United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > Facility Locator > Fuel Cycle Facilities > Global Laser Enrichment (GLE)

Global Laser Enrichment (GLE)

Life cycle timeline showing current status, consisting of 6 various stages of status (Pre-Licensing, Licensing, Construction, Operating, Operating with Intent to Decommission, Decommissioning) with the current status shown in bright green color, and the other available status are greyed out

Aerial photo of Global Laser Enrichment, Wilmington, NC  

Location: Wilmington, NC
Licensee: GE-Hitachi Global Laser Enrichment, LLC
Operating License: SNM-2019
License Expires: September 25, 2052
Docket Number: 07007016

Facility Type: Uranium Enrichment – Laser Separation
Facility Status: Construction (inactive)

Press Releases
Upcoming Meetings
Past Meetings

Operating

No content exists for this section at this time.

Back to top

Operating with Intent to Decommission

No content exists for this section at this time.

Back to top

Decommissioning

No content exists for this section at this time.

Back to top

Page Last Reviewed/Updated Wednesday, March 15, 2017