nuclear Regulatory Commission (NRC) staff will hold a meeting with
representatives from ARC Clean Technology (ARC) to continue discussions of seismic isolation
technical topics pertaining to the ARC-100 sodium-cooled fast reactor design. During this
…
Participation: Open
The purpose of this meeting is to inform the public about Executive Order (EO) 14300 proposed rule Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight.
Participation: Information Meeting with Q&A
The Purpose of this meeting is for the NRC Staff and Framatome Representatives to discuss Limitations and Conditions for the ANP-10354, Revision 0 Topical Report Safety Evaluation.
Participation: Closed
The purpose of this meeting is for OrganiCore Nuclear, Inc. to present to the NRC staff its planned OC-80 Advanced Small Modular Reactor.
This is an introductory meeting to begin pre-application engagement.
Participation: Partially Closed
The purpose of this meeting is for Oklo to provide information to the staff on its proposed reliability and integrity management (RIM) program for the Aurora powerhouse and for the staff to share feedback.
Participation: Partially Closed
The purpose of this meeting is to discuss the draft interim staff guidance (ISG), DANU-ISG-2023-01, Rev. 1, Material Compatibility for Non-Light-Water Reactors, which is available for public comment until November 5, 2026 under Docket ID NRC-2022-0215 .
Participation: Information Meeting with Q&A
Commission Meeting: Nuclear Regulatory Commission Reorganization First 100 Days: Enhancing Reactor and Materials Oversight Integration and Performance (Public Meeting)
Participation: Open