Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

American Centrifuge Plant (ACP)

Life cycle timeline showing current status, consisting of 6 various stages of status (Pre-Licensing, Licensing, Construction, Operating, Operating with Intent to Decommission, Decommissioning) with the current status shown in bright green color, and the other available status are greyed out

Aerial photo of USEC - American Centrifuge Plant, Piketon, OH

 

Location: Piketon, OH
Licensee: Centrus Energy Corp.
Operating License: SNM-2011
License Expires: April 13, 2037
Docket Number: 07007004

Facility Type: Uranium Enrichment – Gas Centrifuge
Facility Status: Construction (inactive)